X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484041709032

Well Details

Well ID: 0484041709032
Loading map...
Location: 03/09-17-048-04W4/2
Location Alias: 03/09-17-48-04 W4M
Location Alias 2: 03/09-17-048-04 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 04
Section: 17
County/Municipality: County of Vermilion River
Well Name: DAYLIGHT 103 WILDMERE 9-17-48-4
Operator Name: Gear Energy Ltd.
License Number: 0362424
License Date: 2006-08-30
License Status: Suspension
Spud Date: 2006-09-12
Final Drill Date: 2006-09-14
Well Total Depth: 726.00 m
Surface Hole Latitude: 53.141037
Surface Hole Longitude: -110.544153

For data sources see[1][2]

Well History

Date Event
2006-08-30 Obtained License
2006-09-12 Surface Casing Operation Performed
2006-09-13 Direction Drilling Operation Performed - Deviate
2006-09-14 Finished Drilling
2006-09-14 Well Mode changed to Drilled and Cased
2006-09-15 Production Casing Operation Performed
2006-09-15 Well Log Performed
2006-09-16 Rig Released
2006-10-11 Perforation Treatment Performed - Jet Perforation
2006-10-11 Well Log Performed
2011-01-19 Perforation Treatment Performed - Jet Perforation
2011-01-19 Well Log Performed
2013-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-08 Perforation Treatment Performed - Jet Perforation
2013-03-08 Plug Back Performed
2013-03-08 Well Began Production
2013-03-08 Well Fluid changed to Crude Oil
2013-03-08 Well Log Performed
2013-03-08 Well Mode changed to Pumping
2018-08-01 Well Fluid changed to Crude Oil
2018-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-09-13 180.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-11 Perforation 691.00 694.00 20
2011-01-19 Perforation 693.50 697.00 26
2011-01-19 Perforation 690.50 693.50 26
2013-03-08 Packing Device Capped w/Cement 680.50 688.50 0
2013-03-08 Perforation 601.00 603.00 26
2013-03-08 Perforation 597.00 599.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6037 0.0 0.0 0.0
2014 8664 0.0 0.0 0.0
2015 8724 0.0 0.0 0.0
2016 7467 0.0 0.0 0.0
2017 8537 0.0 0.0 0.0
2018 1128 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References