X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484270901000

Well Details

Well ID: 0484270901000
Loading map...
Location: 00/01-09-048-27W4/0
Location Alias: 00/01-09-48-27 W4M
Location Alias 2: 00/01-09-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 09
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE C.P.R. NO. G-13
Operator Name: Imperial Oil Resources Limited
License Number: 0007372
License Date: 1953-11-24
License Status: Abandoned
Spud Date: 1953-11-26
Final Drill Date: 1953-12-22
Well Total Depth: 2049.70 m
Surface Hole Latitude: 53.122097
Surface Hole Longitude: -113.881553

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-11-24 Obtained License
1953-12-19 Production Casing Operation Performed
1953-12-20 Well Log Performed
1953-12-22 Finished Drilling
1953-12-22 Perforation Treatment Performed - Open-Hole Completion
1953-12-22 Well Mode changed to Drilled and Cased
1953-12-26 Well Began Production
1953-12-26 Well Fluid changed to Crude Oil
1953-12-26 Well Mode changed to Flowing
1984-05-27 Well Log Performed
1985-11-28 Well Log Performed
1986-03-06 Well Log Performed
1986-06-11 Well Log Performed
1986-11-05 Well Log Performed
1987-02-23 Well Log Performed
1987-08-10 Well Log Performed
1987-11-09 Well Log Performed
1988-02-10 Well Log Performed
1988-05-10 Well Log Performed
1988-08-03 Well Log Performed
1988-11-07 Well Log Performed
1989-02-14 Well Log Performed
1989-06-05 Well Log Performed
1989-08-10 Well Log Performed
1989-10-05 Well Log Performed
1990-02-07 Well Log Performed
1990-05-23 Well Log Performed
1990-08-13 Well Log Performed
1991-05-21 Well Log Performed
1991-08-16 Well Log Performed
1991-11-04 Well Log Performed
1992-08-19 Well Log Performed
1992-11-30 Well Log Performed
1993-02-09 Well Log Performed
1993-05-27 Well Log Performed
1993-06-14 Well Log Performed
1993-07-19 Well Log Performed
1993-11-01 Well Log Performed
1994-02-23 Well Log Performed
1995-02-13 Well Log Performed
1995-08-31 Well Log Performed
1995-11-17 Well Log Performed
1996-02-05 Well Log Performed
1996-07-31 Well Log Performed
1996-11-01 Well Log Performed
1997-05-13 Well Log Performed
1997-05-27 Well Log Performed
1997-08-07 Perforation Treatment Performed - Open-Hole Completion
1997-08-08 Perforation Treatment Performed - Chemical Squeeze
1998-02-03 Well Log Performed
1998-08-25 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-03-02 Well Log Performed
2011-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-05 Plug Back Performed
2011-03-05 Well Fluid changed to Crude Oil
2011-03-05 Well Log Performed
2011-03-05 Well Mode changed to Abandoned Zone
2011-03-06 Perforation Treatment Performed - Jet Perforation
2011-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-07 Perforation Treatment Performed - Jet Perforation
2011-03-07 Perforation Treatment Performed - Remedial Casing
2011-03-07 Well Log Performed
2011-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-08 Perforation Treatment Performed - Remedial Casing
2011-03-09 Perforation Treatment Performed - Jet Perforation
2011-03-09 Well Log Performed
2011-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-17 Perforation Treatment Performed - Remedial Casing
2012-05-22 Well Abandoned
2012-05-22 Well Fluid changed to Crude Oil
2012-05-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-12-22 Open Hole/Barefoot Completion 1992.50 2023.90 0
2011-03-08 Packing Device Capped w/Cement 480.00 494.00 0
2011-03-09 Perforation 347.00 348.00 17
2011-03-09 Perforation 309.00 310.00 17
2011-03-09 Perforation 260.00 261.00 17
2011-03-09 Perforation 205.00 206.00 17
2011-03-17 Remedial Casing Cementing 205.00 348.00 0
2011-03-17 Packing Device Capped w/Cement 186.00 194.00 0
1997-08-07 Open Hole/Barefoot Completion 1992.50 2049.70 0
1997-08-08 Chemical Squeeze 1992.50 2049.70 0
2011-03-05 Packing Device Capped w/Cement 1447.00 1870.00 0
2011-03-06 Perforation 754.00 755.00 17
2011-03-07 Remedial Casing Cementing 754.00 755.00 0
2011-03-07 Packing Device Capped w/Cement 720.00 741.50 0
2011-03-07 Perforation 504.00 505.00 17
2011-03-08 Remedial Casing Cementing 504.00 505.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 1261 0.0 0.0 0.0
1971 217 0.0 0.0 0.0
1977 721 0.0 0.0 0.0
1978 2269 0.0 0.0 0.0
1979 3027 0.0 0.0 0.0
1980 4329 0.0 0.0 0.0
1981 2733 0.0 0.0 0.0
1982 2338 0.0 0.0 0.0
1983 2830 0.0 0.0 0.0
1984 8101 0.0 0.0 0.0
1985 8460 0.0 0.0 0.0
1986 8056 0.0 0.0 0.0
1987 7874 0.0 0.0 0.0
1988 8188 0.0 0.0 0.0
1989 5840 0.0 0.0 0.0
1990 4029 0.0 0.0 0.0
1991 4768 0.0 0.0 0.0
1992 6012 0.0 0.0 0.0
1993 6455 0.0 0.0 0.0
1994 2674 0.0 0.0 0.0
1995 5355 0.0 0.0 0.0
1996 5592 0.0 0.0 0.0
1997 4987 0.0 0.0 0.0
1998 7589 0.0 0.0 0.0
1999 8680 0.0 0.0 0.0
2000 8383 0.0 0.0 0.0
2001 7992 0.0 0.0 0.0
2002 8745 0.0 0.0 0.0
2003 7798 0.0 0.0 0.0
2004 8497 0.0 0.0 0.0
2005 8296 0.0 0.0 0.0
2006 2090 0.0 0.0 0.0

For data sources see[5]

References