X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271609002

Well Details

Well ID: 0484271609002
Loading map...
Location: 00/09-16-048-27W4/2
Location Alias: 00/09-16-48-27 W4M
Location Alias 2: 00/09-16-048-27 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO C2 WIZARD 9-16MU-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0004239
License Date: 1952-02-18
License Status: Abandoned
Spud Date: 1952-02-18
Final Drill Date: 1952-03-26
Well Total Depth: 2024.00 m
Surface Hole Latitude: 53.143568
Surface Hole Longitude: -113.881574

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-18 Obtained License
1952-03-16 Drill Stem Test Performed
1952-03-17 Drill Stem Test Performed
1952-03-22 Production Casing Operation Performed
1952-03-26 Finished Drilling
1952-03-26 Perforation Treatment Performed - Open-Hole Completion
1952-03-26 Well Mode changed to Drilled and Cased
1958-11-08 Perforation Treatment Performed - Jet Perforation
1958-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-06 Well Began Production
1958-12-06 Well Fluid changed to Crude Oil
1958-12-06 Well Mode changed to Pumping
1971-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-03 Perforation Treatment Performed - Cement Squeeze
1972-10-03 Well Fluid changed to Crude Oil
1972-10-03 Well Mode changed to Abandoned Zone
1972-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-30 Perforation Treatment Performed - Fractured
1974-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-08 Well Log Performed
1984-06-13 Perforation Treatment Performed - Open-Hole Completion
1984-06-13 Well Log Performed
1984-06-18 Well Log Performed
1986-06-23 Well Log Performed
1986-06-24 Well Log Performed
1987-07-14 Well Log Performed
1987-07-21 Well Log Performed
1987-07-22 Well Log Performed
1987-08-24 Well Log Performed
1987-08-30 Perforation Treatment Performed - Cement Squeeze
1987-08-30 Plug Back Performed
1987-09-03 Liner Casing Operation Performed
1987-09-08 Well Log Performed
1987-12-05 Well Log Performed
1987-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-06 Perforation Treatment Performed - Jet Perforation
1987-12-06 Well Log Performed
1990-06-23 Well Log Performed
1990-06-24 Perforation Treatment Performed - Cement Squeeze
1990-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-28 Perforation Treatment Performed - Jet Perforation
1990-06-28 Well Log Performed
1990-06-29 Perforation Treatment Performed - Cement Squeeze
1990-06-29 Well Log Performed
1990-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-05 Well Log Performed
1990-07-06 Well Log Performed
1998-01-08 Perforation Treatment Performed - Jet Perforation
2004-07-17 Well Log Performed
2004-08-05 Well Log Performed
2004-08-06 Perforation Treatment Performed - Casing Patch (Over Perfs)
2004-08-06 Well Log Performed
2005-03-16 Perforation Treatment Performed - Jet Perforation
2005-03-16 Well Log Performed
2005-08-24 Perforation Treatment Performed - Jet Perforation
2005-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-06-05 Perforation Treatment Performed - Jet Perforation
2006-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-04-10 Perforation Treatment Performed - Jet Perforation
2007-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-31 Well Log Performed
2013-10-04 Well Log Performed
2013-10-05 Well Log Performed
2013-10-06 Perforation Treatment Performed - Jet Perforation
2013-10-06 Well Log Performed
2013-10-09 Perforation Treatment Performed - Cement Plug
2013-10-09 Perforation Treatment Performed - Remedial Casing
2013-10-09 Plug Back Performed
2013-10-10 Perforation Treatment Performed - Jet Perforation
2013-10-11 Perforation Treatment Performed - Cement Plug
2013-10-11 Perforation Treatment Performed - Remedial Casing
2013-10-12 Perforation Treatment Performed - Cement Plug
2013-10-12 Perforation Treatment Performed - Jet Perforation
2013-10-12 Perforation Treatment Performed - Remedial Casing
2013-10-12 Well Log Performed
2014-11-12 Well Abandoned
2014-11-12 Well Fluid changed to Crude Oil
2014-11-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-26 Open Hole/Barefoot Completion 1847.70 1894.00 0
1974-03-12 Acid Treatment 1829.40 1994.60 0
1974-08-06 Acid Treatment 1829.40 1994.60 0
1980-10-27 Acid Treatment 1829.40 1994.60 0
1984-06-13 Open Hole/Barefoot Completion 1847.70 2024.00 0
1987-08-30 Cement Squeeze 1825.80 2024.00 0
1987-12-06 Perforation 1870.00 1870.50 13
1987-12-06 Perforation 2000.50 2001.00 13
1987-12-06 Acid Treatment 2000.50 2001.00 0
1987-12-06 Acid Treatment 1870.00 1870.50 0
1990-06-24 Cement Squeeze 1870.00 1870.50 0
1958-11-08 Perforation 1752.60 1756.30 13
1990-06-28 Perforation 1870.00 1870.50 13
1990-06-28 Perforation 2004.00 2005.00 13
1990-06-28 Perforation 2007.00 2008.00 13
1990-06-28 Perforation 2010.00 2011.00 13
1990-06-28 Acid Treatment 2004.00 2011.00 0
1990-06-29 Cement Squeeze 2000.50 2001.00 0
1990-07-05 Acid Treatment 2007.00 2008.00 0
1990-07-05 Acid Treatment 1870.00 1870.50 0
1998-01-08 Perforation 2012.80 2013.20 20
1998-01-08 Perforation 2015.00 2015.50 20
1958-11-08 Perforation 1764.80 1768.40 13
2004-08-06 Casing Patch 1870.00 1870.50 0
2005-03-16 Perforation 2002.50 2004.50 14
2005-08-24 Perforation 1978.00 1984.00 20
2005-08-29 Acid Treatment 1978.00 1984.00 0
2006-06-05 Perforation 1935.00 1941.00 20
2006-06-06 Acid Treatment 1935.00 1941.00 0
2007-04-10 Perforation 1890.00 1896.00 20
2007-04-11 Acid Treatment 1890.00 1896.00 0
2013-10-06 Perforation 711.00 712.00 17
2013-10-06 Perforation 473.60 474.60 17
1958-11-09 Acid Treatment 1752.60 1768.40 0
2013-10-09 Remedial Casing Cementing 473.60 712.00 0
2013-10-09 Cement Plug 468.10 1679.00 0
2013-10-10 Perforation 398.00 399.00 17
2013-10-10 Perforation 363.00 364.00 17
2013-10-10 Perforation 326.00 327.00 17
2013-10-10 Perforation 304.00 305.00 17
2013-10-10 Perforation 274.00 275.00 17
2013-10-10 Perforation 258.00 259.00 17
2013-10-10 Perforation 246.00 247.00 17
2013-10-10 Perforation 234.00 235.00 17
1971-07-16 Acid Treatment 1847.70 1894.00 0
2013-10-10 Perforation 214.00 215.00 17
2013-10-10 Perforation 198.40 199.40 17
2013-10-11 Remedial Casing Cementing 198.40 399.00 0
2013-10-11 Cement Plug 196.10 467.10 0
2013-10-12 Perforation 191.00 191.50 17
2013-10-12 Remedial Casing Cementing 191.00 191.50 0
2013-10-12 Cement Plug 185.10 195.10 0
2013-10-12 Cement Plug 3.90 185.10 0
1972-10-03 Cement Squeeze 1752.60 1768.40 0
1972-10-23 Acid Treatment 1829.40 1994.60 0
1972-10-30 Fracture 1829.40 1994.60 0
1972-10-30 Acid Treatment 1829.40 1994.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8759 0.0 0.0 0.0
1968 8529 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 5416 0.0 0.0 0.0
1971 7282 0.0 0.0 0.0
1972 2678 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References