X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271610000

Well Details

Well ID: 0484271610000
Loading map...
Location: 00/10-16-048-27W4/0
Location Alias: 00/10-16-48-27 W4M
Location Alias 2: 00/10-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE NO. C-3
Operator Name: Imperial Oil Resources Limited
License Number: 0004296
License Date: 1952-03-01
License Status: Abandoned
Spud Date: 1952-03-18
Final Drill Date: 1952-04-29
Well Total Depth: 2036.00 m
Surface Hole Latitude: 53.143292
Surface Hole Longitude: -113.887590

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-01 Obtained License
1952-04-04 Drill Stem Test Performed
1952-04-17 Drill Stem Test Performed
1952-04-18 Drill Stem Test Performed
1952-04-25 Production Casing Operation Performed
1952-04-29 Finished Drilling
1952-04-29 Well Mode changed to Drilled and Cased
1952-04-30 Perforation Treatment Performed - Open-Hole Completion
1952-04-30 Well Began Production
1952-04-30 Well Fluid changed to Crude Oil
1952-04-30 Well Mode changed to Flowing
1952-07-02 Well Fluid changed to Crude Oil
1952-07-02 Well Mode changed to Gas Lift
1971-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-23 Perforation Treatment Performed - Open-Hole Completion
1982-01-28 Perforation Treatment Performed - Chemical Squeeze
1984-01-20 Well Log Performed
1984-01-22 Perforation Treatment Performed - Open-Hole Completion
1984-01-22 Well Log Performed
1984-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-24 Perforation Treatment Performed - Chemical Squeeze
1984-09-04 Well Log Performed
1984-09-17 Well Log Performed
1985-02-08 Perforation Treatment Performed - Open-Hole Completion
1985-02-15 Liner Casing Operation Performed
1985-02-15 Perforation Treatment Performed - Cement Squeeze
1985-02-18 Well Log Performed
1985-02-20 Perforation Treatment Performed - Jet Perforation
1985-02-20 Well Log Performed
1985-02-22 Perforation Treatment Performed - Jet Perforation
1985-09-17 Perforation Treatment Performed - Cement Squeeze
1985-09-19 Perforation Treatment Performed - Jet Perforation
1985-09-20 Perforation Treatment Performed - Fractured
1988-06-30 Perforation Treatment Performed - Cement Squeeze
1988-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-01 Perforation Treatment Performed - Jet Perforation
1988-07-01 Well Log Performed
1990-12-12 Well Log Performed
1990-12-13 Perforation Treatment Performed - Cement Squeeze
1990-12-15 Perforation Treatment Performed - Cement Squeeze
1990-12-15 Perforation Treatment Performed - Jet Perforation
1990-12-17 Perforation Treatment Performed - Jet Perforation
1990-12-17 Well Log Performed
1990-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-19 Well Log Performed
1992-05-06 Well Log Performed
1993-01-24 Perforation Treatment Performed - Jet Perforation
1993-01-25 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-08-29 Well Log Performed
2011-08-30 Perforation Treatment Performed - Jet Perforation
2011-08-30 Well Log Performed
2011-08-31 Perforation Treatment Performed - Cement Plug
2011-08-31 Perforation Treatment Performed - Remedial Casing
2011-08-31 Plug Back Performed
2011-08-31 Well Fluid changed to Crude Oil
2011-08-31 Well Mode changed to Abandoned Zone
2011-09-07 Perforation Treatment Performed - Jet Perforation
2011-09-07 Well Log Performed
2011-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-08 Perforation Treatment Performed - Remedial Casing
2011-09-09 Perforation Treatment Performed - Jet Perforation
2011-09-09 Well Log Performed
2011-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-14 Perforation Treatment Performed - Cement Plug
2011-09-14 Perforation Treatment Performed - Remedial Casing
2012-05-17 Well Abandoned
2012-05-17 Well Fluid changed to Crude Oil
2012-05-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-30 Open Hole/Barefoot Completion 1939.10 1955.60 0
1985-02-20 Perforation 1992.30 1992.80 13
1985-02-22 Perforation 1983.60 1984.10 13
1985-09-17 Cement Squeeze 1983.60 1992.80 0
1985-09-19 Perforation 1993.20 1993.70 13
1985-09-20 Fracture 1993.20 1993.70 0
1988-06-30 Cement Squeeze 1993.20 1993.70 0
1988-07-01 Perforation 1945.70 1946.20 14
1988-07-01 Perforation 1998.80 2000.80 14
1988-07-01 Acid Treatment 1945.70 1946.20 0
1988-07-01 Acid Treatment 1998.80 2000.80 0
1971-07-16 Acid Treatment 1939.10 1955.60 0
1990-12-13 Cement Squeeze 1945.70 1946.20 0
1990-12-15 Perforation 1993.20 1993.70 13
1990-12-15 Cement Squeeze 1993.20 1993.70 0
1990-12-17 Perforation 1945.70 1946.20 13
1990-12-17 Perforation 2002.80 2003.80 13
1990-12-17 Perforation 2005.80 2006.80 13
1990-12-18 Acid Treatment 1945.70 2006.80 0
1993-01-24 Perforation 2009.80 2010.30 22
1993-01-24 Perforation 2013.30 2013.80 22
2011-08-30 Perforation 1318.90 1319.90 17
1977-09-23 Open Hole/Barefoot Completion 1939.10 1996.10 0
2011-08-30 Perforation 717.00 718.00 17
2011-08-31 Remedial Casing Cementing 717.00 1319.90 0
2011-08-31 Cement Plug 519.00 1935.00 0
2011-09-07 Perforation 466.30 467.30 17
2011-09-08 Remedial Casing Cementing 466.30 467.30 0
2011-09-08 Packing Device Capped w/Cement 447.00 456.50 0
2011-09-09 Perforation 263.00 264.00 17
2011-09-09 Perforation 218.00 219.00 17
2011-09-09 Perforation 198.00 199.00 17
2011-09-14 Remedial Casing Cementing 198.00 264.00 0
1982-01-28 Chemical Squeeze 1939.10 1996.10 0
2011-09-14 Cement Plug 200.00 450.00 0
2011-09-14 Packing Device Capped w/Cement 171.00 191.00 0
1984-01-22 Open Hole/Barefoot Completion 1939.10 2026.30 0
1984-01-24 Chemical Squeeze 1939.10 2026.30 0
1984-01-24 Acid Treatment 1939.10 2026.30 0
1985-02-08 Open Hole/Barefoot Completion 1939.10 2036.00 0
1985-02-15 Cement Squeeze 1939.10 2036.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7526 0.0 0.0 0.0
1968 7683 0.0 0.0 0.0
1969 8223 0.0 0.0 0.0
1970 6970 0.0 0.0 0.0
1971 5619 0.0 0.0 0.0
1972 6060 0.0 0.0 0.0
1973 5266 0.0 0.0 0.0
1974 5411 0.0 0.0 0.0
1975 6403 0.0 0.0 0.0
1976 3763 0.0 0.0 0.0
1977 2752 0.0 0.0 0.0
1978 3482 0.0 0.0 0.0
1979 5965 0.0 0.0 0.0
1980 7111 0.0 0.0 0.0
1981 6939 0.0 0.0 0.0
1982 3891 0.0 0.0 0.0
1983 6199 0.0 0.0 0.0
1984 7151 0.0 0.0 0.0
1985 3309 0.0 0.0 0.0
1986 6685 0.0 0.0 0.0
1987 6746 0.0 0.0 0.0
1988 5941 0.0 0.0 0.0
1989 8184 0.0 0.0 0.0
1990 5922 0.0 0.0 0.0
1991 2179 0.0 0.0 0.0
1992 4314 0.0 0.0 0.0
1993 1315 0.0 0.0 0.0
1994 2532 0.0 0.0 0.0
1995 4188 0.0 0.0 0.0
1996 8697 0.0 0.0 0.0
1997 8467 0.0 0.0 0.0
1998 8578 0.0 0.0 0.0
1999 6823 0.0 0.0 0.0
2000 8477 0.0 0.0 0.0
2001 8243 0.0 0.0 0.0
2002 8659 0.0 0.0 0.0
2003 2063 0.0 0.0 0.0
2004 7393 0.0 0.0 0.0
2005 5587 0.0 0.0 0.0
2006 8743 0.0 0.0 0.0
2007 3191 0.0 0.0 0.0

For data sources see[5]

References