X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272101000

Well Details

Well ID: 0484272101000
Loading map...
Location: 00/01-21-048-27W4/0
Location Alias: 00/01-21-48-27 W4M
Location Alias 2: 00/01-21-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 21
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE C.P.R. C-2
Operator Name: Imperial Oil Resources Limited
License Number: 0003753
License Date: 1951-11-09
License Status: Abandoned
Spud Date: 1951-11-28
Final Drill Date: 1952-01-09
Well Total Depth: 2032.00 m
Surface Hole Latitude: 53.150535
Surface Hole Longitude: -113.881581

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-09 Obtained License
1952-01-03 Production Casing Operation Performed
1952-01-09 Finished Drilling
1952-01-09 Well Mode changed to Drilled and Cased
1952-01-10 Perforation Treatment Performed - Open-Hole Completion
1952-01-10 Well Began Production
1952-01-10 Well Fluid changed to Crude Oil
1952-01-10 Well Mode changed to Flowing
1974-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-10 Well Log Performed
1984-05-12 Perforation Treatment Performed - Open-Hole Completion
1984-05-12 Well Log Performed
1984-10-05 Well Log Performed
1984-10-09 Perforation Treatment Performed - Open-Hole Completion
1984-10-16 Liner Casing Operation Performed
1984-10-16 Perforation Treatment Performed - Cement Squeeze
1984-10-19 Well Log Performed
1984-10-20 Perforation Treatment Performed - Jet Perforation
1984-10-20 Well Log Performed
1986-01-08 Well Log Performed
1986-03-04 Perforation Treatment Performed - Jet Perforation
1986-03-08 Perforation Treatment Performed - Acid Wash - No Pressure
1987-06-27 Perforation Treatment Performed - Cement Squeeze
1987-06-30 Perforation Treatment Performed - Jet Perforation
1987-06-30 Well Log Performed
1987-10-07 Perforation Treatment Performed - Cement Squeeze
1987-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-09 Perforation Treatment Performed - Jet Perforation
1987-10-09 Well Log Performed
1987-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-10 Well Log Performed
1989-09-30 Perforation Treatment Performed - Jet Perforation
1989-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-01 Well Log Performed
1989-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-04 Well Log Performed
1993-03-13 Perforation Treatment Performed - Jet Perforation
1993-03-14 Perforation Treatment Performed - Cement Squeeze
1993-03-14 Well Log Performed
1995-07-19 Perforation Treatment Performed - Cement Squeeze
1995-07-22 Perforation Treatment Performed - Cement Squeeze
1995-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-25 Perforation Treatment Performed - Jet Perforation
1997-10-08 Perforation Treatment Performed - Jet Perforation
2004-07-07 Well Log Performed
2004-07-08 Perforation Treatment Performed - Jet Perforation
2004-07-09 Perforation Treatment Performed - Casing Patch (Over Perfs)
2004-07-09 Well Log Performed
2005-07-27 Perforation Treatment Performed - Jet Perforation
2005-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-05-18 Perforation Treatment Performed - Jet Perforation
2006-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-10-24 Perforation Treatment Performed - Jet Perforation
2006-10-24 Well Log Performed
2006-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-07 Perforation Treatment Performed - Jet Perforation
2007-09-07 Well Log Performed
2008-01-07 Well Log Performed
2008-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2013-03-22 Well Log Performed
2013-03-23 Well Log Performed
2013-03-24 Perforation Treatment Performed - Jet Perforation
2013-03-24 Well Log Performed
2013-03-26 Perforation Treatment Performed - Cement Plug
2013-03-26 Perforation Treatment Performed - Remedial Casing
2013-03-26 Plug Back Performed
2013-03-26 Well Fluid changed to Crude Oil
2013-03-26 Well Mode changed to Abandoned Zone
2013-03-27 Perforation Treatment Performed - Jet Perforation
2013-03-27 Well Log Performed
2013-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-04-04 Perforation Treatment Performed - Cement Plug
2013-04-04 Perforation Treatment Performed - Remedial Casing
2013-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-04-06 Perforation Treatment Performed - Cement Plug
2013-04-06 Perforation Treatment Performed - Jet Perforation
2013-04-06 Perforation Treatment Performed - Remedial Casing
2013-04-06 Well Log Performed
2013-06-07 Well Abandoned
2013-06-07 Well Fluid changed to Crude Oil
2013-06-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-10 Open Hole/Barefoot Completion 1811.70 1890.40 0
1987-06-30 Perforation 1990.70 1991.20 13
1987-10-07 Cement Squeeze 1990.70 1991.20 0
1987-10-09 Perforation 1863.00 1863.50 7
1987-10-09 Perforation 1995.10 1995.60 7
1987-10-09 Acid Treatment 1863.00 1863.50 0
1987-10-10 Acid Treatment 1995.10 1995.60 0
1989-09-30 Perforation 1931.30 1931.80 20
1989-09-30 Perforation 1999.50 2000.50 20
1989-09-30 Perforation 2003.50 2004.50 20
1989-10-01 Acid Treatment 1863.00 2004.50 0
1974-08-03 Acid Treatment 1811.70 1993.10 0
1989-10-03 Acid Treatment 1931.30 1931.80 0
1993-03-13 Perforation 2007.50 2008.00 20
1993-03-13 Perforation 2010.50 2011.00 20
1993-03-14 Cement Squeeze 1995.10 1995.60 0
1993-03-14 Cement Squeeze 1999.50 2000.50 0
1995-07-19 Cement Squeeze 1863.00 1863.50 0
1995-07-19 Cement Squeeze 1931.30 1931.80 0
1995-07-22 Cement Squeeze 2003.50 2004.50 0
1995-07-22 Cement Squeeze 2007.50 2008.00 0
1995-07-25 Perforation 1920.00 1920.50 20
1984-05-12 Open Hole/Barefoot Completion 1811.70 2026.00 0
1995-07-25 Acid Treatment 1920.00 1920.50 0
1997-10-08 Perforation 2013.60 2014.10 20
2004-07-08 Perforation 2006.10 2009.10 20
2004-07-09 Casing Patch 1920.00 1920.50 0
2005-07-27 Perforation 1983.80 1989.80 13
2005-07-28 Acid Treatment 1983.80 1989.80 0
2006-05-18 Perforation 1942.80 1948.80 20
2006-05-19 Acid Treatment 1942.80 1948.80 0
2006-10-24 Perforation 1900.00 1906.00 13
2006-10-25 Acid Treatment 1900.00 1906.00 0
1984-10-09 Open Hole/Barefoot Completion 1811.70 2032.00 0
2007-09-07 Perforation 1844.80 1850.80 13
2007-09-07 Perforation 1866.80 1872.80 13
2008-01-08 Acid Treatment 1844.80 1850.80 0
2013-03-24 Perforation 719.50 720.50 17
2013-03-26 Remedial Casing Cementing 719.50 720.50 0
2013-03-26 Cement Plug 584.00 1832.00 0
2013-03-27 Perforation 460.90 461.90 17
2013-03-27 Perforation 399.00 400.00 17
2013-03-27 Perforation 374.00 375.00 17
2013-03-27 Perforation 364.00 365.00 17
1984-10-16 Cement Squeeze 1811.70 2032.00 0
2013-03-27 Perforation 323.50 324.50 17
2013-03-27 Perforation 294.00 295.00 17
2013-03-27 Perforation 260.00 261.00 17
2013-03-27 Perforation 240.00 241.00 17
2013-03-27 Perforation 214.00 215.00 17
2013-03-27 Perforation 204.00 205.00 17
2013-04-04 Remedial Casing Cementing 204.00 461.90 0
2013-04-04 Cement Plug 453.80 562.00 0
2013-04-04 Packing Device Capped w/Cement 197.50 453.10 0
2013-04-06 Perforation 196.10 196.30 17
1984-10-20 Perforation 1982.60 1983.10 13
2013-04-06 Remedial Casing Cementing 196.10 196.30 0
2013-04-06 Cement Plug 185.50 197.00 0
2013-04-06 Packing Device Capped w/Cement 176.00 185.00 0
1986-03-04 Perforation 1986.90 1987.40 13
1986-03-08 Acid Wash 1986.90 1987.40 0
1987-06-27 Cement Squeeze 1982.60 1987.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1967 717 0.0 0.0 0.0
1968 6383 0.0 0.0 0.0
1969 7622 0.0 0.0 0.0
1970 6702 0.0 0.0 0.0
1971 4921 0.0 0.0 0.0
1972 7111 0.0 0.0 0.0
1973 8326 0.0 0.0 0.0
1974 6529 0.0 0.0 0.0
1975 3850 0.0 0.0 0.0
1976 6612 0.0 0.0 0.0
1977 7703 0.0 0.0 0.0
1978 6390 0.0 0.0 0.0
1979 7705 0.0 0.0 0.0
1980 7887 0.0 0.0 0.0
1981 7408 0.0 0.0 0.0
1982 4694 0.0 0.0 0.0
1983 6293 0.0 0.0 0.0
1984 6591 0.0 0.0 0.0
1985 7201 0.0 0.0 0.0
1986 6321 0.0 0.0 0.0
1987 4115 0.0 0.0 0.0
1988 8488 0.0 0.0 0.0
1989 6815 0.0 0.0 0.0
1990 8338 0.0 0.0 0.0
1991 4323 0.0 0.0 0.0
1992 2785 0.0 0.0 0.0
1993 1909 0.0 0.0 0.0
1994 1550 0.0 0.0 0.0
1995 5282 0.0 0.0 0.0
1996 6658 0.0 0.0 0.0
1997 6747 0.0 0.0 0.0
1998 724 0.0 0.0 0.0
1999 2451 0.0 0.0 0.0
2000 2899 0.0 0.0 0.0
2001 4565 0.0 0.0 0.0
2002 4369 0.0 0.0 0.0
2003 5433 0.0 0.0 0.0
2004 8164 0.0 0.0 0.0
2005 7987 0.0 0.0 0.0
2006 8013 0.0 0.0 0.0
2007 8598 0.0 0.0 0.0
2008 6679 0.0 0.0 0.0
2009 5159 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-04-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References