If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485011701002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.137532,"lon":-114.10029,"icon":""}]} |
Location: 00/01-17-048-01W5/2 | |
Location Alias: 00/01-17-48-01 W5M | |
Location Alias 2: 00/01-17-048-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 01 | |
Section: 17 | |
County/Municipality: Leduc County | |
Well Name: SPL PEMBINA 1-17-48-1 | |
Operator Name: Spur Petroleum Ltd. | |
License Number: 0394761 | |
License Date: 2008-02-26 | |
License Status: Issued | |
Spud Date: 2008-03-06 | |
Final Drill Date: 2008-03-16 | |
Well Total Depth: 878.00 m | |
Surface Hole Latitude: 53.137532 | |
Surface Hole Longitude: -114.100290 |
Date | Event |
---|---|
2008-02-26 | Obtained License |
2008-03-06 | Surface Casing Operation Performed |
2008-03-16 | Finished Drilling |
2008-03-16 | Well Mode changed to Drilled and Cased |
2008-03-17 | Production Casing Operation Performed |
2008-03-17 | Rig Released |
2008-03-23 | Well Log Performed |
2008-07-15 | Perforation Treatment Performed - Jet Perforation |
2008-07-15 | Well Log Performed |
2008-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-08-28 | Plug Back Performed |
2008-08-28 | Well Log Performed |
2008-10-17 | Perforation Treatment Performed - Jet Perforation |
2008-10-17 | Well Log Performed |
2008-11-28 | Perforation Treatment Performed - Fractured |
2008-12-17 | Well Began Production |
2008-12-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-12-17 | Well Mode changed to Flowing |
2009-02-21 | Perforation Treatment Performed - Jet Perforation |
2009-02-21 | Well Log Performed |
2009-11-08 | Well Log Performed |
2009-11-15 | Perforation Treatment Performed - Fractured |
2009-12-07 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-07-15 | Perforation | 664.20 | 664.80 | 15 |
2009-02-21 | Perforation | 494.00 | 494.80 | 13 |
2009-02-21 | Perforation | 481.80 | 482.30 | 13 |
2009-02-21 | Perforation | 465.50 | 466.00 | 13 |
2009-02-21 | Perforation | 454.00 | 454.60 | 13 |
2009-02-21 | Perforation | 440.20 | 440.70 | 13 |
2009-02-21 | Perforation | 434.70 | 435.20 | 13 |
2009-02-21 | Perforation | 426.80 | 427.30 | 13 |
2009-02-21 | Perforation | 419.00 | 419.50 | 13 |
2009-02-21 | Perforation | 378.40 | 380.00 | 13 |
2009-02-21 | Perforation | 349.40 | 350.00 | 13 |
2008-08-28 | Packing Device Capped w/Cement | 654.00 | 662.00 | 0 |
2009-02-21 | Perforation | 327.40 | 329.00 | 13 |
2009-02-21 | Perforation | 315.70 | 316.30 | 13 |
2009-02-21 | Perforation | 309.70 | 310.30 | 13 |
2009-02-21 | Perforation | 300.10 | 300.60 | 13 |
2009-02-21 | Perforation | 292.50 | 293.00 | 13 |
2009-02-21 | Perforation | 288.30 | 288.80 | 13 |
2009-11-15 | Fracture | 537.70 | 538.20 | 0 |
2009-11-15 | Fracture | 528.20 | 530.70 | 0 |
2009-11-15 | Fracture | 503.50 | 504.00 | 0 |
2009-11-15 | Fracture | 494.00 | 494.80 | 0 |
2008-10-17 | Perforation | 547.50 | 549.00 | 15 |
2009-11-15 | Fracture | 481.80 | 482.30 | 0 |
2009-11-15 | Fracture | 465.50 | 466.00 | 0 |
2009-11-15 | Fracture | 454.00 | 454.60 | 0 |
2009-11-15 | Fracture | 440.20 | 440.70 | 0 |
2009-11-15 | Fracture | 434.70 | 435.20 | 0 |
2009-11-15 | Fracture | 426.80 | 427.30 | 0 |
2009-11-15 | Fracture | 419.00 | 419.50 | 0 |
2009-11-15 | Fracture | 349.40 | 350.00 | 0 |
2009-11-15 | Fracture | 315.70 | 316.30 | 0 |
2009-11-15 | Fracture | 300.10 | 300.60 | 0 |
2008-11-28 | Fracture | 547.50 | 549.00 | 0 |
2009-11-15 | Fracture | 288.30 | 288.80 | 0 |
2009-02-21 | Perforation | 582.00 | 582.80 | 13 |
2009-02-21 | Perforation | 537.70 | 538.20 | 13 |
2009-02-21 | Perforation | 530.00 | 530.70 | 13 |
2009-02-21 | Perforation | 528.20 | 528.70 | 13 |
2009-02-21 | Perforation | 503.50 | 504.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 305 | 0.0 | 0.0 | 0.0 |
2009 | 6788 | 0.0 | 0.0 | 0.0 |
2010 | 8149 | 0.0 | 0.0 | 0.0 |
2011 | 8200 | 0.0 | 0.0 | 0.0 |
2012 | 7801 | 0.0 | 0.0 | 0.0 |
2013 | 8247 | 0.0 | 0.0 | 0.0 |
2014 | 8156 | 0.0 | 0.0 | 0.0 |
2015 | 8452 | 0.0 | 0.0 | 0.0 |
2016 | 8657 | 0.0 | 0.0 | 0.0 |
2017 | 7502 | 0.0 | 0.0 | 0.0 |
2018 | 5759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]