X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485020816000

Well Details

Well ID: 0485020816000
Loading map...
Location: 00/16-08-048-02W5/0
Location Alias: 00/16-08-48-02 W5M
Location Alias 2: 00/16-08-048-02 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 02
Section: 08
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 16-8-48-2
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0022143
License Date: 1962-02-22
License Status: Suspension
Spud Date: 1962-03-25
Final Drill Date: 1962-05-06
Well Total Depth: 1239.60 m
Surface Hole Latitude: 53.132239
Surface Hole Longitude: -114.248694

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-22 Obtained License
1962-05-03 Drill Stem Test Performed
1962-05-06 Finished Drilling
1962-05-06 Well Mode changed to Drilled and Cased
1962-05-07 Production Casing Operation Performed
1962-05-08 Perforation Treatment Performed - Jet Perforation
1962-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-11 Perforation Treatment Performed - Fractured
1962-06-01 Well Began Production
1962-06-01 Well Fluid changed to Crude Oil
1962-06-01 Well Mode changed to Flowing
1962-06-02 Perforation Treatment Performed - Fractured
1962-08-18 Well Fluid changed to Crude Oil
1962-08-18 Well Mode changed to Pumping
1967-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-08-02 Well Fluid changed to Crude Oil
1967-08-02 Well Mode changed to Abandoned Zone
1967-08-03 Perforation Treatment Performed - Jet Perforation
1991-10-31 Well Log Performed
1991-11-01 Perforation Treatment Performed - Jet Perforation
1991-11-03 Perforation Treatment Performed - Chemical Squeeze
1992-06-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-05-08 Perforation 1220.10 1220.70 13
1992-06-23 Fracture 898.60 916.80 0
1962-05-11 Acid Treatment 1220.10 1220.70 0
1962-05-11 Fracture 1220.10 1220.70 0
1962-06-02 Fracture 1220.10 1220.70 0
1967-08-02 Packing Device Capped w/Cement 947.90 947.90 0
1967-08-03 Perforation 898.60 899.20 13
1991-11-01 Perforation 898.50 901.90 13
1991-11-01 Perforation 907.70 916.80 13
1991-11-03 Chemical Squeeze 898.50 916.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 185 0.0 0.0 0.0

For data sources see[5]

References