X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485022016000

Well Details

Well ID: 0485022016000
Loading map...
Location: 00/16-20-048-02W5/0
Location Alias: 00/16-20-48-02 W5M
Location Alias 2: 00/16-20-048-02 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 02
Section: 20
County/Municipality: Leduc County
Well Name: PENMAX ET AL PEMBINA 16-20-48-2
Operator Name: Enerplus Corporation
License Number: 0164796
License Date: 1994-02-07
License Status: RecCertified
Spud Date: 1994-02-09
Final Drill Date: 1994-02-18
Well Total Depth: 1730.00 m
Surface Hole Latitude: 53.160140
Surface Hole Longitude: -114.250704

For data sources see[1][2]

Well History

Date Event
1994-02-07 Obtained License
1994-02-10 Surface Casing Operation Performed
1994-02-13 Direction Drilling Operation Performed - Deviate
1994-02-18 Finished Drilling
1994-02-18 Well Log Performed
1994-02-18 Well Mode changed to Drilled and Cased
1994-02-19 Well Log Performed
1994-02-20 Drill Stem Test Performed
1994-02-21 Drill Stem Test Performed
1994-02-24 Production Casing Operation Performed
1994-02-24 Rig Released
1994-02-26 Perforation Treatment Performed - Jet Perforation
1994-02-28 Perforation Treatment Performed - Fractured
1994-03-01 Perforation Treatment Performed - Jet Perforation
1994-04-05 Perforation Treatment Performed - Jet Perforation
1994-05-30 Well Began Production
1994-05-30 Well Fluid changed to Crude Oil
1994-05-30 Well Mode changed to Pumping
1994-06-02 Perforation Treatment Performed - Jet Perforation
1994-06-29 Perforation Treatment Performed - Fractured
1994-12-31 Well Fluid changed to Crude Oil
1994-12-31 Well Mode changed to Suspended
1996-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-03 Plug Back Performed
1996-11-07 Well Fluid changed to Crude Oil
1996-11-07 Well Mode changed to Closed
1997-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-04 Plug Back Performed
1997-06-04 Well Log Performed
1997-06-12 Well Abandoned
1997-06-12 Well Fluid changed to Crude Oil
1997-06-12 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-02-13 1240.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-26 Perforation 1683.00 1689.00 13
1997-06-04 Packing Device Capped w/Cement 1077.00 1085.00 0
1994-02-28 Fracture 1683.00 1689.00 0
1994-03-01 Perforation 1622.00 1632.00 14
1994-04-05 Perforation 1123.00 1134.00 13
1994-04-05 Perforation 1105.00 1120.00 13
1994-06-02 Perforation 1129.00 1131.00 18
1994-06-29 Fracture 1105.00 1131.00 0
1996-06-03 Packing Device Capped w/Cement 1642.00 1650.00 0
1997-06-04 Packing Device Capped w/Cement 1572.00 1580.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1054 0.0 0.0 0.0

For data sources see[6]

References