X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030216020

Well Details

Well ID: 0485030216020
Loading map...
Location: 02/16-02-048-03W5/0
Location Alias: 02/16-02-48-03 W5M
Location Alias 2: 02/16-02-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 02
County/Municipality: Leduc County
Well Name: SIFTON HZ 102 PEMBINA 16-2-48-3
Operator Name: Journey Energy Inc.
License Number: 0418648
License Date: 2010-02-17
License Status: Issued
Spud Date: 2010-03-06
Final Drill Date: 2010-03-15
Well Total Depth: 2697.00 m
Surface Hole Latitude: 53.118402
Surface Hole Longitude: -114.345169

For data sources see[1][2]

Well History

Date Event
2010-02-17 Obtained License
2010-03-07 Surface Casing Operation Performed
2010-03-08 Direction Drilling Operation Performed - Horizontal
2010-03-10 Intermediate Casing Operation Performed
2010-03-10 Well Log Performed
2010-03-15 Finished Drilling
2010-03-15 Well Log Performed
2010-03-15 Well Mode changed to Drilled and Cased
2010-03-16 Liner Casing Operation Performed
2010-03-17 Rig Released
2010-03-26 Well Log Performed
2010-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-29 Perforation Treatment Performed - Open-Hole Completion
2010-09-06 Well Began Production
2010-09-06 Well Fluid changed to Crude Oil
2010-09-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-08 690.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-29 Open Hole/Barefoot Completion 2660.00 2697.00 0
2010-03-29 Multi-Stage Fracture 1799.60 1799.70 0
2010-03-29 Multi-Stage Fracture 1698.50 1698.60 0
2010-03-29 Multi-Stage Fracture 1606.80 1606.90 0
2010-03-29 Multi-Stage Fracture 1503.00 1503.10 0
2010-03-29 Multi-Stage Fracture 2655.60 2655.70 0
2010-03-29 Multi-Stage Fracture 2540.40 2540.50 0
2010-03-29 Multi-Stage Fracture 2536.90 2537.00 0
2010-03-29 Multi-Stage Fracture 2333.40 2333.50 0
2010-03-29 Multi-Stage Fracture 2216.10 2216.20 0
2010-03-29 Multi-Stage Fracture 2112.50 2112.60 0
2010-03-29 Multi-Stage Fracture 2005.00 2005.10 0
2010-03-29 Multi-Stage Fracture 1913.30 1913.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2855 0.0 0.0 0.0
2011 8515 0.0 0.0 0.0
2012 8715 0.0 0.0 0.0
2013 8620 0.0 0.0 0.0
2014 8207 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8451 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 8687 0.0 0.0 0.0
2019 8635 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References