X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030508000

Well Details

Well ID: 0485030508000
Loading map...
Location: 00/08-05-048-03W5/0
Location Alias: 00/08-05-48-03 W5M
Location Alias 2: 00/08-05-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 05
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 8-5-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0029640
License Date: 1965-12-17
License Status: Abandoned
Spud Date: 1966-02-04
Final Drill Date: 1966-02-12
Well Total Depth: 975.40 m
Surface Hole Latitude: 53.109888
Surface Hole Longitude: -114.395989

For data sources see[1][2]

Well History

Date Event
1965-12-17 Obtained License
1966-02-12 Finished Drilling
1966-02-12 Production Casing Operation Performed
1966-02-12 Well Mode changed to Drilled and Cased
1966-02-25 Perforation Treatment Performed - Jet Perforation
1966-02-26 Perforation Treatment Performed - Fractured
1966-04-21 Well Began Production
1966-04-21 Well Fluid changed to Crude Oil
1966-04-21 Well Mode changed to Pumping
2002-04-14 Well Fluid changed to Crude Oil
2002-04-14 Well Mode changed to Suspended
2003-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-01 Plug Back Performed
2003-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-02 Perforation Treatment Performed - Jet Perforation
2003-11-02 Perforation Treatment Performed - Remedial Casing
2003-11-02 Plug Back Performed
2003-11-02 Well Fluid changed to Crude Oil
2003-11-02 Well Log Performed
2003-11-02 Well Mode changed to Abandoned Zone
2003-11-06 Well Abandoned
2003-11-06 Well Fluid changed to Crude Oil
2003-11-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-02-25 Perforation 965.00 965.30 0
2003-11-02 Perforation 408.00 409.00 14
2003-11-02 Remedial Casing Cementing 408.00 409.00 0
2003-11-02 Packing Device Capped w/Cement 357.10 404.10 0
2003-11-02 Perforation 256.00 257.00 14
2003-11-02 Remedial Casing Cementing 256.00 257.00 0
2003-11-02 Packing Device Capped w/Cement 158.00 251.00 0
1966-02-25 Perforation 962.30 964.70 0
1966-02-25 Perforation 961.30 961.60 0
1966-02-25 Perforation 961.00 961.00 0
1966-02-26 Fracture 961.00 965.30 0
2003-11-01 Packing Device Capped w/Cement 942.60 952.00 0
2003-11-02 Perforation 597.00 598.00 14
2003-11-02 Remedial Casing Cementing 597.00 598.00 0
2003-11-02 Packing Device Capped w/Cement 498.00 592.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 6816 0.0 0.0 0.0
1968 5993 0.0 0.0 0.0
1969 4308 0.0 0.0 0.0
1970 5640 0.0 0.0 0.0
1971 8107 0.0 0.0 0.0
1972 7668 0.0 0.0 0.0
1973 8591 0.0 0.0 0.0
1974 7656 0.0 0.0 0.0
1975 8447 0.0 0.0 0.0
1976 8735 0.0 0.0 0.0
1977 8735 0.0 0.0 0.0
1978 8231 0.0 0.0 0.0
1979 8207 0.0 0.0 0.0
1980 8447 0.0 0.0 0.0
1981 7487 0.0 0.0 0.0
1982 8723 0.0 0.0 0.0
1983 8411 0.0 0.0 0.0
1984 8434 0.0 0.0 0.0
1985 8471 0.0 0.0 0.0
1986 7731 0.0 0.0 0.0
1987 8587 0.0 0.0 0.0
1988 8046 0.0 0.0 0.0
1989 8248 0.0 0.0 0.0
1990 7151 0.0 0.0 0.0
1991 7780 0.0 0.0 0.0
1992 8062 0.0 0.0 0.0
1993 7893 0.0 0.0 0.0
1994 7487 0.0 0.0 0.0
1995 7847 0.0 0.0 0.0
1996 8775 0.0 0.0 0.0
1997 8154 0.0 0.0 0.0
1998 7528 0.0 0.0 0.0
1999 8543 0.0 0.0 0.0
2000 8241 0.0 0.0 0.0
2001 8661 0.0 0.0 0.0
2002 2471 0.0 0.0 0.0

For data sources see[5]

References