If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485030801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.125613,"lon":-114.417835,"icon":""}]} |
| Location: 00/01-08-048-03W5/0 | |
| Location Alias: 00/01-08-48-03 W5M | |
| Location Alias 2: 00/01-08-048-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 08 | |
| County/Municipality: Brazeau County | |
| Well Name: SDEL HZ PEMBINA 1-8-48-3 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0443960 | |
| License Date: 2012-02-09 | |
| License Status: Amended | |
| Spud Date: 2012-02-19 | |
| Final Drill Date: 2012-02-27 | |
| Well Total Depth: 3150.00 m | |
| Surface Hole Latitude: 53.125613 | |
| Surface Hole Longitude: -114.417835 |
| Date | Event |
|---|---|
| 2012-02-09 | Obtained License |
| 2012-02-19 | Well Log Performed |
| 2012-02-20 | Surface Casing Operation Performed |
| 2012-02-21 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-23 | Well Log Performed |
| 2012-02-27 | Finished Drilling |
| 2012-02-27 | Well Log Performed |
| 2012-02-27 | Well Mode changed to Drilled and Cased |
| 2012-02-29 | Production Casing Operation Performed |
| 2012-02-29 | Rig Released |
| 2012-03-16 | Well Log Performed |
| 2012-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-24 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-03-27 | Well Began Production |
| 2012-03-27 | Well Fluid changed to Crude Oil |
| 2012-03-27 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-19 | Nabors Drilling Limited | 3 | N/A | Drill To LD |
| 2012-02-19 | Nabors Drilling Limited | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-21 | 705.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-03-24 | Open Hole/Barefoot Completion | 3145.00 | 3150.00 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2502.40 | 2502.50 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2428.30 | 2428.40 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2354.50 | 2354.60 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2280.80 | 2280.90 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2195.90 | 2196.00 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2122.00 | 2122.10 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2047.90 | 2048.00 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 1973.90 | 1974.00 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 1899.80 | 1899.90 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 1825.50 | 1825.60 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 3122.00 | 3122.10 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 3018.20 | 3018.30 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2956.20 | 2956.30 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2883.00 | 2883.10 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2809.70 | 2809.80 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2736.10 | 2736.20 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2650.90 | 2651.00 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2576.80 | 2576.90 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6460 | 0.0 | 0.0 | 0.0 |
| 2013 | 8295 | 0.0 | 0.0 | 0.0 |
| 2014 | 8451 | 0.0 | 0.0 | 0.0 |
| 2015 | 8729 | 0.0 | 0.0 | 0.0 |
| 2016 | 8587 | 0.0 | 0.0 | 0.0 |
| 2017 | 8507 | 0.0 | 0.0 | 0.0 |
| 2018 | 8119 | 0.0 | 0.0 | 0.0 |
| 2019 | 8638 | 0.0 | 0.0 | 0.0 |
| 2020 | 1080 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-03-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]