X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031007022

Well Details

Well ID: 0485031007022
Loading map...
Location: 02/07-10-048-03W5/2
Location Alias: 02/07-10-48-03 W5M
Location Alias 2: 02/07-10-048-03 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 10
County/Municipality: Leduc County
Well Name: BIRCHILL ET AL PEMBINA 7-10A-48-3
Operator Name: TAQA North Ltd.
License Number: 0012252
License Date: 1956-09-12
License Status: RecCertified
Spud Date: 1956-09-04
Final Drill Date: 1956-10-01
Well Total Depth: 1780.00 m
Surface Hole Latitude: 53.125004
Surface Hole Longitude: -114.352034

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-09-11 Drill Stem Test Performed
1956-09-12 Obtained License
1956-09-16 Drill Stem Test Performed
1956-09-21 Drill Stem Test Performed
1956-09-28 Drill Stem Test Performed
1956-09-29 Drill Stem Test Performed
1956-10-01 Drill Stem Test Performed
1956-10-01 Finished Drilling
1956-10-01 Well Mode changed to Drilled and Cased
1956-10-02 Production Casing Operation Performed
1956-10-04 Perforation Treatment Performed - Bullet Perforation
1956-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-06 Perforation Treatment Performed - Bullet Perforation
1956-10-08 Perforation Treatment Performed - Bullet Perforation
1956-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-10 Perforation Treatment Performed - Cement Plug
1956-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-11 Perforation Treatment Performed - Bullet Perforation
1956-10-11 Perforation Treatment Performed - Cement Squeeze
1956-10-11 Perforation Treatment Performed - Fractured
1956-10-11 Perforation Treatment Performed - Jet Perforation
1956-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-11-23 Perforation Treatment Performed - Acid Wash - No Pressure
1956-11-23 Perforation Treatment Performed - Bullet Perforation
1957-01-07 Perforation Treatment Performed - Cement Squeeze
1957-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-10 Perforation Treatment Performed - Bullet Perforation
1976-10-27 Perforation Treatment Performed - Cement Squeeze
1976-11-03 Perforation Treatment Performed - Cement Squeeze
1976-11-09 Perforation Treatment Performed - Cement Squeeze
1976-11-12 Perforation Treatment Performed - Jet Perforation
1976-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-01 Well Began Production
1977-02-01 Well Fluid changed to Gas
1977-02-01 Well Mode changed to Flowing
1978-06-14 Perforation Treatment Performed - Cement Squeeze
1978-06-16 Perforation Treatment Performed - Jet Perforation
1979-02-21 Perforation Treatment Performed - Jet Perforation
1989-03-01 Well Fluid changed to Gas
1989-03-01 Well Mode changed to Suspended
1999-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-25 Perforation Treatment Performed - Jet Perforation
1999-01-25 Plug Back Performed
1999-01-25 Well Fluid changed to Gas
1999-01-25 Well Log Performed
1999-01-25 Well Mode changed to Abandoned Zone
1999-01-26 Perforation Treatment Performed - Remedial Casing
1999-05-31 Well Abandoned
1999-05-31 Well Fluid changed to Gas
1999-05-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-10-04 Bullet Perforation 1748.60 1750.20 20
1956-10-10 Cement Plug 1709.90 1762.70 0
1956-10-11 Bullet Perforation 1272.20 1278.30 20
1956-10-11 Acid Treatment 1272.20 1278.30 0
1956-10-11 Fracture 1272.20 1278.30 0
1956-10-11 Cement Squeeze 1272.20 1278.30 0
1956-10-11 Perforation 1266.40 1272.20 13
1956-10-11 Acid Treatment 1266.40 1272.20 0
1956-10-11 Fracture 1266.40 1272.20 0
1956-11-22 Packing Device Capped w/Cement 1127.80 1127.80 0
1956-11-23 Bullet Perforation 965.60 968.00 20
1956-10-04 Bullet Perforation 1752.00 1753.50 20
1956-11-23 Acid Wash 965.60 968.00 0
1957-01-07 Cement Squeeze 965.60 968.00 0
1957-01-10 Bullet Perforation 967.10 968.30 13
1957-01-10 Acid Treatment 967.10 968.30 0
1976-10-27 Cement Squeeze 967.10 968.30 0
1976-11-03 Cement Squeeze 1266.40 1278.30 0
1976-11-09 Cement Squeeze 967.10 968.30 0
1976-11-12 Perforation 1514.60 1515.50 3
1976-11-15 Acid Treatment 1514.60 1515.50 0
1978-06-14 Cement Squeeze 1514.60 1515.50 0
1956-10-04 Bullet Perforation 1755.00 1756.90 20
1978-06-16 Perforation 1513.90 1515.20 13
1979-02-21 Perforation 1514.20 1515.50 13
1999-01-25 Packing Device Capped w/Cement 1502.00 1510.00 0
1999-01-25 Perforation 332.00 332.50 13
1999-01-26 Remedial Casing Cementing 332.00 332.50 0
1956-10-05 Acid Treatment 1748.60 1756.90 0
1956-10-06 Acid Treatment 1748.60 1756.90 0
1956-10-06 Bullet Perforation 1756.90 1758.40 20
1956-10-06 Acid Treatment 1756.90 1758.40 0
1956-10-08 Bullet Perforation 1758.40 1759.60 20
1956-10-09 Acid Treatment 1758.40 1759.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 7415 0.0 0.0 0.0
1978 8447 0.0 0.0 0.0
1979 8554 0.0 0.0 0.0
1980 8207 0.0 0.0 0.0
1981 8519 0.0 0.0 0.0
1982 8614 0.0 0.0 0.0
1983 8088 0.0 0.0 0.0
1984 8074 0.0 0.0 0.0
1985 8595 0.0 0.0 0.0
1986 7672 0.0 0.0 0.0
1987 8348 0.0 0.0 0.0
1988 8231 0.0 0.0 0.0
1989 737 0.0 0.0 0.0

For data sources see[5]

References