X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031708000

Well Details

Well ID: 0485031708000
Loading map...
Location: 00/08-17-048-03W5/0
Location Alias: 00/08-17-48-03 W5M
Location Alias 2: 00/08-17-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 17
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 8-17-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0018223
License Date: 1959-12-01
License Status: RecCertified
Spud Date: 1959-12-26
Final Drill Date: 1960-01-04
Well Total Depth: 1268.00 m
Surface Hole Latitude: 53.139383
Surface Hole Longitude: -114.395144

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-01 Obtained License
1959-12-31 Drill Stem Test Performed
1960-01-04 Drill Stem Test Performed
1960-01-04 Finished Drilling
1960-01-04 Well Mode changed to Drilled and Cased
1960-01-05 Production Casing Operation Performed
1960-01-14 Perforation Treatment Performed - Jet Perforation
1960-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-15 Perforation Treatment Performed - Fractured
1960-01-17 Well Began Production
1960-01-17 Well Fluid changed to Crude Oil
1960-01-17 Well Mode changed to Flowing
1966-08-10 Well Fluid changed to Crude Oil
1966-08-10 Well Mode changed to Pumping
1989-07-01 Well Fluid changed to Crude Oil
1989-07-01 Well Mode changed to Suspended
2000-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-10 Perforation Treatment Performed - Jet Perforation
2000-10-10 Plug Back Performed
2000-10-10 Well Log Performed
2000-10-19 Perforation Treatment Performed - Cement Plug
2000-10-19 Perforation Treatment Performed - Remedial Casing
2000-10-25 Well Abandoned
2000-10-25 Well Fluid changed to Crude Oil
2000-10-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-14 Perforation 1239.00 1240.20 13
1960-01-15 Acid Treatment 1239.00 1240.20 0
1960-01-15 Fracture 1239.00 1240.20 0
2000-10-10 Packing Device Capped w/Cement 1222.00 1230.00 0
2000-10-10 Perforation 233.00 234.00 14
2000-10-19 Remedial Casing Cementing 233.00 234.00 0
2000-10-19 Cement Plug 13.30 234.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1434 0.0 0.0 0.0
1968 1596 0.0 0.0 0.0
1969 1440 0.0 0.0 0.0
1970 7120 0.0 0.0 0.0
1971 8430 0.0 0.0 0.0
1972 5632 0.0 0.0 0.0
1973 8755 0.0 0.0 0.0
1974 8666 0.0 0.0 0.0
1975 8502 0.0 0.0 0.0
1976 8559 0.0 0.0 0.0
1977 8049 0.0 0.0 0.0
1978 8684 0.0 0.0 0.0
1979 8502 0.0 0.0 0.0
1980 8664 0.0 0.0 0.0
1981 8537 0.0 0.0 0.0
1982 8059 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 8639 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8345 0.0 0.0 0.0
1987 8615 0.0 0.0 0.0
1988 8195 0.0 0.0 0.0
1989 3935 0.0 0.0 0.0

For data sources see[5]

References