If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485041205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.1242,"lon":-114.4374,"icon":""}]} |
Location: 00/05-12-048-04W5/0 | |
Location Alias: 00/05-12-48-04 W5M | |
Location Alias 2: 00/05-12-048-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 04 | |
Section: 12 | |
County/Municipality: Brazeau County | |
Well Name: SDEL ET AL HZ PEMBINA 5-12-48-4 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0446323 | |
License Date: 2012-06-06 | |
License Status: Suspension | |
Spud Date: 2012-06-26 | |
Final Drill Date: 2012-07-04 | |
Well Total Depth: 2965.00 m | |
Surface Hole Latitude: 53.124200 | |
Surface Hole Longitude: -114.437400 |
Date | Event |
---|---|
2012-06-06 | Obtained License |
2012-06-28 | Surface Casing Operation Performed |
2012-06-28 | Well Log Performed |
2012-06-29 | Direction Drilling Operation Performed - Deviate |
2012-06-30 | Direction Drilling Operation Performed - Horizontal |
2012-07-01 | Well Log Performed |
2012-07-04 | Finished Drilling |
2012-07-04 | Well Log Performed |
2012-07-04 | Well Mode changed to Drilled and Cased |
2012-07-07 | Production Casing Operation Performed |
2012-07-07 | Rig Released |
2012-08-16 | Well Log Performed |
2012-08-20 | Well Began Production |
2012-08-20 | Well Fluid changed to Crude Oil |
2012-08-20 | Well Mode changed to Pumping |
2012-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-22 | Perforation Treatment Performed - Open-Hole Completion |
2016-02-01 | Well Fluid changed to Crude Oil |
2016-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-29 | 1052.00 | Deviate (5 - 79 degrees) |
2012-06-30 | 1485.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-22 | Open Hole/Barefoot Completion | 2962.50 | 2965.00 | 0 |
2012-08-22 | Multi-Stage Fracture | 2413.30 | 2413.40 | 0 |
2012-08-22 | Multi-Stage Fracture | 2338.90 | 2339.00 | 0 |
2012-08-22 | Multi-Stage Fracture | 2275.40 | 2275.50 | 0 |
2012-08-22 | Multi-Stage Fracture | 2211.70 | 2211.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 2147.70 | 2147.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 2072.70 | 2072.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 2009.00 | 2009.10 | 0 |
2012-08-22 | Multi-Stage Fracture | 1945.70 | 1945.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 1882.10 | 1882.20 | 0 |
2012-08-22 | Multi-Stage Fracture | 1818.10 | 1818.20 | 0 |
2012-08-22 | Multi-Stage Fracture | 2940.20 | 2940.30 | 0 |
2012-08-22 | Multi-Stage Fracture | 1742.60 | 1742.70 | 0 |
2012-08-22 | Multi-Stage Fracture | 2869.70 | 2869.80 | 0 |
2012-08-22 | Multi-Stage Fracture | 2806.30 | 2806.40 | 0 |
2012-08-22 | Multi-Stage Fracture | 2731.10 | 2731.20 | 0 |
2012-08-22 | Multi-Stage Fracture | 2667.60 | 2667.70 | 0 |
2012-08-22 | Multi-Stage Fracture | 2603.60 | 2603.70 | 0 |
2012-08-22 | Multi-Stage Fracture | 2540.10 | 2540.20 | 0 |
2012-08-22 | Multi-Stage Fracture | 2476.80 | 2476.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2994 | 0.0 | 0.0 | 0.0 |
2013 | 8520 | 0.0 | 0.0 | 0.0 |
2014 | 7745 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-07 | No Incident Encountered | 0.00 | 0.00 |
2012-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]