X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485051908020

Well Details

Well ID: 0485051908020
Loading map...
Location: 02/08-19-048-05W5/0
Location Alias: 02/08-19-48-05 W5M
Location Alias 2: 02/08-19-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 19
County/Municipality: Brazeau County
Well Name: SDEL 102 HZ PEMBINA 8-19-48-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0454638
License Date: 2013-02-06
License Status: Suspension
Spud Date: 2013-02-11
Final Drill Date: 2013-02-16
Well Total Depth: 3047.00 m
Surface Hole Latitude: 53.157737
Surface Hole Longitude: -114.734156

For data sources see[1][2]

Well History

Date Event
2013-02-06 Obtained License
2013-02-12 Surface Casing Operation Performed
2013-02-13 Direction Drilling Operation Performed - Deviate
2013-02-14 Direction Drilling Operation Performed - Horizontal
2013-02-14 Well Log Performed
2013-02-15 Well Log Performed
2013-02-16 Finished Drilling
2013-02-16 Well Log Performed
2013-02-16 Well Mode changed to Drilled and Cased
2013-02-17 Well Log Performed
2013-02-18 Production Casing Operation Performed
2013-02-18 Rig Released
2013-02-27 Well Log Performed
2013-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-04 Perforation Treatment Performed - Open-Hole Completion
2013-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-06 Well Began Production
2013-03-06 Well Fluid changed to Crude Oil
2013-03-06 Well Mode changed to Flowing
2016-06-24 Well Fluid changed to Crude Oil
2016-06-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-11 Nabors Drilling Limited 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-13 415.00 Deviate (5 - 79 degrees)
2013-02-14 1667.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-04 Open Hole/Barefoot Completion 3044.00 3047.00 0
2013-03-04 Multi-Stage Fracture 2582.90 2583.00 0
2013-03-04 Multi-Stage Fracture 2521.70 2521.80 0
2013-03-05 Multi-Stage Fracture 2471.80 2471.90 0
2013-03-05 Multi-Stage Fracture 2410.80 2410.90 0
2013-03-05 Multi-Stage Fracture 2361.40 2361.50 0
2013-03-05 Multi-Stage Fracture 2301.00 2301.10 0
2013-03-05 Multi-Stage Fracture 2251.70 2251.80 0
2013-03-05 Multi-Stage Fracture 2191.10 2191.20 0
2013-03-05 Multi-Stage Fracture 2141.70 2141.80 0
2013-03-05 Multi-Stage Fracture 2080.40 2080.50 0
2013-03-04 Multi-Stage Fracture 3021.90 3022.00 0
2013-03-05 Multi-Stage Fracture 2030.50 2030.60 0
2013-03-05 Multi-Stage Fracture 1980.20 1980.30 0
2013-03-05 Multi-Stage Fracture 1919.60 1919.70 0
2013-03-05 Multi-Stage Fracture 1869.00 1869.10 0
2013-03-05 Multi-Stage Fracture 1808.20 1808.30 0
2013-03-05 Multi-Stage Fracture 1758.70 1758.80 0
2013-03-05 Multi-Stage Fracture 1697.40 1697.50 0
2013-03-04 Multi-Stage Fracture 2965.50 2965.60 0
2013-03-04 Multi-Stage Fracture 2904.90 2905.00 0
2013-03-04 Multi-Stage Fracture 2855.50 2855.60 0
2013-03-04 Multi-Stage Fracture 2794.30 2794.40 0
2013-03-04 Multi-Stage Fracture 2744.30 2744.40 0
2013-03-04 Multi-Stage Fracture 2694.20 2694.30 0
2013-03-04 Multi-Stage Fracture 2632.50 2632.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-04 2013-03-05 1,380 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 86.7759 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 3.5861 N/A
Crystalline silica. quartz 14808-60-7 100 3.5861 N/A
Iron Oxide 1309-37-1 100 3.5861 N/A
Titanium Oxide 13463-67-7 100 3.5862 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 9.2713 N/A
Crystalline silica. quartz 14808-60-7 100 9.2713 N/A
Iron Oxide 1309-37-1 100 9.2713 N/A
Titanium Oxide 13463-67-7 100 9.2708 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0166 N/A
Water 7732-18-5 100 0.0166 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1913 N/A
Water 7732-18-5 100 0.1913 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0744 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0744 N/A
Water 7732-18-5 100 0.0744 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.084 N/A
Water 7732-18-5 100 0.084 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-24 2013-03-01 Surface Water - River 2991

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6939 0.0 0.0 0.0
2014 8384 0.0 0.0 0.0
2015 2875 0.0 0.0 0.0
2016 4253 0.0 0.0 0.0
2017 4391 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-18 No Incident Encountered 0.00 0.00
2013-03-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References