If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485051908020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.157737,"lon":-114.734156,"icon":""}]} |
| Location: 02/08-19-048-05W5/0 | |
| Location Alias: 02/08-19-48-05 W5M | |
| Location Alias 2: 02/08-19-048-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 19 | |
| County/Municipality: Brazeau County | |
| Well Name: SDEL 102 HZ PEMBINA 8-19-48-5 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0454638 | |
| License Date: 2013-02-06 | |
| License Status: Suspension | |
| Spud Date: 2013-02-11 | |
| Final Drill Date: 2013-02-16 | |
| Well Total Depth: 3047.00 m | |
| Surface Hole Latitude: 53.157737 | |
| Surface Hole Longitude: -114.734156 |
| Date | Event |
|---|---|
| 2013-02-06 | Obtained License |
| 2013-02-12 | Surface Casing Operation Performed |
| 2013-02-13 | Direction Drilling Operation Performed - Deviate |
| 2013-02-14 | Direction Drilling Operation Performed - Horizontal |
| 2013-02-14 | Well Log Performed |
| 2013-02-15 | Well Log Performed |
| 2013-02-16 | Finished Drilling |
| 2013-02-16 | Well Log Performed |
| 2013-02-16 | Well Mode changed to Drilled and Cased |
| 2013-02-17 | Well Log Performed |
| 2013-02-18 | Production Casing Operation Performed |
| 2013-02-18 | Rig Released |
| 2013-02-27 | Well Log Performed |
| 2013-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-03-04 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-03-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-03-06 | Well Began Production |
| 2013-03-06 | Well Fluid changed to Crude Oil |
| 2013-03-06 | Well Mode changed to Flowing |
| 2016-06-24 | Well Fluid changed to Crude Oil |
| 2016-06-24 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-02-11 | Nabors Drilling Limited | 26 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-02-13 | 415.00 | Deviate (5 - 79 degrees) |
| 2013-02-14 | 1667.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-03-04 | Open Hole/Barefoot Completion | 3044.00 | 3047.00 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2582.90 | 2583.00 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2521.70 | 2521.80 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2471.80 | 2471.90 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2410.80 | 2410.90 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2361.40 | 2361.50 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2301.00 | 2301.10 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2251.70 | 2251.80 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2191.10 | 2191.20 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2141.70 | 2141.80 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2080.40 | 2080.50 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 3021.90 | 3022.00 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 2030.50 | 2030.60 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 1980.20 | 1980.30 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 1919.60 | 1919.70 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 1869.00 | 1869.10 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 1808.20 | 1808.30 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 1758.70 | 1758.80 | 0 |
| 2013-03-05 | Multi-Stage Fracture | 1697.40 | 1697.50 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2965.50 | 2965.60 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2904.90 | 2905.00 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2855.50 | 2855.60 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2794.30 | 2794.40 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2744.30 | 2744.40 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2694.20 | 2694.30 | 0 |
| 2013-03-04 | Multi-Stage Fracture | 2632.50 | 2632.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-03-04 | 2013-03-05 | 1,380 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | No specific ingredients | Not Available | 100 | 86.7759 | N/A | |||
| Sand (20/40) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 3.5861 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 3.5861 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 3.5861 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 3.5862 | N/A | ||||
| Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 9.2713 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 9.2713 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 9.2713 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 9.2708 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0166 | N/A | |
| Water | 7732-18-5 | 100 | 0.0166 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1913 | N/A | |
| Water | 7732-18-5 | 100 | 0.1913 | N/A | ||||
| CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0744 | N/A | |
| Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0744 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0744 | N/A | ||||
| CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.084 | N/A | |
| Water | 7732-18-5 | 100 | 0.084 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-02-24 | 2013-03-01 | Surface Water - River | 2991 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 6939 | 0.0 | 0.0 | 0.0 |
| 2014 | 8384 | 0.0 | 0.0 | 0.0 |
| 2015 | 2875 | 0.0 | 0.0 | 0.0 |
| 2016 | 4253 | 0.0 | 0.0 | 0.0 |
| 2017 | 4391 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-02-18 | No Incident Encountered | 0.00 | 0.00 |
| 2013-03-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]