X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062102020

Well Details

Well ID: 0485062102020
Loading map...
Location: 02/02-21-048-06W5/0
Location Alias: 02/02-21-48-06 W5M
Location Alias 2: 02/02-21-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 21
County/Municipality: Brazeau County
Well Name: ARC HZ PEMBINA 2-21-48-6
Operator Name: ARC Resources Ltd.
License Number: 0436380
License Date: 2011-08-29
License Status: Amended
Spud Date: 2011-09-06
Final Drill Date: 2011-09-16
Well Total Depth: 3559.00 m
Surface Hole Latitude: 53.154280
Surface Hole Longitude: -114.784133

For data sources see[1][2]

Well History

Date Event
2011-08-29 Obtained License
2011-09-07 Surface Casing Operation Performed
2011-09-09 Direction Drilling Operation Performed - Horizontal
2011-09-11 Intermediate Casing Operation Performed
2011-09-16 Finished Drilling
2011-09-16 Well Log Performed
2011-09-16 Well Mode changed to Drilled and Cased
2011-09-18 Liner Casing Operation Performed
2011-09-20 Rig Released
2011-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-20 Perforation Treatment Performed - Open-Hole Completion
2011-12-07 Well Began Production
2011-12-07 Well Fluid changed to Crude Oil
2011-12-07 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-09 1028.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-20 Multi-Stage Fracture 1654.00 1757.00 0
2011-10-20 Multi-Stage Fracture 2644.00 2749.00 0
2011-10-20 Multi-Stage Fracture 2752.00 2857.00 0
2011-10-20 Multi-Stage Fracture 2860.00 2974.00 0
2011-10-20 Multi-Stage Fracture 2978.00 3081.50 0
2011-10-20 Multi-Stage Fracture 3085.00 3188.50 0
2011-10-20 Multi-Stage Fracture 3192.00 3294.50 0
2011-10-20 Multi-Stage Fracture 3298.00 3413.00 0
2011-10-20 Multi-Stage Fracture 3417.00 3520.00 0
2011-10-20 Open Hole/Barefoot Completion 1654.00 3520.00 0
2011-10-20 Multi-Stage Fracture 1761.00 1864.00 0
2011-10-20 Multi-Stage Fracture 1867.00 1981.50 0
2011-10-20 Multi-Stage Fracture 1985.00 2090.00 0
2011-10-20 Multi-Stage Fracture 2093.00 2199.00 0
2011-10-20 Multi-Stage Fracture 2202.00 2308.00 0
2011-10-20 Multi-Stage Fracture 2311.00 2416.00 0
2011-10-20 Multi-Stage Fracture 2420.00 2523.00 0
2011-10-20 Multi-Stage Fracture 2527.00 2641.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 606 0.0 0.0 0.0
2012 8558 0.0 0.0 0.0
2013 7978 0.0 0.0 0.0
2014 8484 0.0 0.0 0.0
2015 8522 0.0 0.0 0.0
2016 7707 0.0 0.0 0.0
2017 8148 0.0 0.0 0.0
2018 8132 0.0 0.0 0.0
2019 8756 0.0 0.0 0.0
2020 2099 0.0 0.0 0.0

For data sources see[6]

References