X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485063102000

Well Details

Well ID: 0485063102000
Loading map...
Location: 00/02-31-048-06W5/0
Location Alias: 00/02-31-48-06 W5M
Location Alias 2: 00/02-31-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 31
County/Municipality: Brazeau County
Well Name: IMP CDN-SUP PEMBINA 2-31-48-6
Operator Name: ARC Resources Ltd.
License Number: 0071251
License Date: 1978-08-09
License Status: Abandoned
Spud Date: 1978-10-05
Final Drill Date: 1978-10-11
Well Total Depth: 1117.00 m
Surface Hole Latitude: 53.179680
Surface Hole Longitude: -114.864085

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-09 Obtained License
1978-10-11 Finished Drilling
1978-10-11 Well Mode changed to Drilled and Cased
1978-10-13 Production Casing Operation Performed
1978-11-22 Perforation Treatment Performed - Jet Perforation
1978-11-23 Perforation Treatment Performed - Fractured
1978-12-20 Well Began Production
1978-12-20 Well Fluid changed to Crude Oil
1978-12-20 Well Mode changed to Pumping
1998-11-02 Well Fluid changed to Crude Oil
1998-11-02 Well Mode changed to Suspended
2000-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-30 Perforation Treatment Performed - Jet Perforation
2000-03-30 Plug Back Performed
2000-03-30 Well Fluid changed to Crude Oil
2000-03-30 Well Log Performed
2000-03-30 Well Mode changed to Abandoned Zone
2000-10-19 Perforation Treatment Performed - Remedial Casing
2000-11-03 Well Abandoned
2000-11-03 Well Fluid changed to Crude Oil
2000-11-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-22 Perforation 1087.00 1090.00 7
1978-11-22 Perforation 1090.50 1098.00 7
1978-11-23 Fracture 1087.00 1098.00 0
2000-03-30 Packing Device Capped w/Cement 1070.00 1078.00 0
2000-03-30 Perforation 340.00 341.00 14
2000-10-19 Remedial Casing Cementing 340.00 341.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 264 0.0 0.0 0.0
1979 7654 0.0 0.0 0.0
1980 8322 0.0 0.0 0.0
1981 7667 0.0 0.0 0.0
1982 7974 0.0 0.0 0.0
1983 8422 0.0 0.0 0.0
1984 8249 0.0 0.0 0.0
1985 7432 0.0 0.0 0.0
1986 7874 0.0 0.0 0.0
1987 3316 0.0 0.0 0.0
1988 6468 0.0 0.0 0.0
1989 7754 0.0 0.0 0.0
1990 8261 0.0 0.0 0.0
1991 7834 0.0 0.0 0.0
1992 8413 0.0 0.0 0.0
1993 8736 0.0 0.0 0.0
1994 7943 0.0 0.0 0.0
1995 7536 0.0 0.0 0.0
1996 3998 0.0 0.0 0.0
1997 3900 0.0 0.0 0.0
1998 288 0.0 0.0 0.0

For data sources see[5]

References