If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485092614020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.16454,"lon":-115.206648,"icon":""}]} |
Location: 02/14-26-048-09W5/0 | |
Location Alias: 02/14-26-48-09 W5M | |
Location Alias 2: 02/14-26-048-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 09 | |
Section: 26 | |
County/Municipality: Brazeau County | |
Well Name: DAYLIGHT HZ PEMBINA 14-26-48-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0435348 | |
License Date: 2011-07-21 | |
License Status: Issued | |
Spud Date: 2011-08-24 | |
Final Drill Date: 2011-09-14 | |
Well Total Depth: 3175.00 m | |
Surface Hole Latitude: 53.164540 | |
Surface Hole Longitude: -115.206648 |
Date | Event |
---|---|
2001-08-27 | Surface Casing Operation Performed |
2011-07-21 | Obtained License |
2011-08-23 | Well Log Performed |
2011-08-31 | Direction Drilling Operation Performed - Horizontal |
2011-09-03 | Intermediate Casing Operation Performed |
2011-09-14 | Finished Drilling |
2011-09-14 | Well Log Performed |
2011-09-14 | Well Mode changed to Drilled and Cased |
2011-09-16 | Liner Casing Operation Performed |
2011-09-17 | Rig Released |
2011-09-22 | Well Log Performed |
2011-09-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-28 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-07 | Well Began Production |
2011-10-07 | Well Fluid changed to Crude Oil |
2011-10-07 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-31 | 1859.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-28 | Open Hole/Barefoot Completion | 3170.00 | 3175.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 2359.20 | 2359.30 | 0 |
2011-09-28 | Multi-Stage Fracture | 2273.60 | 2273.70 | 0 |
2011-09-28 | Multi-Stage Fracture | 3148.30 | 3148.40 | 0 |
2011-09-28 | Multi-Stage Fracture | 3050.00 | 3050.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 2949.00 | 2949.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 2860.60 | 2860.70 | 0 |
2011-09-28 | Multi-Stage Fracture | 2758.90 | 2759.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 2650.00 | 2650.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 2552.60 | 2552.70 | 0 |
2011-09-28 | Multi-Stage Fracture | 2455.80 | 2455.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1104 | 0.0 | 0.0 | 0.0 |
2012 | 8348 | 0.0 | 0.0 | 0.0 |
2013 | 8228 | 0.0 | 0.0 | 0.0 |
2014 | 8277 | 0.0 | 0.0 | 0.0 |
2015 | 3978 | 0.0 | 0.0 | 0.0 |
2016 | 3209 | 0.0 | 0.0 | 0.0 |
2017 | 6908 | 0.0 | 0.0 | 0.0 |
2018 | 4136 | 0.0 | 0.0 | 0.0 |
2019 | 8642 | 0.0 | 0.0 | 0.0 |
2020 | 1105 | 0.0 | 0.0 | 0.0 |
For data sources see[6]