X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485100315000

Well Details

Well ID: 0485100315000
Loading map...
Location: 00/15-03-048-10W5/0
Location Alias: 00/15-03-48-10 W5M
Location Alias 2: 00/15-03-048-10 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 10
Section: 03
County/Municipality: Brazeau County
Well Name: PENN WEST HZ PEMBINA 15-3-48-10
Operator Name: Obsidian Energy Ltd.
License Number: 0475239
License Date: 2015-04-15
License Status: Issued
Spud Date: 2015-06-30
Final Drill Date: 2015-07-10
Well Total Depth: 4178.00 m
Surface Hole Latitude: 53.096682
Surface Hole Longitude: -115.372471

For data sources see[1][2]

Well History

Date Event
2015-04-15 Obtained License
2015-07-01 Surface Casing Operation Performed
2015-07-03 Direction Drilling Operation Performed - Deviate
2015-07-04 Direction Drilling Operation Performed - Horizontal
2015-07-10 Finished Drilling
2015-07-10 Well Log Performed
2015-07-10 Well Mode changed to Drilled and Cased
2015-07-12 Production Casing Operation Performed
2015-07-12 Rig Released
2015-09-12 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-09-12 Perforation Treatment Performed - Open-Hole Completion
2015-10-02 Perforation Treatment Performed - Jet Perforation
2015-10-13 Well Log Performed
2015-10-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-19 Well Began Production
2015-10-19 Well Fluid changed to Crude Oil
2015-10-19 Well Mode changed to Flowing
2015-10-28 Well Log Performed
2015-11-16 Well Fluid changed to Crude Oil
2015-11-16 Well Mode changed to Pumping
2019-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-06-30 Trinidad Drilling Ltd. 92 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-03 1490.00 Deviate (5 - 79 degrees)
2015-07-04 1875.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-12 Open Hole/Barefoot Completion 4170.00 4178.00 0
2015-10-15 Multi-Stage Fracture 3698.40 3698.50 0
2015-10-15 Multi-Stage Fracture 3612.40 3612.50 0
2015-10-15 Multi-Stage Fracture 3600.00 3600.10 0
2015-10-15 Multi-Stage Fracture 3527.00 3527.10 0
2015-10-15 Multi-Stage Fracture 3441.80 3441.90 0
2015-10-15 Multi-Stage Fracture 3461.60 3461.70 0
2015-10-15 Multi-Stage Fracture 3355.40 3355.50 0
2015-10-16 Multi-Stage Fracture 3269.60 3269.70 0
2015-10-16 Multi-Stage Fracture 3244.90 3245.00 0
2015-10-16 Multi-Stage Fracture 3183.60 3183.70 0
2015-09-12 Hydra Jet Perforation 4140.30 4140.40 0
2015-10-16 Multi-Stage Fracture 3097.40 3097.50 0
2015-10-16 Multi-Stage Fracture 3024.90 3025.00 0
2015-10-16 Multi-Stage Fracture 2952.50 2952.60 0
2015-10-16 Multi-Stage Fracture 2758.40 2758.50 0
2015-10-16 Multi-Stage Fracture 2672.30 2672.40 0
2015-10-16 Multi-Stage Fracture 2586.30 2586.40 0
2015-10-16 Multi-Stage Fracture 2500.20 2500.30 0
2015-10-16 Multi-Stage Fracture 2414.20 2414.30 0
2015-10-16 Multi-Stage Fracture 2328.10 2328.20 0
2015-10-17 Multi-Stage Fracture 2242.10 2242.20 0
2015-10-02 Perforation 4139.30 4140.30 17
2015-10-17 Multi-Stage Fracture 2156.20 2156.30 0
2015-10-17 Multi-Stage Fracture 1975.00 1975.10 0
2015-10-17 Multi-Stage Fracture 1902.50 1902.60 0
2019-07-12 Acid Treatment 1902.50 4178.00 0
2015-10-14 Multi-Stage Fracture 4135.00 4135.10 0
2015-10-14 Multi-Stage Fracture 4043.30 4043.40 0
2015-10-14 Hydra Jet Perforation 3957.30 3957.40 0
2015-10-15 Multi-Stage Fracture 3932.60 3932.70 0
2015-10-15 Multi-Stage Fracture 3871.00 3871.10 0
2015-10-15 Multi-Stage Fracture 3784.60 3784.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-14 2015-10-17 1,773 5,213 N/A
2 2015-10-15 2015-10-16 1,773 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 1.2071 N/A
N2 7727-37-9 100 1.8689 N/A
water Not Available 100 63.4351 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 7.3886 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 1.886 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.011 N/A
dibromoacetonitrile 3252-43-5 100 0.011 N/A
non-hazardous ingredients Not Available 100 0.011 N/A
polyethylene glycol 25322-68-3 100 0.011 N/A
sodium bromide 7647-15-6 100 0.011 N/A
BXL-A Trican Breaker diethanolamine 111-42-2 100 0.0287 N/A
non-hazardous ingredients Not Available 100 0.0287 N/A
triethanolamine 102-71-6 100 0.0287 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.007 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0256 N/A
pH-6 Trican Buffer ethylene glycol 107-21-1 100 0.0554 N/A
formic acid 64-18-6 100 0.0554 N/A
water Not Available 100 0.0554 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1474 N/A
non-hazardous ingredients Not Available 100 0.1474 N/A
AI-7NR Trican Corrosion Inhibitor modified propargyl alcohol Trade Secret 100 0.0044 N/A
propargyl alcohol 107-19-7 100 0.0044 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.0337 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0337 N/A
WXB-2 Trican Crosslinker ethylene glycol 107-21-1 100 0.0082 N/A
monoethanolamine 141-43-5 100 0.0082 N/A
monoethanolamine borate 26038-87-9 100 0.0082 N/A
non-hazardous ingredients Not Available 100 0.0082 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0026 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0552 N/A
propylene glycol 57-55-6 100 0.0552 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0724 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0724 N/A
non-hazardous ingredients Not Available 100 0.0724 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.0636 N/A
IC-2 Trican Iron Control sodium erythorbate 6381-77-7 100 0.0067 N/A
ASA-60W Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0152 N/A
dipropylene glycol 25265-71-8 100 0.0152 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0152 N/A
2 Sand 50/140 Trican silica crystalline 14808-60-7 100 0.5764 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-14 2015-10-17 Surface Water - Runoff 5428

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1240 0.0 0.0 0.0
2016 8383 0.0 0.0 0.0
2017 8248 0.0 0.0 0.0
2018 8076 0.0 0.0 0.0
2019 8653 0.0 0.0 0.0
2020 1818 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-12 No Incident Encountered 0.00 0.00
2015-10-19 No Incident Encountered 0.00 0.00
2019-07-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References