X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485103114040

Well Details

Well ID: 0485103114040
Loading map...
Location: 04/14-31-048-10W5/0
Location Alias: 04/14-31-48-10 W5M
Location Alias 2: 04/14-31-048-10 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 10
Section: 31
County/Municipality: Brazeau County
Well Name: RIDGEBACK 104 HZ PEMBINA 14-31-48-10
Operator Name: Ridgeback Resources Inc.
License Number: 0485814
License Date: 2017-10-16
License Status: Issued
Spud Date: 2017-11-06
Final Drill Date: 2017-11-11
Well Total Depth: 3493.00 m
Surface Hole Latitude: 53.175451
Surface Hole Longitude: -115.461007

For data sources see[1][2]

Well History

Date Event
2017-10-16 Obtained License
2017-11-06 Surface Casing Operation Performed
2017-11-07 Direction Drilling Operation Performed - Deviate
2017-11-08 Direction Drilling Operation Performed - Horizontal
2017-11-11 Finished Drilling
2017-11-11 Well Log Performed
2017-11-11 Well Mode changed to Drilled and Cased
2017-11-12 Production Casing Operation Performed
2017-11-12 Rig Released
2017-12-02 Well Log Performed
2017-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-14 Well Began Production
2017-12-14 Well Fluid changed to Crude Oil
2017-12-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-06 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-07 1436.70 Deviate (5 - 79 degrees)
2017-11-08 1996.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-06 Multi-Stage Fracture 3460.00 3460.10 0
2017-12-07 Multi-Stage Fracture 3010.00 3010.10 0
2017-12-08 Multi-Stage Fracture 2960.00 2960.10 0
2017-12-08 Multi-Stage Fracture 2910.00 2910.10 0
2017-12-08 Multi-Stage Fracture 2860.00 2860.10 0
2017-12-08 Multi-Stage Fracture 2810.00 2810.10 0
2017-12-08 Multi-Stage Fracture 2760.00 2760.10 0
2017-12-08 Multi-Stage Fracture 2710.00 2710.10 0
2017-12-08 Multi-Stage Fracture 2660.00 2660.10 0
2017-12-08 Multi-Stage Fracture 2610.00 2610.10 0
2017-12-08 Multi-Stage Fracture 2560.00 2560.10 0
2017-12-07 Multi-Stage Fracture 3410.00 3410.10 0
2017-12-08 Multi-Stage Fracture 2510.00 2510.10 0
2017-12-08 Multi-Stage Fracture 2460.00 2460.10 0
2017-12-08 Multi-Stage Fracture 2410.00 2410.10 0
2017-12-08 Multi-Stage Fracture 2360.00 2360.10 0
2017-12-08 Multi-Stage Fracture 2310.00 2310.10 0
2017-12-08 Multi-Stage Fracture 2260.00 2260.10 0
2017-12-08 Multi-Stage Fracture 2210.00 2210.10 0
2017-12-08 Multi-Stage Fracture 2160.00 2160.10 0
2017-12-08 Multi-Stage Fracture 2110.00 2110.10 0
2017-12-08 Multi-Stage Fracture 2060.00 2060.10 0
2017-12-07 Multi-Stage Fracture 3360.00 3360.10 0
2017-12-08 Multi-Stage Fracture 2019.00 2019.10 0
2017-12-07 Multi-Stage Fracture 3310.00 3310.10 0
2017-12-07 Multi-Stage Fracture 3260.00 3260.10 0
2017-12-07 Multi-Stage Fracture 3210.00 3210.10 0
2017-12-07 Multi-Stage Fracture 3160.00 3160.10 0
2017-12-07 Multi-Stage Fracture 3110.00 3110.10 0
2017-12-07 Multi-Stage Fracture 3060.00 3060.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-06 2017-12-08 1,761 3,544 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.9951 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 6.0048 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0123 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0123 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0969 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0969 N/A
ELE-Glide Lubricant Element Friction Reducer Dinonylphenyl polyoxyethylene 9014-93-1 100 0.0153 N/A
Ethylene Glycol Monobutyl Ether 111-76-2 100 0.0153 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0153 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydroxy-.branche
d
127087-87-0 100 0.0153 N/A
Polyethylene glycol 25322-68-3 100 0.0153 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.1196 N/A
Tergitol 15-S-20 68131-40-8 100 0.1196 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0971 N/A
Methanol 67-56-1 100 0.0971 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0971 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-02 2017-12-05 Surface Water - Lake 4520
2017-12-06 2017-12-06 Central Water Distribution Facility 30

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 432 0.0 0.0 0.0
2018 8651 0.0 0.0 0.0
2019 8658 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-12 No Incident Encountered 0.00 0.00
2017-12-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References