If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485110209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.116414,"lon":-115.515727,"icon":""}]} |
Location: 00/09-02-048-11W5/0 | |
Location Alias: 00/09-02-48-11 W5M | |
Location Alias 2: 00/09-02-048-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Brazeau County | |
Well Name: RIDGEBACK HZ PEMBINA 9-2-48-11 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0487607 | |
License Date: 2018-01-10 | |
License Status: Issued | |
Spud Date: 2018-02-08 | |
Final Drill Date: 2018-02-14 | |
Well Total Depth: 3457.00 m | |
Surface Hole Latitude: 53.116414 | |
Surface Hole Longitude: -115.515727 |
Date | Event |
---|---|
2018-01-10 | Obtained License |
2018-02-09 | Surface Casing Operation Performed |
2018-02-11 | Direction Drilling Operation Performed - Deviate |
2018-02-11 | Direction Drilling Operation Performed - Horizontal |
2018-02-14 | Finished Drilling |
2018-02-14 | Well Log Performed |
2018-02-14 | Well Mode changed to Drilled and Cased |
2018-02-15 | Perforation Treatment Performed - Open-Hole Completion |
2018-02-15 | Production Casing Operation Performed |
2018-02-15 | Rig Released |
2018-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-19 | Well Began Production |
2018-03-19 | Well Fluid changed to Crude Oil |
2018-03-19 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-08 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-11 | 1637.40 | Deviate (5 - 79 degrees) |
2018-02-11 | 1964.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-15 | Open Hole/Barefoot Completion | 3452.00 | 3457.00 | 0 |
2018-03-06 | Multi-Stage Fracture | 3142.00 | 3142.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3106.00 | 3106.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3070.00 | 3070.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3034.00 | 3034.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2998.00 | 2998.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2962.00 | 2962.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2926.00 | 2926.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2890.00 | 2890.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2854.00 | 2854.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2818.00 | 2818.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3430.00 | 3430.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2782.00 | 2782.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2746.00 | 2746.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2710.00 | 2710.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2674.00 | 2674.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2638.00 | 2638.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2602.00 | 2602.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 2566.00 | 2566.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2530.00 | 2530.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2494.00 | 2494.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2458.00 | 2458.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3394.00 | 3394.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2422.00 | 2422.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2386.00 | 2386.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2350.00 | 2350.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2314.00 | 2314.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2278.00 | 2278.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2242.00 | 2242.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2206.00 | 2206.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2170.00 | 2170.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2134.00 | 2134.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2098.00 | 2098.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3358.00 | 3358.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2062.00 | 2062.10 | 0 |
2018-03-07 | Multi-Stage Fracture | 2015.00 | 2015.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3322.00 | 3322.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3286.00 | 3286.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3250.00 | 3250.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3214.00 | 3214.10 | 0 |
2018-03-06 | Multi-Stage Fracture | 3178.00 | 3178.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-06 | 2018-03-07 | 1,866 | 6,545 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 95.5733 | N/A | |||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.0259 | N/A | ||
40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.4007 | N/A | ||
ELECIDE - 1L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0017 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0017 | N/A | ||||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0092 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0092 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0895 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0895 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0955 | N/A | |
Methanol | 67-56-1 | 100 | 0.0955 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0955 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-28 | 2018-03-02 | Surface Water - Runoff | 2990 |
2018-03-04 | 2018-03-05 | Surface Water - Lake | 3363 |
2018-03-03 | 2018-03-04 | Surface Water - Runoff | 565 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6635 | 0.0 | 0.0 | 0.0 |
2019 | 8739 | 0.0 | 0.0 | 0.0 |
2020 | 2142 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-15 | No Incident Encountered | 0.00 | 0.00 |
2018-03-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]