If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485110416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.104147,"lon":-115.543871,"icon":""}]} |
| Location: 00/16-04-048-11W5/0 | |
| Location Alias: 00/16-04-48-11 W5M | |
| Location Alias 2: 00/16-04-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 04 | |
| County/Municipality: Brazeau County | |
| Well Name: DAYLIGHT HZ PEMBINA 16-4-48-11 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0427022 | |
| License Date: 2010-12-06 | |
| License Status: Issued | |
| Spud Date: 2011-08-25 | |
| Final Drill Date: 2011-09-15 | |
| Well Total Depth: 3375.00 m | |
| Surface Hole Latitude: 53.104147 | |
| Surface Hole Longitude: -115.543871 |
| Date | Event |
|---|---|
| 2010-12-06 | Obtained License |
| 2011-08-25 | Well Log Performed |
| 2011-08-28 | Surface Casing Operation Performed |
| 2011-08-30 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-04 | Well Log Performed |
| 2011-09-05 | Well Log Performed |
| 2011-09-07 | Intermediate Casing Operation Performed |
| 2011-09-15 | Finished Drilling |
| 2011-09-15 | Well Log Performed |
| 2011-09-15 | Well Mode changed to Drilled and Cased |
| 2011-09-18 | Liner Casing Operation Performed |
| 2011-09-18 | Rig Released |
| 2011-09-26 | Well Log Performed |
| 2011-10-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-02 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-10-13 | Well Began Production |
| 2011-10-13 | Well Fluid changed to Crude Oil |
| 2011-10-13 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-30 | 1468.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-02 | Open Hole/Barefoot Completion | 3370.00 | 3375.00 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2760.50 | 2760.60 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2683.10 | 2683.20 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2615.90 | 2616.00 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2536.60 | 2536.70 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2468.20 | 2468.30 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2401.20 | 2401.30 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2320.40 | 2320.50 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2253.30 | 2253.40 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2185.50 | 2185.60 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2117.40 | 2117.50 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 3348.30 | 3348.40 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 3260.70 | 3260.80 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 3192.40 | 3192.50 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 3110.60 | 3110.70 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 3042.30 | 3042.40 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2976.70 | 2976.80 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2901.40 | 2901.50 | 0 |
| 2011-10-02 | Multi-Stage Fracture | 2826.80 | 2826.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1697 | 0.0 | 0.0 | 0.0 |
| 2012 | 8165 | 0.0 | 0.0 | 0.0 |
| 2013 | 8470 | 0.0 | 0.0 | 0.0 |
| 2014 | 7585 | 0.0 | 0.0 | 0.0 |
| 2015 | 7995 | 0.0 | 0.0 | 0.0 |
| 2016 | 8666 | 0.0 | 0.0 | 0.0 |
| 2017 | 6081 | 0.0 | 0.0 | 0.0 |
| 2018 | 3380 | 0.0 | 0.0 | 0.0 |
| 2019 | 7152 | 0.0 | 0.0 | 0.0 |
| 2020 | 2013 | 0.0 | 0.0 | 0.0 |
For data sources see[6]