X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111304000

Well Details

Well ID: 0485111304000
Loading map...
Location: 00/04-13-048-11W5/0
Location Alias: 00/04-13-48-11 W5M
Location Alias 2: 00/04-13-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 13
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 4-13-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0423977
License Date: 2010-09-28
License Status: Amended
Spud Date: 2010-10-14
Final Drill Date: 2010-10-23
Well Total Depth: 3158.00 m
Surface Hole Latitude: 53.137622
Surface Hole Longitude: -115.461703

For data sources see[1][2]

Well History

Date Event
2010-09-28 Obtained License
2010-10-16 Surface Casing Operation Performed
2010-10-16 Well Log Performed
2010-10-18 Direction Drilling Operation Performed - Horizontal
2010-10-18 Well Log Performed
2010-10-23 Finished Drilling
2010-10-23 Perforation Treatment Performed - Open-Hole Completion
2010-10-23 Well Log Performed
2010-10-23 Well Mode changed to Drilled and Cased
2010-10-26 Liner Casing Operation Performed
2010-10-26 Production Casing Operation Performed
2010-10-26 Rig Released
2010-11-25 Well Log Performed
2011-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-11 Well Began Production
2011-01-11 Well Fluid changed to Crude Oil
2011-01-11 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-18 1420.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-23 Open Hole/Barefoot Completion 3087.00 3158.00 0
2011-01-06 Multi-Stage Fracture 2512.60 2512.70 0
2011-01-07 Multi-Stage Fracture 2453.40 2453.50 0
2011-01-08 Multi-Stage Fracture 2384.10 2384.20 0
2011-01-08 Multi-Stage Fracture 2325.50 2325.60 0
2011-01-08 Multi-Stage Fracture 2256.30 2256.40 0
2011-01-08 Multi-Stage Fracture 2186.30 2186.40 0
2011-01-08 Multi-Stage Fracture 2127.20 2127.30 0
2011-01-06 Multi-Stage Fracture 3039.70 3039.80 0
2011-01-06 Multi-Stage Fracture 2979.00 2979.10 0
2011-01-06 Multi-Stage Fracture 2909.00 2909.10 0
2011-01-06 Multi-Stage Fracture 2849.80 2849.90 0
2011-01-06 Multi-Stage Fracture 2779.80 2779.90 0
2011-01-06 Multi-Stage Fracture 2710.40 2710.50 0
2011-01-06 Multi-Stage Fracture 2651.20 2651.30 0
2011-01-06 Multi-Stage Fracture 2581.50 2581.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7586 0.0 0.0 0.0
2012 8741 0.0 0.0 0.0
2013 8718 0.0 0.0 0.0
2014 8399 0.0 0.0 0.0
2015 8659 0.0 0.0 0.0
2016 8519 0.0 0.0 0.0
2017 8603 0.0 0.0 0.0
2018 6747 0.0 0.0 0.0
2019 5662 0.0 0.0 0.0
2020 1918 0.0 0.0 0.0

For data sources see[6]

References