If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485111304020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.139098,"lon":-115.516885,"icon":""}]} |
| Location: 02/04-13-048-11W5/0 | |
| Location Alias: 02/04-13-48-11 W5M | |
| Location Alias 2: 02/04-13-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 13 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK HZ 102 PEMBINA 4-13-48-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0491646 | |
| License Date: 2018-10-29 | |
| License Status: Issued | |
| Spud Date: 2019-11-09 | |
| Final Drill Date: 2019-11-17 | |
| Well Total Depth: 4021.00 m | |
| Surface Hole Latitude: 53.139098 | |
| Surface Hole Longitude: -115.516885 |
| Date | Event |
|---|---|
| 2018-10-29 | Obtained License |
| 2019-11-09 | Drill To LD |
| 2019-11-10 | Surface Casing Operation Performed |
| 2019-11-11 | Direction Drilling Operation Performed - Deviate |
| 2019-11-13 | Direction Drilling Operation Performed - Horizontal |
| 2019-11-17 | Finished Drilling |
| 2019-11-17 | Well Log Performed |
| 2019-11-17 | Well Mode changed to Drilled and Cased |
| 2019-11-18 | Production Casing Operation Performed |
| 2019-11-18 | Rig Released |
| 2020-01-22 | Well Log Performed |
| 2020-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2020-01-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2020-01-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2020-02-22 | Well Began Production |
| 2020-02-22 | Well Fluid changed to Crude Oil |
| 2020-02-22 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-11-09 | Horizon Drilling Inc. | 39 | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-11-11 | 1480.70 | Deviate (5 - 79 degrees) |
| 2019-11-13 | 1970.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2020-01-26 | Multi-Stage Fracture | 3982.70 | 3982.80 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3621.00 | 3621.10 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3580.20 | 3580.30 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3540.10 | 3540.20 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3498.20 | 3498.30 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3471.40 | 3741.50 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3430.10 | 3430.20 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3388.30 | 3388.40 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3347.40 | 3347.50 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3305.60 | 3305.70 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3264.00 | 3264.10 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 3490.80 | 3490.90 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3222.20 | 3222.30 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3181.50 | 3181.60 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 3140.80 | 3140.90 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 3099.50 | 3099.60 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 3071.80 | 3071.90 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 3030.20 | 3030.30 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2989.60 | 2989.70 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2949.20 | 2949.30 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2907.30 | 2907.40 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2865.50 | 2865.60 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 3898.90 | 3899.00 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2823.90 | 2824.00 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2781.90 | 2782.00 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2740.60 | 2740.70 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2700.00 | 2700.10 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2671.90 | 2672.00 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2630.60 | 2630.70 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2589.40 | 2589.50 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2547.40 | 2547.50 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2505.40 | 2505.50 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2464.10 | 2464.20 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 3871.50 | 3871.60 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2423.10 | 2423.20 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2381.30 | 2381.40 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2340.00 | 2340.10 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2312.40 | 2312.50 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2270.60 | 2270.70 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2228.80 | 2228.90 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2188.70 | 2188.80 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2147.40 | 2147.50 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2107.30 | 2107.40 | 0 |
| 2020-01-28 | Multi-Stage Fracture | 2066.80 | 2066.90 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 3829.70 | 3829.80 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3787.80 | 3787.90 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3746.10 | 3746.20 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3704.50 | 3704.60 | 0 |
| 2020-01-27 | Multi-Stage Fracture | 3663.00 | 3663.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2020-01-26 | 2020-01-28 | 1,830 | 6,979 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 94.8331 | N/A | |||
| 40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.1668 | N/A | ||
| ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0088 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0088 | N/A | ||||
| ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0869 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0869 | N/A | ||||
| Nitrogen | Element | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.7271 | N/A | |
| ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.11 | N/A | |
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.11 | N/A | ||||
| ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0869 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0869 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0869 | N/A |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2020 | 945 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-11-18 | No Incident Encountered | 0.00 | 0.00 |
| 2020-01-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]