X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111307002

Well Details

Well ID: 0485111307002
Loading map...
Location: 00/07-13-048-11W5/2
Location Alias: 00/07-13-48-11 W5M
Location Alias 2: 00/07-13-048-11 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 13
County/Municipality: Brazeau County
Well Name: SAFFRON PEMBINA 7-13-48-11
Operator Name: Saffron Energy Ltd.
License Number: 0045955
License Date: 1973-05-30
License Status: RecCertified
Spud Date: 1973-06-04
Final Drill Date: 1973-07-12
Well Total Depth: 3016.60 m
Surface Hole Latitude: 53.140214
Surface Hole Longitude: -115.472192

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-05-30 Obtained License
1973-06-05 Lost Circulation Occurred
1973-06-15 Drill Stem Test Performed
1973-06-20 Lost Circulation Occurred
1973-06-26 Drill Stem Test Performed
1973-07-12 Finished Drilling
1973-07-12 Well Mode changed to Drilled and Cased
1973-07-17 Surface Casing Operation Performed
1973-07-28 Perforation Treatment Performed - Alcohol Squeeze
1973-07-28 Perforation Treatment Performed - Jet Perforation
1984-08-21 Perforation Treatment Performed - Cement Squeeze
1984-08-21 Perforation Treatment Performed - Jet Perforation
1984-08-21 Plug Back Performed
1984-08-27 Perforation Treatment Performed - Fractured
1984-10-02 Well Began Production
1984-10-02 Well Fluid changed to Crude Oil
1984-10-02 Well Mode changed to Pumping
1985-08-28 Well Fluid changed to Crude Oil
1985-08-28 Well Mode changed to Suspended
2001-07-14 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-08-23 Well Fluid changed to Crude Oil
2001-08-23 Well Mode changed to Pumping
2001-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-05 Perforation Treatment Performed - Cement Squeeze
2001-12-05 Perforation Treatment Performed - Jet Perforation
2001-12-07 Well Abandoned
2001-12-07 Well Fluid changed to Crude Oil
2001-12-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-07-28 Perforation 2314.70 2321.40 7
2001-12-05 Packing Device Capped w/Cement 513.00 533.00 0
1973-07-28 Alchohol Squeeze 2314.70 2321.40 0
1984-08-21 Cement Squeeze 2314.70 2321.00 0
1984-08-21 Perforation 1770.00 1777.00 13
1984-08-27 Fracture 1770.00 1777.00 0
2001-07-14 Bridge Plug, No Cement 2302.00 2321.00 0
2001-12-04 Packing Device Capped w/Cement 1757.00 1765.00 0
2001-12-05 Perforation 533.00 533.50 13
2001-12-05 Cement Squeeze 533.00 533.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 24 0.0 0.0 0.0
1985 576 0.0 0.0 0.0
2001 1480 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-06-05 Lost Circulation 31.60 31.60
1973-06-20 Lost Circulation 2227.40 2227.40

For data sources see[6]

References