X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111409000

Well Details

Well ID: 0485111409000
Loading map...
Location: 00/09-14-048-11W5/0
Location Alias: 00/09-14-48-11 W5M
Location Alias 2: 00/09-14-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 14
County/Municipality: Brazeau County
Well Name: RIDGEBACK HZ PEMBINA 9-14-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0491643
License Date: 2018-10-29
License Status: Amended
Spud Date: 2019-10-23
Final Drill Date: 2019-10-29
Well Total Depth: 3752.00 m
Surface Hole Latitude: 53.139457
Surface Hole Longitude: -115.516881

For data sources see[1][2]

Well History

Date Event
2018-10-29 Obtained License
2019-10-23 Drill To LD
2019-10-23 Surface Casing Operation Performed
2019-10-24 Direction Drilling Operation Performed - Deviate
2019-10-26 Direction Drilling Operation Performed - Horizontal
2019-10-29 Finished Drilling
2019-10-29 Production Casing Operation Performed
2019-10-29 Well Log Performed
2019-10-29 Well Mode changed to Drilled and Cased
2019-10-30 Perforation Treatment Performed - Open-Hole Completion
2019-10-30 Rig Released
2020-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2020-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2020-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-22 Well Began Production
2020-02-22 Well Fluid changed to Crude Oil
2020-02-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-23 Horizon Drilling Inc. 39 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-10-24 1001.60 Deviate (5 - 79 degrees)
2019-10-26 2097.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-30 Open Hole/Barefoot Completion 3747.00 3752.00 0
2020-01-22 Multi-Stage Fracture 3398.70 3398.80 0
2020-01-22 Multi-Stage Fracture 3358.00 3358.10 0
2020-01-22 Multi-Stage Fracture 3329.60 3329.70 0
2020-01-22 Multi-Stage Fracture 3288.90 3289.00 0
2020-01-22 Multi-Stage Fracture 3248.10 3248.20 0
2020-01-22 Multi-Stage Fracture 3206.20 3206.30 0
2020-01-22 Multi-Stage Fracture 3164.90 3165.00 0
2020-01-23 Multi-Stage Fracture 3123.20 3123.30 0
2020-01-23 Multi-Stage Fracture 3082.10 3082.20 0
2020-01-23 Multi-Stage Fracture 3041.90 3042.00 0
2020-01-22 Multi-Stage Fracture 3714.70 3714.80 0
2020-01-23 Multi-Stage Fracture 3013.60 3013.70 0
2020-01-23 Multi-Stage Fracture 2971.50 2971.60 0
2020-01-23 Multi-Stage Fracture 2929.30 2929.40 0
2020-01-23 Multi-Stage Fracture 2887.10 2887.20 0
2020-01-23 Multi-Stage Fracture 2845.10 2845.20 0
2020-01-23 Multi-Stage Fracture 2804.60 2804.70 0
2020-01-23 Multi-Stage Fracture 2777.40 2777.50 0
2020-01-23 Multi-Stage Fracture 2735.20 2735.30 0
2020-01-23 Multi-Stage Fracture 2694.50 2694.60 0
2020-01-23 Multi-Stage Fracture 2654.10 2654.20 0
2020-01-22 Multi-Stage Fracture 3674.20 3674.30 0
2020-01-23 Multi-Stage Fracture 2612.50 2612.60 0
2020-01-23 Multi-Stage Fracture 2570.60 2570.70 0
2020-01-23 Multi-Stage Fracture 2529.10 2529.20 0
2020-01-24 Multi-Stage Fracture 2487.90 2488.00 0
2020-01-24 Multi-Stage Fracture 2459.80 2459.90 0
2020-01-24 Multi-Stage Fracture 2418.10 2418.20 0
2020-01-24 Multi-Stage Fracture 2376.20 2376.30 0
2020-01-24 Multi-Stage Fracture 2335.70 2335.80 0
2020-01-24 Multi-Stage Fracture 2294.00 2294.10 0
2020-01-24 Multi-Stage Fracture 2252.10 2252.20 0
2020-01-22 Multi-Stage Fracture 3634.40 3634.50 0
2020-01-24 Multi-Stage Fracture 2211.10 2211.20 0
2020-01-24 Multi-Stage Fracture 2182.90 2183.00 0
2020-01-22 Multi-Stage Fracture 3606.20 3606.30 0
2020-01-22 Multi-Stage Fracture 3565.30 3565.40 0
2020-01-22 Multi-Stage Fracture 3523.90 3524.00 0
2020-01-22 Multi-Stage Fracture 3482.00 3482.10 0
2020-01-22 Multi-Stage Fracture 3440.30 3440.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2020-01-22 2020-01-24 1,828 6,034 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 94.7433 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 5.3914 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0117 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0117 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.092 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.092 N/A
Nitrogen Element Energizing Fluid Nitrogen 7727-37-9 100 0.8223 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.104 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.104 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0921 N/A
Methanol 67-56-1 100 0.0921 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0921 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 945 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-30 No Incident Encountered 0.00 0.00
2020-01-24 No Incident Encountered 0.00 0.00

For data sources see[9]

References