X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111605000

Well Details

Well ID: 0485111605000
Loading map...
Location: 00/05-16-048-11W5/0
Location Alias: 00/05-16-48-11 W5M
Location Alias 2: 00/05-16-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 16
County/Municipality: Brazeau County
Well Name: TQN PEMBINA 5-16-48-11
Operator Name: TAQA North Ltd.
License Number: 0069261
License Date: 1978-04-27
License Status: Suspension
Spud Date: 1978-05-26
Final Drill Date: 1978-07-28
Well Total Depth: 3133.30 m
Surface Hole Latitude: 53.139170
Surface Hole Longitude: -115.557808

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-04-27 Obtained License
1978-05-27 Lost Circulation Occurred
1978-07-28 Finished Drilling
1978-07-31 Drill Stem Test Performed
1978-08-05 Drill Stem Test Performed
1978-08-06 Drill Stem Test Performed
1978-08-07 Drill Stem Test Performed
1978-08-10 Liner Casing Operation Performed
1978-12-21 Perforation Treatment Performed - Jet Perforation
1979-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-11 Perforation Treatment Performed - Fractured
1979-01-11 Well Mode changed to Drilled and Cased
1979-01-21 Well Began Production
1979-01-21 Well Fluid changed to Crude Oil
1979-01-21 Well Mode changed to Flowing
1996-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-10 Perforation Treatment Performed - Fractured
1996-10-10 Perforation Treatment Performed - Jet Perforation
1996-10-10 Plug Back Performed
1996-10-10 Well Fluid changed to Crude Oil
1996-10-10 Well Log Performed
1996-10-10 Well Mode changed to Abandoned Zone
1996-10-27 Well Log Performed
2003-07-20 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-21 Perforation 2489.60 2491.70 7
1979-01-06 Acid Treatment 2489.60 2491.70 0
1979-01-11 Fracture 2489.60 2491.70 0
1996-10-10 Packing Device Capped w/Cement 2477.00 2485.00 0
1996-10-10 Perforation 2440.50 2444.00 20
1996-10-10 Fracture 2440.50 2444.00 0
2003-07-20 Perforation 2489.60 2491.70 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 240 0.0 0.0 0.0
1980 1524 0.0 0.0 0.0
1981 6902 0.0 0.0 0.0
1982 5814 0.0 0.0 0.0
1983 7660 0.0 0.0 0.0
1984 6617 0.0 0.0 0.0
1985 7618 0.0 0.0 0.0
1986 6449 0.0 0.0 0.0
1987 7642 0.0 0.0 0.0
1988 8399 0.0 0.0 0.0
1989 8335 0.0 0.0 0.0
1990 7274 0.0 0.0 0.0
1991 8104 0.0 0.0 0.0
1992 8776 0.0 0.0 0.0
1993 8436 0.0 0.0 0.0
1994 8416 0.0 0.0 0.0
1995 8410 0.0 0.0 0.0
1996 6701 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-05-27 Lost Circulation 31.10 31.10

For data sources see[6]

References