X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111613000

Well Details

Well ID: 0485111613000
Loading map...
Location: 00/13-16-048-11W5/0
Location Alias: 00/13-16-48-11 W5M
Location Alias 2: 00/13-16-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 16
County/Municipality: Brazeau County
Well Name: TAC 14-09 HZ PEMBINA 13-16-48-11
Operator Name: Tamarack Acquisition Corp.
License Number: 0494728
License Date: 2019-06-04
License Status: Issued
Spud Date: 2020-02-08
Final Drill Date: 2020-02-15
Well Total Depth: 3785.00 m
Surface Hole Latitude: 53.133037
Surface Hole Longitude: -115.550716

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-08 Precision Drilling Corporation 309 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-10 1606.70 Deviate (5 - 79 degrees)
2020-02-13 2129.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-28 Multi-Stage Fracture 3725.40 3725.50 0
2020-02-28 Multi-Stage Fracture 3381.50 3381.60 0
2020-02-28 Multi-Stage Fracture 3343.40 3343.50 0
2020-02-28 Multi-Stage Fracture 3293.90 3294.00 0
2020-02-29 Multi-Stage Fracture 3245.00 3245.10 0
2020-02-29 Multi-Stage Fracture 3195.70 3195.80 0
2020-02-29 Multi-Stage Fracture 3146.20 3146.30 0
2020-02-29 Multi-Stage Fracture 3096.60 3096.70 0
2020-02-29 Multi-Stage Fracture 3047.30 3047.40 0
2020-02-29 Multi-Stage Fracture 2997.80 2997.90 0
2020-02-29 Multi-Stage Fracture 2948.40 2948.50 0
2020-02-28 Multi-Stage Fracture 3687.30 3687.40 0
2020-02-29 Multi-Stage Fracture 2898.60 2898.70 0
2020-02-29 Multi-Stage Fracture 2849.00 2849.10 0
2020-02-29 Multi-Stage Fracture 2799.40 2799.50 0
2020-02-29 Multi-Stage Fracture 2750.20 2750.30 0
2020-02-29 Multi-Stage Fracture 2700.90 2701.00 0
2020-02-29 Multi-Stage Fracture 2651.40 2651.50 0
2020-02-29 Multi-Stage Fracture 2602.10 2602.20 0
2020-02-29 Multi-Stage Fracture 2552.80 2552.90 0
2020-02-29 Multi-Stage Fracture 2503.60 2503.70 0
2020-02-29 Multi-Stage Fracture 2454.40 2454.50 0
2020-02-28 Multi-Stage Fracture 3649.10 3649.20 0
2020-02-29 Multi-Stage Fracture 2405.10 2405.20 0
2020-02-29 Multi-Stage Fracture 2355.60 2355.70 0
2020-02-28 Multi-Stage Fracture 3610.90 3611.00 0
2020-02-28 Multi-Stage Fracture 3572.80 3572.90 0
2020-02-28 Multi-Stage Fracture 3534.50 3534.60 0
2020-02-28 Multi-Stage Fracture 3496.40 3496.50 0
2020-02-28 Multi-Stage Fracture 3458.10 3458.20 0
2020-02-28 Multi-Stage Fracture 3419.90 3420.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 528 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-16 No Incident Encountered 0.00 0.00
2020-02-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References