X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111614000

Well Details

Well ID: 0485111614000
Loading map...
Location: 00/14-16-048-11W5/0
Location Alias: 00/14-16-48-11 W5M
Location Alias 2: 00/14-16-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 16
County/Municipality: Brazeau County
Well Name: TAC 14-09 HZ PEMBINA 14-16-48-11
Operator Name: Tamarack Acquisition Corp.
License Number: 0494729
License Date: 2019-06-04
License Status: Issued
Spud Date: 2020-01-30
Final Drill Date: 2020-02-05
Well Total Depth: 3426.00 m
Surface Hole Latitude: 53.133163
Surface Hole Longitude: -115.550796

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-30 Precision Drilling Corporation 309 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-02 1587.80 Deviate (5 - 79 degrees)
2020-02-03 2065.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-01 Multi-Stage Fracture 3386.50 3386.60 0
2020-03-01 Multi-Stage Fracture 3042.30 3042.40 0
2020-03-01 Multi-Stage Fracture 3004.10 3004.20 0
2020-03-01 Multi-Stage Fracture 2966.00 2966.10 0
2020-03-01 Multi-Stage Fracture 2927.70 2927.80 0
2020-03-01 Multi-Stage Fracture 2878.20 2878.30 0
2020-03-01 Multi-Stage Fracture 2828.80 2828.90 0
2020-03-01 Multi-Stage Fracture 2779.40 2779.50 0
2020-03-01 Multi-Stage Fracture 2730.30 2730.40 0
2020-03-01 Multi-Stage Fracture 2680.70 2680.80 0
2020-03-01 Multi-Stage Fracture 2631.40 2631.50 0
2020-03-01 Multi-Stage Fracture 3348.40 3348.50 0
2020-03-01 Multi-Stage Fracture 2582.10 2582.20 0
2020-03-01 Multi-Stage Fracture 2532.80 2532.90 0
2020-03-01 Multi-Stage Fracture 2483.50 2483.60 0
2020-03-02 Multi-Stage Fracture 2434.10 2434.20 0
2020-03-02 Multi-Stage Fracture 2384.60 2384.70 0
2020-03-02 Multi-Stage Fracture 2335.20 2335.30 0
2020-03-02 Multi-Stage Fracture 2285.80 2285.90 0
2020-03-02 Multi-Stage Fracture 2236.50 2236.60 0
2020-03-02 Multi-Stage Fracture 2187.20 2187.30 0
2020-03-02 Multi-Stage Fracture 2137.80 2137.90 0
2020-03-01 Multi-Stage Fracture 3310.10 3310.20 0
2020-03-02 Multi-Stage Fracture 2088.60 2088.70 0
2020-03-02 Multi-Stage Fracture 2039.00 2039.10 0
2020-03-01 Multi-Stage Fracture 3271.90 3272.00 0
2020-03-01 Multi-Stage Fracture 3233.60 3233.70 0
2020-03-01 Multi-Stage Fracture 3195.50 3195.60 0
2020-03-01 Multi-Stage Fracture 3157.10 3157.20 0
2020-03-01 Multi-Stage Fracture 3119.00 3119.10 0
2020-03-01 Multi-Stage Fracture 3080.70 3080.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 528 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-06 No Incident Encountered 0.00 0.00
2020-03-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References