If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485112410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.158133,"lon":-115.470525,"icon":""}]} |
| Location: 00/10-24-048-11W5/0 | |
| Location Alias: 00/10-24-48-11 W5M | |
| Location Alias 2: 00/10-24-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 24 | |
| County/Municipality: Brazeau County | |
| Well Name: DAYLIGHT PEMBINA 10-24-48-11 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0156938 | |
| License Date: 1993-03-03 | |
| License Status: Suspension | |
| Spud Date: 1993-03-04 | |
| Final Drill Date: 1993-04-07 | |
| Well Total Depth: 3016.00 m | |
| Surface Hole Latitude: 53.158133 | |
| Surface Hole Longitude: -115.470525 |
| Date | Event |
|---|---|
| 1993-03-03 | Obtained License |
| 1993-03-06 | Surface Casing Operation Performed |
| 1993-03-18 | Well Log Performed |
| 1993-03-19 | Drill Stem Test Performed |
| 1993-03-20 | Drill Stem Test Performed |
| 1993-04-01 | Intermediate Casing Operation Performed |
| 1993-04-07 | Finished Drilling |
| 1993-04-08 | Well Log Performed |
| 1993-04-10 | Liner Casing Operation Performed |
| 1993-04-11 | Rig Released |
| 1993-04-11 | Well Log Performed |
| 1993-04-11 | Well Mode changed to Drilled and Cased |
| 1993-09-30 | Perforation Treatment Performed - Jet Perforation |
| 1993-09-30 | Well Log Performed |
| 1993-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2012-12-08 | Well Log Performed |
| 2012-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-12-09 | Perforation Treatment Performed - Cement Squeeze |
| 2012-12-10 | Perforation Treatment Performed - Cement Plug |
| 2012-12-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-12-11 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1993-09-30 | Perforation | 2911.00 | 2919.00 | 13 |
| 1993-10-04 | Acid Treatment | 2911.00 | 2919.00 | 0 |
| 2012-12-09 | Cement Squeeze | 2911.00 | 2919.00 | 0 |
| 2012-12-09 | Packing Device Capped w/Cement | 2824.00 | 2900.00 | 0 |
| 2012-12-10 | Cement Plug | 2782.00 | 2824.00 | 0 |
| 2012-12-11 | Packing Device Capped w/Cement | 2772.00 | 2780.00 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-12-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]