X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485122303000

Well Details

Well ID: 0485122303000
Loading map...
Location: 00/03-23-048-12W5/0
Location Alias: 00/03-23-48-12 W5M
Location Alias 2: 00/03-23-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 23
County/Municipality: Yellowhead County
Well Name: RIDGEBACK HZ PEMBINA 3-23-48-12
Operator Name: Ridgeback Resources Inc.
License Number: 0494856
License Date: 2019-06-14
License Status: Amended
Spud Date: 2019-08-17
Final Drill Date: 2019-08-26
Well Total Depth: 3818.00 m
Surface Hole Latitude: 53.152517
Surface Hole Longitude: -115.622313

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-08-20 1587.10 Deviate (5 - 79 degrees)
2019-08-21 2199.10 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-28 Open Hole/Barefoot Completion 3800.00 3818.00 0
2019-09-20 Multi-Stage Fracture 3481.50 3481.60 0
2019-09-20 Multi-Stage Fracture 3441.30 3441.40 0
2019-09-20 Multi-Stage Fracture 3400.60 3400.70 0
2019-09-20 Multi-Stage Fracture 3372.90 3373.00 0
2019-09-20 Multi-Stage Fracture 3331.70 3331.80 0
2019-09-20 Multi-Stage Fracture 3304.00 3304.10 0
2019-09-21 Multi-Stage Fracture 3263.20 3263.30 0
2019-09-21 Multi-Stage Fracture 3235.50 3235.60 0
2019-09-21 Multi-Stage Fracture 3195.20 3195.30 0
2019-09-21 Multi-Stage Fracture 3167.60 3167.70 0
2019-09-20 Multi-Stage Fracture 3754.30 3754.40 0
2019-09-21 Multi-Stage Fracture 3126.70 3126.80 0
2019-09-21 Multi-Stage Fracture 3086.00 3086.10 0
2019-09-21 Multi-Stage Fracture 3058.30 3058.40 0
2019-09-21 Multi-Stage Fracture 3017.10 3017.20 0
2019-09-21 Multi-Stage Fracture 2989.40 2989.50 0
2019-09-21 Multi-Stage Fracture 2948.20 2948.30 0
2019-09-21 Multi-Stage Fracture 2920.50 2920.60 0
2019-09-21 Multi-Stage Fracture 2879.30 2879.40 0
2019-09-21 Multi-Stage Fracture 2851.60 2851.70 0
2019-09-21 Multi-Stage Fracture 2810.60 2810.70 0
2019-09-20 Multi-Stage Fracture 3726.60 3726.70 0
2019-09-21 Multi-Stage Fracture 2783.00 2783.10 0
2019-09-21 Multi-Stage Fracture 2742.20 2742.30 0
2019-09-21 Multi-Stage Fracture 2701.60 2701.70 0
2019-09-21 Multi-Stage Fracture 2674.80 2674.90 0
2019-09-21 Multi-Stage Fracture 2633.60 2633.70 0
2019-09-21 Multi-Stage Fracture 2605.70 2605.80 0
2019-09-21 Multi-Stage Fracture 2565.20 2565.30 0
2019-09-21 Multi-Stage Fracture 2538.60 2538.70 0
2019-09-21 Multi-Stage Fracture 2497.40 2497.50 0
2019-09-21 Multi-Stage Fracture 2456.50 2456.60 0
2019-09-20 Multi-Stage Fracture 3687.20 3687.30 0
2019-09-21 Multi-Stage Fracture 2429.20 2429.30 0
2019-09-21 Multi-Stage Fracture 2388.20 2388.30 0
2019-09-21 Multi-Stage Fracture 2360.60 2360.70 0
2019-09-21 Multi-Stage Fracture 2319.60 2319.70 0
2019-09-22 Multi-Stage Fracture 2291.90 2292.00 0
2019-09-22 Multi-Stage Fracture 2251.60 2251.70 0
2019-09-22 Multi-Stage Fracture 2223.90 2224.00 0
2019-09-22 Multi-Stage Fracture 2182.70 2182.80 0
2019-09-20 Multi-Stage Fracture 3646.10 3646.20 0
2019-09-20 Multi-Stage Fracture 3618.40 3618.50 0
2019-09-20 Multi-Stage Fracture 3577.80 3577.90 0
2019-09-20 Multi-Stage Fracture 3550.10 3550.20 0
2019-09-20 Multi-Stage Fracture 3509.10 3509.20 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-20 2019-09-22 1,989 7,600 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.7042 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.7007 N/A
Water 7732-18-5 100 95.4431 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 4.5568 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0084 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0084 N/A
ELEBR-4 Element Breaker Ammonium persulfate 7727-54-0 100 0.0123 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0816 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0816 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.1029 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.1029 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0791 N/A
Methanol 67-56-1 100 0.0791 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0791 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1944 0.0 0.0 0.0
2020 2005 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-28 No Incident Encountered 0.00 0.00
2019-09-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References