X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485161012020

Well Details

Well ID: 0485161012020
Loading map...
Location: 02/12-10-048-16W5/0
Location Alias: 02/12-10-48-16 W5M
Location Alias 2: 02/12-10-048-16 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 10
County/Municipality: Yellowhead County
Well Name: CVE PECO 12-10-48-16
Operator Name: Cenovus Energy Inc.
License Number: 0131358
License Date: 1988-01-14
License Status: Issued
Spud Date: 1988-01-17
Final Drill Date: 1988-02-13
Well Total Depth: 3205.00 m
Surface Hole Latitude: 53.129974
Surface Hole Longitude: -116.263125

For data sources see[1][2]

Well History

Date Event
1988-01-14 Obtained License
1988-01-20 Surface Casing Operation Performed
1988-02-13 Finished Drilling
1988-02-14 Well Log Performed
1988-02-16 Kick Occurred
1988-02-16 Production Casing Operation Performed
1988-02-17 Rig Released
1988-03-04 Perforation Treatment Performed - Jet Perforation
1988-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-10 Plug Back Performed
1988-03-11 Perforation Treatment Performed - Jet Perforation
1988-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-12 Perforation Treatment Performed - Jet Perforation
1988-03-13 Perforation Treatment Performed - Cement Squeeze
1988-03-15 Well Log Performed
1988-03-16 Perforation Treatment Performed - Jet Perforation
1988-03-28 Well Mode changed to Drilled and Cased
1989-11-10 Perforation Treatment Performed - Fractured
1990-11-01 Well Began Production
1990-11-01 Well Fluid changed to Gas
1990-11-01 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-04 Perforation 3165.00 3174.00 13
1988-03-10 Packing Device Capped w/Cement 3135.50 3140.00 0
1988-03-11 Perforation 3055.00 3055.50 13
1988-03-12 Perforation 3015.00 3015.50 13
1988-03-12 Acid Treatment 3015.00 3015.50 0
1988-03-13 Cement Squeeze 3015.00 3055.50 0
1988-03-16 Perforation 3066.00 3071.00 13
1989-11-10 Fracture 3066.00 3071.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 139 0.0 0.0 0.0
1990 1181 0.0 0.0 0.0
1991 6116 0.0 0.0 0.0
1992 8329 0.0 0.0 0.0
1993 8032 0.0 0.0 0.0
1994 6345 0.0 0.0 0.0
1995 8413 0.0 0.0 0.0
1996 7932 0.0 0.0 0.0
1997 8642 0.0 0.0 0.0
1998 8363 0.0 0.0 0.0
1999 8381 0.0 0.0 0.0
2000 8123 0.0 0.0 0.0
2001 8250 0.0 0.0 0.0
2002 8471 0.0 0.0 0.0
2003 6438 0.0 0.0 0.0
2004 7003 0.0 0.0 0.0
2005 8423 0.0 0.0 0.0
2006 8683 0.0 0.0 0.0
2007 8288 0.0 0.0 0.0
2008 8015 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 6551 0.0 0.0 0.0
2011 8424 0.0 0.0 0.0
2012 8687 0.0 0.0 0.0
2013 8749 0.0 0.0 0.0
2014 7009 0.0 0.0 0.0
2015 4970 0.0 0.0 0.0
2016 1872 0.0 0.0 0.0
2017 8604 0.0 0.0 0.0
2018 8584 0.0 0.0 0.0
2019 8365 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-02-16 Kick 3205.00 3205.00

For data sources see[6]

References