X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494012507C00

Well Details

Well ID: 0494012507C00
Loading map...
Location: C0/07-25-049-01W4/0
Location Alias: C0/07-25-49-01 W4M
Location Alias 2: C0/07-25-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 25
County/Municipality: Lloydminster
Well Name: LLOYDMINSTER DEVELOPMENT NO. 11
Operator Name: Northwestern Utilities Limited
License Number: 0001646
License Date: 1950-06-30
License Status: RecExempt
Spud Date: 1950-06-30
Final Drill Date: 1950-07-05
Well Total Depth: 588.00 m
Surface Hole Latitude: 53.255314
Surface Hole Longitude: -110.016182

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-30 Obtained License
1950-07-05 Finished Drilling
1950-07-05 Well Mode changed to Drilled and Cased
1950-07-06 Production Casing Operation Performed
1950-08-26 Perforation Treatment Performed - Bullet Perforation
1950-08-27 Perforation Treatment Performed - Cement Squeeze
1950-09-18 Perforation Treatment Performed - Bullet Perforation
1951-02-19 Perforation Treatment Performed - Jet Perforation
1951-03-03 Perforation Treatment Performed - Jet Perforation
1951-03-03 Well Began Production
1951-03-03 Well Fluid changed to Crude Oil
1951-03-03 Well Mode changed to Pumping
1952-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-07-11 Perforation Treatment Performed - Bullet Perforation
1952-08-21 Perforation Treatment Performed - Cement Plug
1952-08-24 Well Abandoned
1952-08-24 Well Fluid changed to Crude Oil
1952-08-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-26 Bullet Perforation 584.30 584.90 13
1950-08-27 Cement Squeeze 584.30 584.90 0
1950-09-18 Bullet Perforation 580.90 581.30 33
1951-02-19 Perforation 580.30 581.90 7
1951-03-03 Perforation 580.30 581.90 7
1952-07-11 Packing Device Capped w/Cement 557.50 557.50 0
1952-07-11 Bullet Perforation 528.20 528.80 13
1952-08-21 Cement Plug 511.10 557.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References