X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494013401C00

Well Details

Well ID: 0494013401C00
Loading map...
Location: C0/01-34-049-01W4/0
Location Alias: C0/01-34-49-01 W4M
Location Alias 2: C0/01-34-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 34
County/Municipality: County of Vermilion River
Well Name: MURPHY LLOYD 1C-34-49-1
Operator Name: Murphy Oil Company Ltd.
License Number: 0003544
License Date: 1951-09-27
License Status: RecCertified
Spud Date: 1951-10-17
Final Drill Date: 1951-10-21
Well Total Depth: 600.50 m
Surface Hole Latitude: 53.266200
Surface Hole Longitude: -110.058965

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-09-27 Obtained License
1951-10-21 Drill Stem Test Performed
1951-10-21 Finished Drilling
1951-10-21 Production Casing Operation Performed
1951-10-21 Well Mode changed to Drilled and Cased
1951-11-20 Perforation Treatment Performed - Bullet Perforation
1951-11-29 Well Began Production
1951-11-29 Well Fluid changed to Crude Oil
1951-11-29 Well Mode changed to Pumping
1952-03-09 Perforation Treatment Performed - Cement Squeeze
1952-03-13 Perforation Treatment Performed - Bullet Perforation
1957-05-08 Perforation Treatment Performed - Bullet Perforation
1957-05-10 Perforation Treatment Performed - Cement Plug
1965-12-29 Well Fluid changed to Crude Oil
1965-12-29 Well Mode changed to Suspended
1976-07-01 Well Fluid changed to Crude Oil
1976-07-01 Well Mode changed to Pumping
1977-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-07-11 Well Abandoned
1977-07-11 Well Fluid changed to Crude Oil
1977-07-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-20 Bullet Perforation 592.80 594.10 13
1952-03-09 Cement Squeeze 592.80 594.10 0
1952-03-13 Bullet Perforation 596.20 597.40 13
1957-05-08 Bullet Perforation 584.00 585.80 13
1957-05-10 Cement Plug 588.30 589.50 0
1977-07-11 Packing Device Capped w/Cement 576.10 576.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1976 4128 0.0 0.0 0.0
1977 2064 0.0 0.0 0.0

For data sources see[5]

References