If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494213115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.277404,"lon":-113.059722,"icon":""}]} |
Location: 00/15-31-049-21W4/0 | |
Location Alias: 00/15-31-49-21 W4M | |
Location Alias 2: 00/15-31-049-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 21 | |
Section: 31 | |
County/Municipality: Leduc County | |
Well Name: CABRE ET AL JOARCAM 15-31-49-21 | |
Operator Name: Enerplus Corporation | |
License Number: 0194235 | |
License Date: 1996-11-28 | |
License Status: Suspension | |
Spud Date: 1997-01-04 | |
Final Drill Date: 1997-01-07 | |
Well Total Depth: 1028.00 m | |
Surface Hole Latitude: 53.277404 | |
Surface Hole Longitude: -113.059722 |
Date | Event |
---|---|
1996-11-28 | Obtained License |
1997-01-05 | Surface Casing Operation Performed |
1997-01-07 | Finished Drilling |
1997-01-07 | Well Log Performed |
1997-01-07 | Well Mode changed to Drilled and Cased |
1997-01-08 | Production Casing Operation Performed |
1997-01-08 | Rig Released |
1997-01-08 | Well Log Performed |
1997-02-14 | Well Log Performed |
1997-02-16 | Well Log Performed |
1997-02-17 | Perforation Treatment Performed - Jet Perforation |
1997-02-18 | Well Log Performed |
1997-02-19 | Perforation Treatment Performed - Jet Perforation |
1997-03-01 | Well Began Production |
1997-03-01 | Well Fluid changed to Crude Oil |
1997-03-01 | Well Mode changed to Pumping |
1997-06-28 | Perforation Treatment Performed - Cement Squeeze |
1997-07-01 | Perforation Treatment Performed - Jet Perforation |
1997-07-04 | Perforation Treatment Performed - Cement Squeeze |
1997-07-05 | Well Log Performed |
1997-07-06 | Perforation Treatment Performed - Jet Perforation |
1997-07-09 | Well Log Performed |
1998-09-30 | Well Fluid changed to Crude Oil |
1998-09-30 | Well Mode changed to Suspended |
2000-06-24 | Perforation Treatment Performed - Jet Perforation |
2000-06-24 | Well Log Performed |
2000-06-26 | Perforation Treatment Performed - Cement Squeeze |
2000-06-26 | Well Log Performed |
2000-06-28 | Perforation Treatment Performed - Jet Perforation |
2000-06-28 | Well Log Performed |
2000-06-30 | Well Log Performed |
2000-07-01 | Perforation Treatment Performed - Cement Squeeze |
2000-08-01 | Well Fluid changed to Crude Oil |
2000-08-01 | Well Mode changed to Pumping |
2005-03-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-03-17 | Perforation Treatment Performed - Jet Perforation |
2005-03-17 | Plug Back Performed |
2005-03-17 | Well Fluid changed to Crude Oil |
2005-03-17 | Well Mode changed to Abandoned Zone |
2005-03-18 | Perforation Treatment Performed - Jet Perforation |
2015-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-05-26 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-02-17 | Perforation | 988.50 | 990.50 | 28 |
2000-07-01 | Cement Squeeze | 981.50 | 983.00 | 0 |
2005-03-17 | Packing Device Capped w/Cement | 966.90 | 974.90 | 0 |
2005-03-17 | Perforation | 217.00 | 221.00 | 20 |
2005-03-18 | Perforation | 191.00 | 195.00 | 20 |
2015-05-26 | Packing Device Capped w/Cement | 229.00 | 237.00 | 0 |
2015-05-26 | Packing Device Capped w/Cement | 175.00 | 183.00 | 0 |
1997-02-19 | Perforation | 987.50 | 988.50 | 28 |
1997-06-28 | Cement Squeeze | 987.50 | 990.50 | 0 |
1997-07-01 | Perforation | 986.00 | 987.00 | 13 |
1997-07-04 | Cement Squeeze | 986.00 | 987.00 | 0 |
1997-07-06 | Perforation | 983.00 | 984.00 | 21 |
2000-06-24 | Perforation | 987.50 | 990.50 | 20 |
2000-06-26 | Cement Squeeze | 983.00 | 984.00 | 0 |
2000-06-28 | Perforation | 981.50 | 983.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 1542 | 0.0 | 0.0 | 0.0 |
2000 | 3404 | 0.0 | 0.0 | 0.0 |
2001 | 7156 | 0.0 | 0.0 | 0.0 |
2004 | 360 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-05-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]