X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494250707020

Well Details

Well ID: 0494250707020
Loading map...
Location: 02/07-07-049-25W4/0
Location Alias: 02/07-07-49-25 W4M
Location Alias 2: 02/07-07-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 07
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 7-7-49-25
Operator Name: NEP Canada ULC
License Number: 0146994
License Date: 1990-12-18
License Status: RecCertified
Spud Date: 1990-12-23
Final Drill Date: 1990-12-29
Well Total Depth: 1415.00 m
Surface Hole Latitude: 53.212650
Surface Hole Longitude: -113.642723

For data sources see[1][2]

Well History

Date Event
1990-12-18 Obtained License
1990-12-24 Surface Casing Operation Performed
1990-12-29 Finished Drilling
1990-12-29 Well Log Performed
1990-12-30 Drill Stem Test Performed
1991-01-01 Production Casing Operation Performed
1991-01-01 Rig Released
1991-01-23 Well Log Performed
1991-01-25 Perforation Treatment Performed - Jet Perforation
1991-01-25 Well Log Performed
1991-01-27 Well Log Performed
1991-01-28 Perforation Treatment Performed - Jet Perforation
1991-01-30 Perforation Treatment Performed - Fractured
1991-02-01 Well Mode changed to Drilled and Cased
1998-12-18 Well Log Performed
1998-12-19 Perforation Treatment Performed - Fractured
1998-12-19 Perforation Treatment Performed - Jet Perforation
1998-12-19 Well Mode changed to Drilled and Cased
2001-03-01 Perforation Treatment Performed - Chemical Squeeze
2001-03-01 Perforation Treatment Performed - Fractured
2001-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-03 Perforation Treatment Performed - Cement Squeeze
2001-03-03 Plug Back Performed
2004-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-15 Plug Back Performed
2004-03-15 Well Mode changed to Abandoned Zone
2004-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-16 Plug Back Performed
2004-03-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-25 Perforation 1390.00 1391.50 13
2004-03-15 Packing Device Capped w/Cement 1366.00 1374.00 0
2004-03-16 Packing Device Capped w/Cement 1302.00 1310.00 0
2004-03-16 Packing Device Capped w/Cement 1210.00 1218.00 0
1991-01-28 Perforation 1314.00 1317.00 13
1991-01-30 Fracture 1314.00 1317.00 0
1998-12-19 Perforation 1220.00 1228.00 18
1998-12-19 Fracture 1220.00 1228.00 0
2001-03-01 Fracture 1390.00 1391.50 0
2001-03-01 Chemical Squeeze 1220.00 1228.00 0
2001-03-03 Acid Treatment 1220.00 1228.00 0
2001-03-03 Cement Squeeze 1220.00 1228.00 0

For data sources see[4]



References