X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494251112000

Well Details

Well ID: 0494251112000
Loading map...
Location: 00/12-11-049-25W4/0
Location Alias: 00/12-11-49-25 W4M
Location Alias 2: 00/12-11-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 11
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 12-11-49-25
Operator Name: NEP Canada ULC
License Number: 0105393
License Date: 1984-01-23
License Status: Abandoned
Spud Date: 1984-01-24
Final Drill Date: 1984-01-31
Well Total Depth: 1610.00 m
Surface Hole Latitude: 53.216984
Surface Hole Longitude: -113.560699

For data sources see[1][2]

Well History

Date Event
1984-01-23 Obtained License
1984-01-31 Finished Drilling
1984-01-31 Well Log Performed
1984-01-31 Well Mode changed to Drilled and Cased
1984-02-01 Drill Stem Test Performed
1984-02-01 Well Log Performed
1984-02-02 Production Casing Operation Performed
1984-02-09 Perforation Treatment Performed - Jet Perforation
1984-02-09 Well Log Performed
1984-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-01 Well Began Production
1984-03-01 Well Fluid changed to Crude Oil
1984-03-01 Well Mode changed to Flowing
1984-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-21 Well Log Performed
1984-04-12 Well Log Performed
1984-04-14 Perforation Treatment Performed - Cement Squeeze
1984-04-16 Well Fluid changed to Crude Oil
1984-04-16 Well Mode changed to Pumping
1984-05-10 Perforation Treatment Performed - Jet Perforation
1984-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-11 Perforation Treatment Performed - Jet Perforation
1984-07-11 Well Log Performed
1985-06-21 Perforation Treatment Performed - Fractured
1985-06-23 Perforation Treatment Performed - Jet Perforation
1998-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-15 Plug Back Performed
1999-09-10 Well Abandoned
1999-09-10 Well Fluid changed to Crude Oil
1999-09-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-09 Perforation 1563.00 1568.00 13
1984-05-11 Acid Treatment 1568.00 1578.30 0
1984-07-11 Perforation 1563.00 1565.00 13
1984-07-11 Acid Treatment 1563.00 1565.00 0
1985-06-21 Fracture 1563.00 1578.30 0
1985-06-23 Perforation 1580.00 1583.00 0
1998-07-15 Packing Device Capped w/Cement 1542.00 1550.00 0
1984-02-09 Perforation 1573.00 1574.00 13
1984-02-09 Perforation 1575.00 1576.00 13
1984-02-09 Perforation 1580.00 1583.00 13
1984-02-10 Acid Treatment 1563.00 1583.00 0
1984-03-21 Packing Device Capped w/Cement 1579.00 1579.00 0
1984-04-14 Cement Squeeze 1563.00 1568.00 0
1984-05-10 Perforation 1575.30 1578.30 13
1984-05-10 Perforation 1568.00 1569.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 6529 0.0 0.0 0.0
1985 4356 0.0 0.0 0.0

For data sources see[5]

References