If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494252906025 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.256998,"lon":-113.627077,"icon":""}]} |
Location: 02/06-29-049-25W4/5 | |
Location Alias: 02/06-29-49-25 W4M | |
Location Alias 2: 02/06-29-049-25 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Leduc County | |
Well Name: MEC LEDUC-WB 6-29-49-25 | |
Operator Name: NEP Canada ULC | |
License Number: 0055171 | |
License Date: 1975-10-01 | |
License Status: Abandoned | |
Spud Date: 1975-10-08 | |
Final Drill Date: 1975-10-30 | |
Well Total Depth: 1661.20 m | |
Surface Hole Latitude: 53.256998 | |
Surface Hole Longitude: -113.627077 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-10-01 | Obtained License |
1975-10-12 | Drill Stem Test Performed |
1975-10-17 | Drill Stem Test Performed |
1975-10-28 | Drill Stem Test Performed |
1975-10-29 | Drill Stem Test Performed |
1975-10-30 | Finished Drilling |
1975-10-30 | Well Mode changed to Drilled and Cased |
1975-10-31 | Drill Stem Test Performed |
1975-10-31 | Well Log Performed |
1975-11-01 | Drill Stem Test Performed |
1975-11-02 | Production Casing Operation Performed |
1975-11-14 | Perforation Treatment Performed - Jet Perforation |
1975-11-18 | Perforation Treatment Performed - Acid Wash - No Pressure |
1976-01-15 | Perforation Treatment Performed - Cement Squeeze |
1976-01-17 | Perforation Treatment Performed - Jet Perforation |
1976-01-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
1976-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-01-31 | Perforation Treatment Performed - Jet Perforation |
1976-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-02-02 | Perforation Treatment Performed - Cement Squeeze |
1976-02-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1976-02-06 | Perforation Treatment Performed - Acid Wash - No Pressure |
1980-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-03-10 | Perforation Treatment Performed - Jet Perforation |
1980-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-03-13 | Perforation Treatment Performed - Fractured |
1980-05-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-05-15 | Perforation Treatment Performed - Jet Perforation |
1989-06-13 | Well Log Performed |
1989-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-06-14 | Plug Back Performed |
1989-06-16 | Perforation Treatment Performed - Jet Perforation |
1989-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-06-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-06-21 | Perforation Treatment Performed - Jet Perforation |
1989-06-21 | Plug Back Performed |
1989-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-06-24 | Well Log Performed |
1989-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-06-25 | Perforation Treatment Performed - Jet Perforation |
1989-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-06-26 | Plug Back Performed |
1989-06-26 | Well Log Performed |
1989-06-27 | Perforation Treatment Performed - Jet Perforation |
1989-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-06-28 | Perforation Treatment Performed - Cement Squeeze |
1989-06-29 | Well Log Performed |
1989-06-30 | Perforation Treatment Performed - Jet Perforation |
1989-07-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-08 | Perforation Treatment Performed - Fractured |
1991-07-25 | Perforation Treatment Performed - Cement Squeeze |
1991-07-25 | Perforation Treatment Performed - Jet Perforation |
1991-07-29 | Perforation Treatment Performed - Jet Perforation |
1991-07-30 | Perforation Treatment Performed - Cement Squeeze |
1991-08-02 | Perforation Treatment Performed - Jet Perforation |
1991-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-02-02 | Perforation Treatment Performed - Cement Squeeze |
1995-02-04 | Well Log Performed |
1995-02-05 | Perforation Treatment Performed - Jet Perforation |
1995-02-07 | Well Log Performed |
1995-02-10 | Well Log Performed |
1995-02-13 | Perforation Treatment Performed - Jet Perforation |
2006-04-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-04-28 | Plug Back Performed |
2006-05-01 | Perforation Treatment Performed - Jet Perforation |
2008-05-22 | Perforation Treatment Performed - Cement Squeeze |
2008-05-26 | Perforation Treatment Performed - Cement Squeeze |
2008-05-26 | Perforation Treatment Performed - Jet Perforation |
2008-05-30 | Perforation Treatment Performed - Fractured |
2008-06-12 | Well Began Production |
2008-06-12 | Well Fluid changed to Gas |
2008-06-12 | Well Mode changed to Flowing |
2011-09-14 | Well Log Performed |
2011-09-16 | Perforation Treatment Performed - Jet Perforation |
2011-09-16 | Well Log Performed |
2011-09-17 | Perforation Treatment Performed - Cement Squeeze |
2013-07-01 | Well Fluid changed to Gas |
2013-07-01 | Well Mode changed to Suspended |
2016-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-08-02 | Plug Back Performed |
2016-08-02 | Well Log Performed |
2016-08-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-08-03 | Plug Back Performed |
2016-08-03 | Well Fluid changed to Gas |
2016-08-03 | Well Mode changed to Abandoned Zone |
2016-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-08-04 | Perforation Treatment Performed - Jet Perforation |
2016-08-04 | Plug Back Performed |
2016-08-04 | Well Log Performed |
2016-08-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-08-05 | Plug Back Performed |
2017-06-01 | Well Log Performed |
2017-06-21 | Perforation Treatment Performed - Cement Plug |
2017-06-21 | Perforation Treatment Performed - Cement Squeeze |
2017-06-21 | Perforation Treatment Performed - Jet Perforation |
2017-06-21 | Plug Back Performed |
2017-06-21 | Well Log Performed |
2017-06-28 | Well Abandoned |
2017-06-28 | Well Fluid changed to Gas |
2017-06-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-11-14 | Perforation | 1625.20 | 1627.90 | 7 |
1976-02-06 | Hydra Jet Perforation | 1623.70 | 1624.30 | 7 |
1976-02-06 | Acid Wash | 1623.70 | 1624.30 | 0 |
1980-03-10 | Packing Device Capped w/Cement | 1598.60 | 1614.60 | 0 |
1980-03-10 | Perforation | 1502.60 | 1511.70 | 6 |
1980-03-12 | Acid Treatment | 1502.60 | 1511.70 | 0 |
1980-03-13 | Fracture | 1502.60 | 1511.70 | 0 |
1980-05-15 | Perforation | 1476.00 | 1489.00 | 6 |
1980-05-15 | Acid Treatment | 1476.00 | 1511.70 | 0 |
1989-06-14 | Packing Device Capped w/Cement | 1457.00 | 1465.20 | 0 |
1989-06-16 | Perforation | 1379.00 | 1388.00 | 13 |
1975-11-18 | Acid Wash | 1625.20 | 1627.90 | 0 |
1989-06-18 | Acid Treatment | 1379.00 | 1388.00 | 0 |
1989-06-21 | Packing Device Capped w/Cement | 1352.00 | 1373.00 | 0 |
1989-06-21 | Perforation | 1304.00 | 1307.00 | 13 |
1989-06-22 | Acid Treatment | 1304.00 | 1307.00 | 0 |
1989-06-25 | Perforation | 1294.00 | 1295.50 | 13 |
1989-06-25 | Acid Treatment | 1294.00 | 1295.50 | 0 |
1989-06-26 | Packing Device Capped w/Cement | 1282.00 | 1290.00 | 0 |
1989-06-27 | Perforation | 1071.00 | 1071.40 | 13 |
1989-06-27 | Perforation | 1080.00 | 1080.40 | 13 |
1989-06-28 | Acid Treatment | 1071.00 | 1080.40 | 0 |
1976-01-15 | Cement Squeeze | 1625.20 | 1627.90 | 0 |
1989-06-28 | Cement Squeeze | 1071.00 | 1080.40 | 0 |
1989-06-30 | Perforation | 1087.00 | 1092.00 | 13 |
1989-06-30 | Perforation | 1101.00 | 1105.00 | 13 |
1989-07-01 | Acid Treatment | 1087.00 | 1105.00 | 0 |
1989-07-08 | Fracture | 1087.00 | 1105.00 | 0 |
1991-07-25 | Perforation | 1294.00 | 1295.50 | 13 |
1991-07-25 | Cement Squeeze | 1294.00 | 1295.50 | 0 |
1991-07-29 | Perforation | 1304.00 | 1307.00 | 13 |
1991-07-30 | Cement Squeeze | 1304.00 | 1307.00 | 0 |
1991-08-02 | Perforation | 1379.00 | 1388.00 | 13 |
1976-01-17 | Perforation | 1626.70 | 1627.90 | 7 |
1991-08-05 | Acid Treatment | 1087.00 | 1105.00 | 0 |
1995-02-02 | Cement Squeeze | 1087.00 | 1092.00 | 0 |
1995-02-05 | Perforation | 1394.50 | 1397.20 | 18 |
1995-02-05 | Perforation | 1405.70 | 1407.60 | 18 |
1995-02-13 | Perforation | 1389.60 | 1389.70 | 18 |
2006-04-28 | Packing Device Capped w/Cement | 1362.70 | 1370.70 | 0 |
2006-05-01 | Perforation | 1101.00 | 1105.00 | 17 |
2006-05-01 | Perforation | 1087.00 | 1092.00 | 17 |
2008-05-22 | Cement Squeeze | 1087.00 | 1092.00 | 0 |
2008-05-26 | Cement Squeeze | 1101.00 | 1105.00 | 0 |
1976-01-19 | Acid Wash | 1626.70 | 1627.90 | 0 |
2008-05-26 | Perforation | 1142.50 | 1146.50 | 17 |
2008-05-30 | Fracture | 1142.50 | 1146.50 | 0 |
2011-09-16 | Perforation | 547.00 | 549.00 | 17 |
2011-09-17 | Cement Squeeze | 547.00 | 549.00 | 0 |
2016-08-02 | Packing Device Capped w/Cement | 1280.80 | 1289.00 | 0 |
2016-08-03 | Packing Device Capped w/Cement | 1126.80 | 1135.00 | 0 |
2016-08-03 | Packing Device Capped w/Cement | 1056.30 | 1064.50 | 0 |
2016-08-04 | Packing Device Capped w/Cement | 530.80 | 539.00 | 0 |
2016-08-04 | Perforation | 366.00 | 367.50 | 15 |
2016-08-05 | Packing Device Capped w/Cement | 348.70 | 362.50 | 0 |
1976-01-20 | Acid Treatment | 1626.70 | 1627.90 | 0 |
2017-06-21 | Perforation | 341.00 | 342.00 | 17 |
2017-06-21 | Cement Squeeze | 341.00 | 342.00 | 0 |
2017-06-21 | Cement Plug | 319.00 | 348.70 | 0 |
1976-01-31 | Perforation | 1631.90 | 1632.50 | 13 |
1976-02-01 | Acid Treatment | 1631.90 | 1632.50 | 0 |
1976-02-02 | Cement Squeeze | 1626.70 | 1632.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 4090 | 0.0 | 0.0 | 0.0 |
2009 | 8143 | 0.0 | 0.0 | 0.0 |
2010 | 7013 | 0.0 | 0.0 | 0.0 |
2011 | 731 | 0.0 | 0.0 | 0.0 |
2012 | 91 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2008-05-21 | No Incident Encountered | 0.00 | 0.00 |
1991-08-04 | No Incident Encountered | 0.00 | 0.00 |
2016-08-06 | No Incident Encountered | 0.00 | 0.00 |
2017-06-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]