X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263013000

Well Details

Well ID: 0494263013000
Loading map...
Location: 00/13-30-049-26W4/0
Location Alias: 00/13-30-49-26 W4M
Location Alias 2: 00/13-30-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 30
County/Municipality: Calmar
Well Name: CIGOL LEDUC 13-30-49-26
Operator Name: Legal Oil & Gas Ltd.
License Number: 0003492
License Date: 1951-09-18
License Status: RecCertified
Spud Date: 1951-12-31
Final Drill Date: 1952-01-29
Well Total Depth: 1606.90 m
Surface Hole Latitude: 53.262658
Surface Hole Longitude: -113.801722

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-09-18 Obtained License
1952-01-28 Drill Stem Test Performed
1952-01-29 Drill Stem Test Performed
1952-01-29 Finished Drilling
1952-01-29 Well Mode changed to Drilled and Cased
1952-01-31 Production Casing Operation Performed
1952-02-05 Perforation Treatment Performed - Bullet Perforation
1952-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-02-20 Well Began Production
1952-02-20 Well Fluid changed to Crude Oil
1952-02-20 Well Mode changed to Flowing
1953-06-01 Well Fluid changed to Crude Oil
1953-06-01 Well Mode changed to Pumping
1966-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-11-10 Well Fluid changed to Crude Oil
1966-11-10 Well Mode changed to Abandoned Zone
1966-11-11 Perforation Treatment Performed - Jet Perforation
1966-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-08-12 Perforation Treatment Performed - Jet Perforation
1967-08-15 Perforation Treatment Performed - Fractured
1972-06-20 Perforation Treatment Performed - Cement Plug
1972-06-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-05 Bullet Perforation 1589.50 1591.70 13
1966-11-11 Perforation 1356.40 1357.00 13
1966-11-15 Acid Treatment 1356.40 1357.00 0
1967-08-12 Packing Device Capped w/Cement 1355.80 1355.80 0
1967-08-12 Perforation 1353.90 1354.50 7
1967-08-15 Fracture 1353.90 1354.50 0
1972-06-20 Cement Plug 1325.90 1356.40 0
1952-02-05 Bullet Perforation 1594.10 1595.90 13
1952-02-05 Bullet Perforation 1597.20 1603.20 13
1952-02-08 Acid Treatment 1589.50 1603.20 0
1952-02-12 Acid Treatment 1589.50 1603.20 0
1952-02-16 Acid Treatment 1597.20 1603.20 0
1952-02-18 Acid Treatment 1597.20 1603.20 0
1952-02-20 Acid Treatment 1597.20 1603.20 0
1966-11-10 Packing Device Capped w/Cement 1578.90 1578.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References