If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494263114002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.277672,"lon":-113.796252,"icon":""}]} |
Location: 00/14-31-049-26W4/2 | |
Location Alias: 00/14-31-49-26 W4M | |
Location Alias 2: 00/14-31-049-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 26 | |
Section: 31 | |
County/Municipality: Leduc County | |
Well Name: CALMAR WEST NO. 2 WELL | |
Operator Name: Canadian Quantum Energy Corporation | |
License Number: 0000453 | |
License Date: 1949-08-09 | |
License Status: RecExempt | |
Spud Date: 1949-08-15 | |
Final Drill Date: 1953-08-08 | |
Well Total Depth: 1652.00 m | |
Surface Hole Latitude: 53.277672 | |
Surface Hole Longitude: -113.796252 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-08-09 | Obtained License |
1949-09-10 | Drill Stem Test Performed |
1949-09-16 | Perforation Treatment Performed - Bullet Perforation |
1949-09-17 | Perforation Treatment Performed - Acid Wash - No Pressure |
1949-09-20 | Perforation Treatment Performed - Acid Wash - No Pressure |
1949-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-09-22 | Perforation Treatment Performed - Acid Wash - No Pressure |
1949-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-09-24 | Perforation Treatment Performed - Acid Wash - No Pressure |
1953-08-01 | Drill Stem Test Performed |
1953-08-05 | Drill Stem Test Performed |
1953-08-06 | Drill Stem Test Performed |
1953-08-08 | Finished Drilling |
1953-08-08 | Well Mode changed to Drilled and Cased |
1953-08-11 | Perforation Treatment Performed - Selective Bullet Perforations |
1953-10-05 | Perforation Treatment Performed - Cement Squeeze |
1953-10-14 | Perforation Treatment Performed - Selective Jet Perforations |
1953-10-18 | Perforation Treatment Performed - Cement Squeeze |
1953-10-22 | Perforation Treatment Performed - Selective Bullet Perforations |
1953-10-22 | Perforation Treatment Performed - Selective Jet Perforations |
1953-10-27 | Perforation Treatment Performed - Cement Squeeze |
1953-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-11-01 | Perforation Treatment Performed - Selective Jet Perforations |
1953-11-03 | Well Fluid changed to Crude Oil |
1953-11-03 | Well Mode changed to Potential |
1953-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1953-11-04 | Well Fluid changed to Crude Oil |
1953-11-04 | Well Mode changed to Abandoned Zone |
1953-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-11-05 | Perforation Treatment Performed - Jet Perforation |
1958-06-06 | Perforation Treatment Performed - Cement Plug |
1958-06-12 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-09-16 | Bullet Perforation | 1572.80 | 1579.80 | 13 |
1953-10-05 | Cement Squeeze | 1649.00 | 1649.00 | 0 |
1953-10-14 | Selective Jet Perforations | 1649.00 | 1649.00 | 0 |
1953-10-18 | Cement Squeeze | 1649.00 | 1649.00 | 0 |
1953-10-22 | Selective Jet Perforations | 1649.00 | 1649.00 | 0 |
1953-10-22 | Selective Bullet Perforations | 1649.00 | 1649.00 | 0 |
1953-10-27 | Cement Squeeze | 1649.00 | 1649.00 | 0 |
1953-11-01 | Selective Jet Perforations | 1649.30 | 1649.30 | 0 |
1953-11-01 | Acid Treatment | 1649.30 | 1649.30 | 0 |
1953-11-04 | Packing Device Capped w/Cement | 1615.40 | 1630.70 | 0 |
1953-11-05 | Perforation | 1591.10 | 1594.10 | 13 |
1949-09-16 | Bullet Perforation | 1581.30 | 1582.20 | 13 |
1953-11-05 | Perforation | 1588.90 | 1590.40 | 13 |
1953-11-05 | Acid Treatment | 1588.90 | 1594.10 | 0 |
1958-06-06 | Cement Plug | 1554.50 | 1615.40 | 0 |
1949-09-17 | Acid Wash | 1572.80 | 1582.20 | 0 |
1949-09-20 | Acid Wash | 1572.80 | 1582.20 | 0 |
1949-09-22 | Acid Wash | 1572.80 | 1582.20 | 0 |
1949-09-22 | Acid Treatment | 1572.80 | 1582.20 | 0 |
1949-09-24 | Acid Wash | 1572.80 | 1582.20 | 0 |
1949-09-24 | Acid Treatment | 1572.80 | 1582.20 | 0 |
1953-08-11 | Selective Bullet Perforations | 1649.00 | 1649.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]