X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263305000

Well Details

Well ID: 0494263305000
Loading map...
Location: 00/05-33-049-26W4/0
Location Alias: 00/05-33-49-26 W4M
Location Alias 2: 00/05-33-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 33
County/Municipality: Leduc County
Well Name: HESC LEDUC-WB 5-33-49-26
Operator Name: HESC Energy Corporation
License Number: 0001379
License Date: 1950-04-21
License Status: Issued
Spud Date: 1950-08-09
Final Drill Date: 1950-09-18
Well Total Depth: 1654.10 m
Surface Hole Latitude: 53.270974
Surface Hole Longitude: -113.752547

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-04-21 Obtained License
1950-09-06 Drill Stem Test Performed
1950-09-07 Drill Stem Test Performed
1950-09-11 Liner Casing Operation Performed
1950-09-16 Drill Stem Test Performed
1950-09-17 Drill Stem Test Performed
1950-09-18 Finished Drilling
1950-09-18 Well Mode changed to Drilled and Cased
1950-09-21 Perforation Treatment Performed - Acid Wash - No Pressure
1950-09-21 Perforation Treatment Performed - Bullet Perforation
1950-09-22 Well Began Production
1950-09-22 Well Fluid changed to Crude Oil
1950-09-22 Well Mode changed to Flowing
1957-08-03 Well Fluid changed to Crude Oil
1957-08-03 Well Mode changed to Pumping
1968-05-17 Perforation Treatment Performed - Cement Plug
1968-05-21 Perforation Treatment Performed - Acid Wash - No Pressure
1968-05-21 Perforation Treatment Performed - Jet Perforation
1972-05-01 Well Fluid changed to Crude Oil
1972-05-01 Well Mode changed to Suspended
1981-04-08 Perforation Treatment Performed - Cement Plug
1981-04-10 Perforation Treatment Performed - Jet Perforation
1981-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-16 Well Fluid changed to Crude Oil
1981-04-16 Well Mode changed to Pumping
1984-05-01 Well Fluid changed to Crude Oil
1984-05-01 Well Mode changed to Suspended
1992-06-17 Perforation Treatment Performed - Cement Squeeze
1992-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-18 Perforation Treatment Performed - Jet Perforation
1992-07-02 Well Fluid changed to Crude Oil
1992-07-02 Well Mode changed to Pumping
1995-09-04 Perforation Treatment Performed - Jet Perforation
1995-09-05 Perforation Treatment Performed - Remedial Casing
1995-09-14 Well Fluid changed to Crude Oil
1995-09-14 Well Mode changed to Suspended
1997-11-29 Perforation Treatment Performed - Remedial Casing
1997-11-30 Perforation Treatment Performed - Jet Perforation
1997-12-05 Well Fluid changed to Crude Oil
1997-12-05 Well Mode changed to Pumping
1998-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-01 Well Fluid changed to Crude Oil
2011-09-01 Well Mode changed to Suspended
2012-01-23 Well Fluid changed to Crude Oil
2012-01-23 Well Mode changed to Pumping
2012-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-01 Well Fluid changed to Crude Oil
2013-03-01 Well Mode changed to Suspended
2017-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-09-11 Plug Back Performed
2017-09-11 Well Fluid changed to Crude Oil
2017-09-11 Well Mode changed to Abandoned Zone
2017-09-12 Perforation Treatment Performed - Jet Perforation
2017-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-21 Bullet Perforation 1651.70 1652.60 13
1992-06-17 Cement Squeeze 1646.50 1646.60 0
1992-06-18 Perforation 1642.70 1643.20 13
1992-06-18 Acid Treatment 1642.70 1643.20 0
1995-09-04 Perforation 1640.00 1640.30 13
1995-09-05 Remedial Casing Cementing 1642.70 1652.60 0
1997-11-29 Remedial Casing Cementing 1640.00 1640.30 0
1997-11-30 Perforation 1634.00 1635.50 13
1998-02-08 Acid Treatment 1634.00 1635.50 0
2012-02-23 Acid Treatment 1634.00 1635.50 0
2017-09-11 Packing Device Capped w/Cement 1619.00 1627.00 0
1950-09-21 Acid Wash 1651.70 1652.60 0
2017-09-12 Perforation 1427.50 1431.00 20
2017-09-13 Acid Treatment 1427.50 1431.00 0
1950-09-21 Bullet Perforation 1651.70 1652.60 7
1968-05-17 Cement Plug 1651.40 1652.60 0
1968-05-21 Perforation 1648.70 1649.30 13
1968-05-21 Acid Wash 1648.70 1649.30 0
1981-04-08 Cement Plug 1647.50 1651.40 0
1981-04-10 Perforation 1646.50 1646.60 7
1981-04-13 Acid Treatment 1646.50 1646.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7863 0.0 0.0 0.0
1968 7389 0.0 0.0 0.0
1969 6695 0.0 0.0 0.0
1970 8564 0.0 0.0 0.0
1971 8639 0.0 0.0 0.0
1972 888 0.0 0.0 0.0
1981 5056 0.0 0.0 0.0
1992 3837 0.0 0.0 0.0
1993 8430 0.0 0.0 0.0
1994 7770 0.0 0.0 0.0
1995 553 0.0 0.0 0.0
1997 330 0.0 0.0 0.0
1998 7912 0.0 0.0 0.0
1999 7877 0.0 0.0 0.0
2000 8619 0.0 0.0 0.0
2001 7880 0.0 0.0 0.0
2002 8419 0.0 0.0 0.0
2003 8694 0.0 0.0 0.0
2004 8418 0.0 0.0 0.0
2005 8557 0.0 0.0 0.0
2006 8126 0.0 0.0 0.0
2007 8432 0.0 0.0 0.0
2008 8654 0.0 0.0 0.0
2009 8375 0.0 0.0 0.0
2012 8152 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-11-29 No Incident Encountered 0.00 0.00
2017-09-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References