X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263410000

Well Details

Well ID: 0494263410000
Loading map...
Location: 00/10-34-049-26W4/0
Location Alias: 00/10-34-49-26 W4M
Location Alias 2: 00/10-34-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 34
County/Municipality: Leduc County
Well Name: MCCONSET-LEDUC NO. 5
Operator Name: Canadian Natural Resources Limited
License Number: 0012312
License Date: 1956-10-11
License Status: Abandoned
Spud Date: 1950-05-07
Final Drill Date: 1950-06-08
Well Total Depth: 1648.70 m
Surface Hole Latitude: 53.274603
Surface Hole Longitude: -113.716189

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-05-31 Drill Stem Test Performed
1950-06-01 Drill Stem Test Performed
1950-06-05 Liner Casing Operation Performed
1950-06-08 Finished Drilling
1950-06-08 Well Mode changed to Drilled and Cased
1950-06-14 Perforation Treatment Performed - Jet Perforation
1950-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-06-15 Well Began Production
1950-06-15 Well Fluid changed to Crude Oil
1950-06-15 Well Mode changed to Flowing
1956-10-11 Obtained License
1972-07-17 Well Fluid changed to Crude Oil
1972-07-17 Well Mode changed to Pumping
1982-08-05 Perforation Treatment Performed - Cement Squeeze
1982-08-10 Perforation Treatment Performed - Selective Jet Perforations
1982-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-17 Perforation Treatment Performed - Cement Squeeze
1982-08-19 Perforation Treatment Performed - Selective Jet Perforations
1982-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-01 Well Fluid changed to Crude Oil
1984-05-01 Well Mode changed to Suspended
1985-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-03 Perforation Treatment Performed - Cement Squeeze
1985-10-03 Well Log Performed
1985-10-07 Perforation Treatment Performed - Jet Perforation
1985-10-07 Well Log Performed
1985-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-10 Perforation Treatment Performed - Cement Squeeze
1985-10-10 Well Fluid changed to Crude Oil
1985-10-10 Well Mode changed to Abandoned
1985-10-17 Well Log Performed
1985-10-18 Well Log Performed
1985-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-22 Perforation Treatment Performed - Jet Perforation
1985-10-22 Well Log Performed
1985-10-23 Perforation Treatment Performed - Remedial Casing
1985-10-23 Well Log Performed
1985-10-24 Perforation Treatment Performed - Jet Perforation
1985-10-24 Perforation Treatment Performed - Remedial Casing
1985-10-24 Well Log Performed
1985-10-28 Perforation Treatment Performed - Jet Perforation
1985-10-28 Perforation Treatment Performed - Remedial Casing
1985-10-28 Well Log Performed
1992-07-10 Perforation Treatment Performed - Jet Perforation
1992-07-10 Well Log Performed
1992-07-23 Perforation Treatment Performed - Remedial Casing
1992-08-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-06-14 Perforation 1647.10 1648.40 13
1985-10-03 Acid Treatment 1645.50 1645.60 0
1985-10-03 Cement Squeeze 1645.50 1645.60 0
1985-10-07 Perforation 1643.60 1643.80 13
1985-10-08 Acid Treatment 1643.60 1643.80 0
1985-10-10 Cement Squeeze 1643.60 1643.80 0
1985-10-22 Perforation 1172.00 1172.20 13
1985-10-22 Acid Treatment 1172.00 1172.20 0
1985-10-23 Remedial Casing Cementing 1172.00 1172.20 0
1985-10-24 Perforation 800.00 800.40 13
1985-10-24 Remedial Casing Cementing 800.00 800.40 0
1950-06-15 Acid Treatment 1647.10 1648.40 0
1985-10-28 Perforation 299.00 299.50 13
1985-10-28 Remedial Casing Cementing 299.00 299.50 0
1992-07-10 Perforation 200.00 200.50 13
1992-07-23 Remedial Casing Cementing 200.00 200.50 0
1982-08-05 Cement Squeeze 1647.10 1648.40 0
1982-08-10 Selective Jet Perforations 1646.20 1646.40 0
1982-08-11 Acid Treatment 1646.20 1646.40 0
1982-08-16 Acid Treatment 1646.20 1646.40 0
1982-08-17 Cement Squeeze 1646.20 1646.40 0
1982-08-19 Selective Jet Perforations 1645.50 1645.60 0
1982-08-20 Acid Treatment 1645.50 1645.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7331 0.0 0.0 0.0
1971 1152 0.0 0.0 0.0
1972 3468 0.0 0.0 0.0
1973 8309 0.0 0.0 0.0
1974 8057 0.0 0.0 0.0
1975 2760 0.0 0.0 0.0
1982 308 0.0 0.0 0.0

For data sources see[5]

References