X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263512003

Well Details

Well ID: 0494263512003
Loading map...
Location: 00/12-35-049-26W4/3
Location Alias: 00/12-35-49-26 W4M
Location Alias 2: 00/12-35-049-26 W4/03
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 35
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 12-35-49-26
Operator Name: NEP Canada ULC
License Number: 0001681
License Date: 1950-06-29
License Status: Suspension
Spud Date: 1950-07-21
Final Drill Date: 1950-08-19
Well Total Depth: 1645.90 m
Surface Hole Latitude: 53.274087
Surface Hole Longitude: -113.704734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-29 Obtained License
1950-08-10 Drill Stem Test Performed
1950-08-11 Drill Stem Test Performed
1950-08-14 Liner Casing Operation Performed
1950-08-19 Finished Drilling
1950-08-19 Well Mode changed to Drilled and Cased
1950-08-23 Perforation Treatment Performed - Acid Wash - No Pressure
1950-08-23 Perforation Treatment Performed - Jet Perforation
1963-10-28 Perforation Treatment Performed - Cement Squeeze
1963-10-30 Perforation Treatment Performed - Jet Perforation
1963-10-30 Perforation Treatment Performed - Selective Jet Perforations
1963-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1964-01-10 Perforation Treatment Performed - Acid Wash - No Pressure
1973-04-17 Perforation Treatment Performed - Acid Wash - No Pressure
1982-07-06 Perforation Treatment Performed - Selective Jet Perforations
1982-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-04 Perforation Treatment Performed - Cement Squeeze
1988-03-04 Well Log Performed
1988-03-09 Perforation Treatment Performed - Cement Squeeze
1988-03-09 Well Log Performed
1988-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-11 Perforation Treatment Performed - Jet Perforation
1988-03-11 Well Log Performed
1992-07-15 Well Log Performed
1995-07-12 Perforation Treatment Performed - Cement Squeeze
1995-07-14 Perforation Treatment Performed - Jet Perforation
1995-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-05 Perforation Treatment Performed - Jet Perforation
1996-09-05 Plug Back Performed
1996-09-06 Perforation Treatment Performed - Jet Perforation
1998-05-07 Well Log Performed
1998-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-08 Perforation Treatment Performed - Jet Perforation
1998-05-08 Plug Back Performed
1998-05-08 Well Log Performed
1998-05-29 Perforation Treatment Performed - Fractured
1998-06-13 Well Began Production
1998-06-13 Well Fluid changed to Crude Oil
1998-06-13 Well Mode changed to Pumping
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-23 Perforation 1644.70 1645.60 13
1982-07-07 Acid Treatment 1642.10 1642.30 0
1988-03-04 Cement Squeeze 1636.80 1636.80 0
1988-03-09 Cement Squeeze 1642.10 1643.50 0
1988-03-11 Perforation 1637.00 1637.50 13
1988-03-11 Acid Treatment 1637.00 1637.50 0
1995-07-12 Cement Squeeze 1637.00 1637.50 0
1995-07-14 Perforation 1634.10 1634.40 13
1995-07-15 Acid Treatment 1634.10 1634.40 0
1996-09-05 Packing Device Capped w/Cement 1596.00 1604.00 0
1996-09-05 Perforation 1560.50 1564.30 13
1950-08-23 Acid Wash 1644.70 1645.60 0
1996-09-05 Perforation 1565.30 1570.00 13
1996-09-05 Perforation 1571.00 1575.30 13
1996-09-06 Perforation 1560.50 1575.30 13
1998-05-08 Packing Device Capped w/Cement 1524.00 1532.00 0
1998-05-08 Perforation 1217.00 1224.00 13
1998-05-29 Fracture 1217.00 1224.00 0
1963-10-28 Cement Squeeze 1643.80 1645.60 0
1963-10-30 Perforation 1642.90 1643.50 13
1963-10-30 Selective Jet Perforations 1636.80 1636.80 0
1963-11-03 Acid Wash 1636.80 1636.80 0
1964-01-10 Acid Wash 1642.90 1643.50 0
1973-04-17 Acid Wash 1642.90 1643.50 0
1982-07-06 Selective Jet Perforations 1642.10 1642.30 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-10 No Incident Encountered 0.00 0.00

For data sources see[5]

References