X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494270203000

Well Details

Well ID: 0494270203000
Loading map...
Location: 00/03-02-049-27W4/0
Location Alias: 00/03-02-49-27 W4M
Location Alias 2: 00/03-02-049-27 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 27
Section: 02
County/Municipality: Leduc County
Well Name: CLEARBROOK GLENPK 3-2-49-27
Operator Name: Enhance Energy Inc.
License Number: 0003770
License Date: 1951-11-13
License Status: Amended
Spud Date: 1951-11-16
Final Drill Date: 1952-01-02
Well Total Depth: 1837.30 m
Surface Hole Latitude: 53.194250
Surface Hole Longitude: -113.844910

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-13 Obtained License
1951-12-13 Drill Stem Test Performed
1951-12-15 Drill Stem Test Performed
1951-12-18 Drill Stem Test Performed
1951-12-21 Drill Stem Test Performed
1951-12-22 Drill Stem Test Performed
1951-12-27 Drill Stem Test Performed
1951-12-29 Production Casing Operation Performed
1952-01-02 Finished Drilling
1952-01-02 Perforation Treatment Performed - Open-Hole Completion
1952-01-02 Well Mode changed to Drilled and Cased
1952-01-04 Well Began Production
1952-01-04 Well Fluid changed to Crude Oil
1952-01-04 Well Mode changed to Flowing
1978-03-14 Well Log Performed
1985-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-31 Perforation Treatment Performed - Cement Plug
1986-01-31 Perforation Treatment Performed - Open-Hole Completion
1993-05-06 Well Fluid changed to Crude Oil
1993-05-06 Well Mode changed to Pumping
2001-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-19 Plug Back Performed
2001-08-19 Well Fluid changed to Crude Oil
2001-08-19 Well Log Performed
2001-08-19 Well Mode changed to Abandoned and Whipstocked
2001-09-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-02 Open Hole/Barefoot Completion 1813.30 1837.30 0
1985-06-11 Acid Treatment 1813.30 1821.00 0
1986-01-31 Cement Plug 1814.50 1821.00 0
1986-01-31 Open Hole/Barefoot Completion 1813.30 1814.50 0
2001-08-19 Packing Device Capped w/Cement 1792.00 1800.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4035 0.0 0.0 0.0
1968 5062 0.0 0.0 0.0
1969 2219 0.0 0.0 0.0
1970 4762 0.0 0.0 0.0
1971 4243 0.0 0.0 0.0
1972 6485 0.0 0.0 0.0
1973 8170 0.0 0.0 0.0
1974 6657 0.0 0.0 0.0
1975 5336 0.0 0.0 0.0
1976 6076 0.0 0.0 0.0
1977 6369 0.0 0.0 0.0
1978 6993 0.0 0.0 0.0
1979 8279 0.0 0.0 0.0
1980 8441 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8526 0.0 0.0 0.0
1983 8457 0.0 0.0 0.0
1984 8366 0.0 0.0 0.0
1985 8608 0.0 0.0 0.0
1986 7931 0.0 0.0 0.0
1987 8723 0.0 0.0 0.0
1988 8689 0.0 0.0 0.0
1989 8687 0.0 0.0 0.0
1990 8577 0.0 0.0 0.0
1991 8132 0.0 0.0 0.0
1992 8349 0.0 0.0 0.0
1993 8613 0.0 0.0 0.0
1994 8224 0.0 0.0 0.0
1995 8506 0.0 0.0 0.0
1996 8182 0.0 0.0 0.0
1997 8609 0.0 0.0 0.0
1998 6728 0.0 0.0 0.0
1999 8365 0.0 0.0 0.0
2000 8668 0.0 0.0 0.0
2001 2244 0.0 0.0 0.0

For data sources see[5]

References