If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495022007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.240785,"lon":-114.254037,"icon":""}]} |
Location: 00/07-20-049-02W5/0 | |
Location Alias: 00/07-20-49-02 W5M | |
Location Alias 2: 00/07-20-049-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 02 | |
Section: 20 | |
County/Municipality: Leduc County | |
Well Name: SUNCOR THORSBY 7-20-49-2 | |
Operator Name: Saba Energy Inc. | |
License Number: 0085014 | |
License Date: 1980-08-18 | |
License Status: RecCertified | |
Spud Date: 1980-09-30 | |
Final Drill Date: 1980-10-12 | |
Well Total Depth: 1600.00 m | |
Surface Hole Latitude: 53.240785 | |
Surface Hole Longitude: -114.254037 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-18 | Obtained License |
1980-10-12 | Finished Drilling |
1980-10-12 | Well Mode changed to Drilled and Cased |
1980-10-13 | Well Log Performed |
1980-10-15 | Production Casing Operation Performed |
1980-11-21 | Perforation Treatment Performed - Jet Perforation |
1980-11-27 | Perforation Treatment Performed - Jet Perforation |
1980-12-10 | Well Began Production |
1980-12-10 | Well Fluid changed to Crude Oil |
1980-12-10 | Well Mode changed to Flowing |
1981-06-19 | Perforation Treatment Performed - Cement Squeeze |
1981-06-24 | Perforation Treatment Performed - Jet Perforation |
1981-10-14 | Well Fluid changed to Crude Oil |
1981-10-14 | Well Mode changed to Suspended |
1988-06-15 | Well Log Performed |
1988-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-06-16 | Plug Back Performed |
1988-06-16 | Well Fluid changed to Crude Oil |
1988-06-16 | Well Mode changed to Abandoned |
1988-06-17 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-11-21 | Perforation | 1546.50 | 1550.70 | 13 |
1980-11-27 | Perforation | 1547.00 | 1548.50 | 13 |
1981-06-19 | Cement Squeeze | 1546.50 | 1550.70 | 0 |
1981-06-24 | Perforation | 1548.00 | 1548.50 | 12 |
1988-06-16 | Packing Device Capped w/Cement | 1522.00 | 1530.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 220 | 0.0 | 0.0 | 0.0 |
1981 | 663 | 0.0 | 0.0 | 0.0 |
For data sources see[5]