X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495030806000

Well Details

Well ID: 0495030806000
Loading map...
Location: 00/06-08-049-03W5/0
Location Alias: 00/06-08-49-03 W5M
Location Alias 2: 00/06-08-049-03 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 03
Section: 08
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 6-8-49-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0076102
License Date: 1979-06-04
License Status: Issued
Spud Date: 1979-06-07
Final Drill Date: 1979-06-17
Well Total Depth: 1700.00 m
Surface Hole Latitude: 53.210684
Surface Hole Longitude: -114.409730

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-04 Obtained License
1979-06-17 Finished Drilling
1979-06-17 Well Log Performed
1979-06-17 Well Mode changed to Drilled and Cased
1979-06-19 Production Casing Operation Performed
1979-08-07 Perforation Treatment Performed - Jet Perforation
1979-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-14 Perforation Treatment Performed - Jet Perforation
1979-08-17 Perforation Treatment Performed - Jet Perforation
1979-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-23 Perforation Treatment Performed - Jet Perforation
1979-08-25 Perforation Treatment Performed - Fractured
1979-08-30 Well Began Production
1979-08-30 Well Fluid changed to Crude Oil
1979-08-30 Well Mode changed to Flowing
1997-06-16 Well Fluid changed to Crude Oil
1997-06-16 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-07 Perforation 1656.50 1658.00 7
1979-08-09 Acid Treatment 1656.50 1658.00 0
1979-08-13 Packing Device Capped w/Cement 1650.00 1650.00 0
1979-08-14 Perforation 1474.00 1478.00 7
1979-08-17 Perforation 1470.00 1471.50 7
1979-08-20 Acid Treatment 1470.00 1478.00 0
1979-08-22 Packing Device Capped w/Cement 1465.00 1465.00 0
1979-08-23 Perforation 1170.00 1171.50 13
1979-08-25 Fracture 1170.00 1171.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1928 0.0 0.0 0.0
1980 8701 0.0 0.0 0.0
1981 8756 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 8547 0.0 0.0 0.0
1984 8651 0.0 0.0 0.0
1985 8609 0.0 0.0 0.0
1986 8207 0.0 0.0 0.0
1987 8563 0.0 0.0 0.0
1988 8592 0.0 0.0 0.0
1989 8561 0.0 0.0 0.0
1990 8663 0.0 0.0 0.0
1991 8567 0.0 0.0 0.0
1992 8579 0.0 0.0 0.0
1993 8231 0.0 0.0 0.0
1994 6288 0.0 0.0 0.0
1995 6335 0.0 0.0 0.0
1996 8471 0.0 0.0 0.0
1997 8615 0.0 0.0 0.0
1998 8189 0.0 0.0 0.0
1999 7080 0.0 0.0 0.0
2000 8387 0.0 0.0 0.0
2001 8507 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8712 0.0 0.0 0.0
2004 8635 0.0 0.0 0.0
2005 8346 0.0 0.0 0.0
2006 8423 0.0 0.0 0.0
2007 8560 0.0 0.0 0.0
2008 8307 0.0 0.0 0.0
2009 8495 0.0 0.0 0.0
2010 8135 0.0 0.0 0.0
2011 8301 0.0 0.0 0.0
2012 8596 0.0 0.0 0.0
2013 8515 0.0 0.0 0.0
2014 7002 0.0 0.0 0.0
2015 8369 0.0 0.0 0.0
2016 8672 0.0 0.0 0.0
2017 8695 0.0 0.0 0.0
2018 8734 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References