If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495032911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.261263,"lon":-114.409404,"icon":""}]} |
Location: 00/11-29-049-03W5/0 | |
Location Alias: 00/11-29-49-03 W5M | |
Location Alias 2: 00/11-29-049-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 03 | |
Section: 29 | |
County/Municipality: Leduc County | |
Well Name: JOURNEY PEMBINA 11-29-49-3 | |
Operator Name: Journey Energy Inc. | |
License Number: 0080205 | |
License Date: 1980-01-03 | |
License Status: Abandoned | |
Spud Date: 1979-12-28 | |
Final Drill Date: 1980-01-12 | |
Well Total Depth: 1705.00 m | |
Surface Hole Latitude: 53.261263 | |
Surface Hole Longitude: -114.409404 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-01-01 | Drill Stem Test Performed |
1980-01-02 | Drill Stem Test Performed |
1980-01-03 | Obtained License |
1980-01-12 | Finished Drilling |
1980-01-12 | Well Mode changed to Drilled and Cased |
1980-02-14 | Perforation Treatment Performed - Jet Perforation |
1980-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-20 | Perforation Treatment Performed - Jet Perforation |
1980-02-22 | Perforation Treatment Performed - Jet Perforation |
1980-02-23 | Well Began Production |
1980-02-23 | Well Fluid changed to Crude Oil |
1980-02-23 | Well Mode changed to Flowing |
1984-12-28 | Well Log Performed |
1985-01-02 | Well Log Performed |
1985-01-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-01-03 | Perforation Treatment Performed - Jet Perforation |
1985-01-03 | Plug Back Performed |
1985-01-03 | Well Fluid changed to Crude Oil |
1985-01-03 | Well Mode changed to Abandoned Zone |
1985-01-05 | Perforation Treatment Performed - Fractured |
1985-01-05 | Well Log Performed |
1985-10-19 | Well Log Performed |
1990-02-27 | Perforation Treatment Performed - Jet Perforation |
1990-02-28 | Well Log Performed |
1990-03-01 | Perforation Treatment Performed - Cement Squeeze |
1990-03-01 | Plug Back Performed |
1990-03-06 | Perforation Treatment Performed - Cement Plug |
1990-03-06 | Plug Back Performed |
1990-03-06 | Well Abandoned |
1990-03-07 | Well Log Performed |
1990-03-08 | Perforation Treatment Performed - Jet Perforation |
1990-03-08 | Perforation Treatment Performed - Remedial Casing |
1990-03-08 | Well Log Performed |
1990-03-09 | Perforation Treatment Performed - Jet Perforation |
1990-03-09 | Well Log Performed |
1990-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-02-14 | Perforation | 1639.50 | 1642.50 | 7 |
1990-03-06 | Cement Plug | 1592.00 | 1635.00 | 0 |
1990-03-08 | Perforation | 644.00 | 646.40 | 13 |
1990-03-08 | Remedial Casing Cementing | 644.00 | 646.40 | 0 |
1990-03-09 | Perforation | 302.00 | 303.00 | 13 |
1990-03-15 | Packing Device Capped w/Cement | 320.00 | 320.00 | 0 |
1980-02-19 | Packing Device Capped w/Cement | 1635.00 | 1638.00 | 0 |
1980-02-20 | Perforation | 1619.00 | 1621.00 | 7 |
1980-02-22 | Perforation | 1627.00 | 1630.00 | 7 |
1985-01-03 | Packing Device Capped w/Cement | 1623.00 | 1626.00 | 0 |
1985-01-03 | Perforation | 1619.00 | 1621.50 | 12 |
1985-01-05 | Fracture | 1619.00 | 1621.50 | 0 |
1990-02-27 | Perforation | 1627.00 | 1630.00 | 7 |
1990-03-01 | Cement Squeeze | 1619.00 | 1630.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 703 | 0.0 | 0.0 | 0.0 |
1981 | 344 | 0.0 | 0.0 | 0.0 |
1982 | 1487 | 0.0 | 0.0 | 0.0 |
1983 | 1621 | 0.0 | 0.0 | 0.0 |
For data sources see[5]