X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495050105020

Well Details

Well ID: 0495050105020
Loading map...
Location: 02/05-01-049-05W5/0
Location Alias: 02/05-01-49-05 W5M
Location Alias 2: 02/05-01-049-05 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 05
Section: 01
County/Municipality: Brazeau County
Well Name: JOURNEY HZ PEMBINA 5-1-49-5
Operator Name: Journey Energy Inc.
License Number: 0453078
License Date: 2013-01-03
License Status: Issued
Spud Date: 2013-01-31
Final Drill Date: 2013-02-07
Well Total Depth: 2826.00 m
Surface Hole Latitude: 53.196181
Surface Hole Longitude: -114.585564

For data sources see[1][2]

Well History

Date Event
2013-01-03 Obtained License
2013-02-02 Surface Casing Operation Performed
2013-02-03 Direction Drilling Operation Performed - Deviate
2013-02-04 Direction Drilling Operation Performed - Horizontal
2013-02-07 Finished Drilling
2013-02-07 Well Log Performed
2013-02-07 Well Mode changed to Drilled and Cased
2013-02-09 Production Casing Operation Performed
2013-02-09 Rig Released
2013-02-15 Perforation Treatment Performed - Open-Hole Completion
2013-02-17 Well Log Performed
2013-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-20 Well Began Production
2013-02-20 Well Fluid changed to Crude Oil
2013-02-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-31 Quintera Drilling Ltd. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-03 910.30 Deviate (5 - 79 degrees)
2013-02-04 1441.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-15 Open Hole/Barefoot Completion 2782.00 2826.00 0
2013-02-20 Multi-Stage Fracture 2175.70 2176.50 0
2013-02-20 Multi-Stage Fracture 2101.60 2102.40 0
2013-02-20 Multi-Stage Fracture 2027.70 2028.50 0
2013-02-20 Multi-Stage Fracture 1953.60 1954.40 0
2013-02-20 Multi-Stage Fracture 1879.60 1880.40 0
2013-02-20 Multi-Stage Fracture 1805.60 1806.40 0
2013-02-20 Multi-Stage Fracture 1731.60 1732.40 0
2013-02-20 Multi-Stage Fracture 1657.50 1658.30 0
2013-02-20 Multi-Stage Fracture 1583.50 1584.30 0
2013-02-20 Multi-Stage Fracture 1509.40 1510.20 0
2013-02-19 Multi-Stage Fracture 2756.80 2758.10 0
2013-02-19 Multi-Stage Fracture 2693.90 2694.70 0
2013-02-19 Multi-Stage Fracture 2619.80 2620.60 0
2013-02-19 Multi-Stage Fracture 2545.80 2546.60 0
2013-02-20 Multi-Stage Fracture 2471.80 2472.60 0
2013-02-20 Multi-Stage Fracture 2397.70 2398.50 0
2013-02-20 Multi-Stage Fracture 2323.70 2324.50 0
2013-02-20 Multi-Stage Fracture 2249.70 2250.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-19 2013-02-20 1,283 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 42.1091 N/A
ClearFRAC XT Schlumberger Crystalline silica 14808-60-7 100 30.6003 N/A
ClearFRAC XT Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.0085 N/A
Acetic acid ethenyl ester. polymer with ethenol 25213-24-5 100 0.0018 N/A
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer 25704-18-1 100 0.0191 N/A
Butan-1-ol 71-36-3 100 0.0034 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2118 N/A
Ethane-1.2-diol 107-21-1 100 0 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.0029 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.0133 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen. liquid form 7727-37-9 100 26.8161 N/A
Polyvinyl acetate. partially hydrolyzed 304443-60-5 100 0.0006 N/A
Propan-2-ol 67-63-0 100 0.1652 N/A
Sodium chloride 7647-14-5 100 0.029 N/A
Sodium chloroacetate 3926-62-3 100 0.0027 N/A
Tetramethylammonium chloride 75-57-0 100 0.042 N/A
Undecanol. branched and linear (impurity) 128973-77-3 100 0.0008 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.008 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-16 2013-02-20 Central Water Distribution Facility 522

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7245 0.0 0.0 0.0
2014 8487 0.0 0.0 0.0
2015 8605 0.0 0.0 0.0
2016 8618 0.0 0.0 0.0
2017 7747 0.0 0.0 0.0
2018 5452 0.0 0.0 0.0
2019 5835 0.0 0.0 0.0
2020 1959 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References