X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495060310000

Well Details

Well ID: 0495060310000
Loading map...
Location: 00/10-03-049-06W5/0
Location Alias: 00/10-03-49-06 W5M
Location Alias 2: 00/10-03-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 03
County/Municipality: Brazeau County
Well Name: PW GAS PEM 10-3-49-6
Operator Name: TAQA North Ltd.
License Number: 0253082
License Date: 2001-03-21
License Status: Abandoned
Spud Date: 2001-07-07
Final Drill Date: 2001-07-14
Well Total Depth: 1885.00 m
Surface Hole Latitude: 53.200194
Surface Hole Longitude: -114.789375

For data sources see[1][2]

Well History

Date Event
2001-03-21 Obtained License
2001-07-09 Surface Casing Operation Performed
2001-07-11 Well Log Performed
2001-07-14 Finished Drilling
2001-07-15 Production Casing Operation Performed
2001-07-15 Well Log Performed
2001-07-16 Rig Released
2001-07-16 Well Mode changed to Drilled and Cased
2001-08-16 Well Log Performed
2001-08-17 Perforation Treatment Performed - Jet Perforation
2001-08-17 Well Log Performed
2001-08-19 Perforation Treatment Performed - Fractured
2001-08-22 Well Log Performed
2001-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-13 Plug Back Performed
2001-12-13 Well Log Performed
2001-12-13 Well Mode changed to Abandoned Zone
2001-12-14 Perforation Treatment Performed - Jet Perforation
2001-12-14 Well Log Performed
2009-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-14 Plug Back Performed
2009-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-15 Perforation Treatment Performed - Jet Perforation
2009-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-16 Perforation Treatment Performed - Remedial Casing
2009-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-17 Perforation Treatment Performed - Jet Perforation
2009-11-18 Perforation Treatment Performed - Jet Perforation
2009-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-19 Perforation Treatment Performed - Remedial Casing
2009-11-20 Perforation Treatment Performed - Jet Perforation
2009-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-21 Perforation Treatment Performed - Remedial Casing
2009-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-22 Perforation Treatment Performed - Remedial Casing
2009-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-23 Perforation Treatment Performed - Jet Perforation
2009-11-23 Perforation Treatment Performed - Remedial Casing
2009-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-24 Perforation Treatment Performed - Jet Perforation
2009-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-25 Perforation Treatment Performed - Remedial Casing
2009-12-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-17 Perforation 1849.00 1849.50 17
2009-11-16 Remedial Casing Cementing 710.00 711.00 0
2009-11-16 Packing Device Capped w/Cement 698.00 706.00 0
2009-11-17 Perforation 660.00 661.00 14
2009-11-17 Packing Device Capped w/Cement 661.00 663.00 0
2009-11-18 Perforation 510.00 511.00 14
2009-11-19 Remedial Casing Cementing 660.00 661.00 0
2009-11-19 Packing Device Capped w/Cement 649.00 657.00 0
2009-11-20 Perforation 584.00 585.00 14
2009-11-21 Packing Device Capped w/Cement 585.00 587.00 0
2009-11-21 Remedial Casing Cementing 584.00 585.00 0
2001-08-17 Perforation 1855.00 1856.00 17
2009-11-21 Packing Device Capped w/Cement 574.00 582.00 0
2009-11-22 Packing Device Capped w/Cement 511.00 513.00 0
2009-11-22 Remedial Casing Cementing 510.00 511.00 0
2009-11-22 Packing Device Capped w/Cement 500.00 508.00 0
2009-11-23 Perforation 455.00 456.00 14
2009-11-23 Packing Device Capped w/Cement 456.00 458.00 0
2009-11-23 Remedial Casing Cementing 455.00 456.00 0
2009-11-23 Packing Device Capped w/Cement 442.00 450.00 0
2009-11-24 Perforation 364.00 365.00 14
2009-11-24 Packing Device Capped w/Cement 365.00 367.00 0
2001-08-19 Fracture 1849.00 1849.50 0
2009-11-25 Remedial Casing Cementing 364.00 365.00 0
2009-11-25 Packing Device Capped w/Cement 351.00 359.00 0
2001-08-19 Fracture 1855.00 1856.00 0
2001-12-13 Packing Device Capped w/Cement 1832.00 1840.00 0
2001-12-14 Perforation 1791.00 1795.00 17
2009-11-14 Packing Device Capped w/Cement 1772.00 1780.00 0
2009-11-15 Perforation 710.00 711.00 14
2009-11-15 Packing Device Capped w/Cement 711.00 715.00 0

For data sources see[4]



References