X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495063016000

Well Details

Well ID: 0495063016000
Loading map...
Location: 00/16-30-049-06W5/0
Location Alias: 00/16-30-49-06 W5M
Location Alias 2: 00/16-30-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 30
County/Municipality: Brazeau County
Well Name: IMP CDN-SUP PEMBINA 16-30C-49-6
Operator Name: ARC Resources Ltd.
License Number: 0016051
License Date: 1958-10-17
License Status: Issued
Spud Date: 1958-10-28
Final Drill Date: 1958-11-06
Well Total Depth: 1330.10 m
Surface Hole Latitude: 53.263297
Surface Hole Longitude: -114.858111

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-17 Obtained License
1958-11-04 Drill Stem Test Performed
1958-11-06 Finished Drilling
1958-11-06 Well Mode changed to Drilled and Cased
1958-11-10 Production Casing Operation Performed
1958-11-19 Perforation Treatment Performed - Fractured
1958-11-19 Perforation Treatment Performed - Jet Perforation
1958-11-30 Well Began Production
1958-11-30 Well Fluid changed to Crude Oil
1958-11-30 Well Mode changed to Flowing
1967-05-05 Well Fluid changed to Crude Oil
1967-05-05 Well Mode changed to Pumping
1974-01-01 Well Type changed to Observation
1977-10-06 Well Fluid changed to Crude Oil
1977-10-06 Well Mode changed to Pumping
1986-07-25 Perforation Treatment Performed - Jet Perforation
1986-07-25 Well Log Performed
1986-07-31 Perforation Treatment Performed - Fractured
1989-11-24 Well Fluid changed to Crude Oil
1989-11-24 Well Mode changed to Suspended
1991-12-01 Well Fluid changed to Crude Oil
1991-12-01 Well Mode changed to Pumping
1992-11-13 Well Log Performed
1992-12-01 Well Began Injection
1992-12-01 Well Fluid changed to Water
1992-12-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-11-19 Perforation 1299.70 1300.90 7
1986-07-25 Perforation 1299.00 1308.10 13
1986-07-31 Fracture 1299.00 1308.10 0
1958-11-19 Perforation 1301.80 1301.80 7
1958-11-19 Perforation 1302.10 1302.40 7
1958-11-19 Perforation 1302.40 1303.60 7
1958-11-19 Perforation 1304.20 1304.50 7
1958-11-19 Perforation 1306.10 1306.70 7
1958-11-19 Perforation 1306.70 1307.30 7
1958-11-19 Perforation 1308.20 1308.80 7
1958-11-19 Fracture 1299.70 1308.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5248 0.0 0.0 0.0
1968 8735 0.0 0.0 0.0
1969 8735 0.0 0.0 0.0
1970 8640 0.0 0.0 0.0
1971 8578 0.0 0.0 0.0
1972 8142 0.0 0.0 0.0
1973 1260 0.0 0.0 0.0
1977 1868 0.0 0.0 0.0
1978 8385 0.0 0.0 0.0
1979 7349 0.0 0.0 0.0
1980 8437 0.0 0.0 0.0
1981 8351 0.0 0.0 0.0
1982 7800 0.0 0.0 0.0
1983 8485 0.0 0.0 0.0
1984 8334 0.0 0.0 0.0
1985 6996 0.0 0.0 0.0
1986 6960 0.0 0.0 0.0
1987 8233 0.0 0.0 0.0
1988 7780 0.0 0.0 0.0
1989 7544 0.0 0.0 0.0
1991 264 0.0 0.0 0.0
1992 7037 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References